BRR : 8757125
Tender Brief : Annual Rate Contract For Repair Maintenance Of Submersible Vt Pumps Allied Works Annual Rate Contract For Repair Maintenance Of Submersible Vt Pumps Allied Works , Sub Pump V4 , Disconnecting Of Power Connections From Starter Panel , Disengaging From Delivery Bend And Extracting Out Submersible Pump Set Complete Along With Column Pipes By Hoisting Chain Pulley Block At Tubewell , Stacking Of Column Pipes And Submersible Cable Properly And Dismantling Of Nrv . , Loading Of Submersible Pump Set In Mechanical Transport , Carriage To The Workshop And Unloading . Dismantling Of Submersible... Read More
Tender Value
₹
75,00,000
Submission Date
22-06-2020
Participated Bidder List
9 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | |||||
| 3 | cnet-technologies | Bid Analytics | |||||
| 4 | cnet-technologies | Bid Analytics | |||||
| 5 | cnet-technologies | Bid Analytics | |||||
| 6 | cnet-technologies | Bid Analytics | |||||
| 7 | cnet-technologies | Bid Analytics | |||||
| 8 | cnet-technologies | Bid Analytics | |||||
| 9 | cnet-technologies | Bid Analytics |
Work Detail
annual rate contract for repair maintenance of submersible vt pumps allied works annual rate contract for repair maintenance of submersible vt pumps allied works , sub pump v4 , disconnecting of power connections from starter panel , disengaging from delivery bend and extracting out submersible pump set complete along with column pipes by hoisting chain pulley block at tubewell , stacking of column pipes and submersible cable properly and dismantling of nrv . , loading of submersible pump set in mechanical transport , carriage to the workshop and unloading . dismantling of submersible pump set at workshop and checking for its repair . , repairing to pump shaft by way of welding , turning and polishing to the actual size , making of key way . , providing and fitting of new pump shaft . , providing and fitting of new impeller . , providing and fitting of new neck ring . , providing and fitting of shaft sleeve . , providing and fitting of coupling with key . , providing and fitting of bearing bush . , providing and fitting of bowl , providing and fitting of diffuser . , repairing of rotor shaft by way of welding to ends , turning and polishing to the required size . , providing and fitting of thrust bearing set , providing and fitting of bearing bush for motor bowl , providing and fitting of motor bowl upper/ lower , assembling of pump and then coupling with motor with proper alignment . testing in test pit at workshop . loading in mechanical transport and carriage back to site of work and unloading at site , making of cable connection of motor with submersible cable after dressing cable ends properly . making of each joint water proof . lowering of submersible pump set complete along with column pipes and submersible cable with providing & fitting of jointing material and nuts and bolts . making of connections to the starter panel and testing thereof . , sub pump v6 , disconnecting of power connections from starter panel , disengaging from delivery bend and extracting out submersible pump set complete along with column pipes by hoisting chain pulley block at tubewell , stacking of column pipes and submersible cable properly and dismantling of nrv . , loading of submersible pump set in mechanical transport , carriage to the workshop and unloading . dismantling of submersible pump set at workshop and checking for its repair . , repairing to pump shaft by way of welding , turning and polishing to the actual size , making of key way . , providing and fitting of new pump shaft . , providing and fitting of new impeller . , providing and fitting of new neck ring . , providing and fitting of shaft sleeve . , providing and fitting of coupling with key . , providing and fitting of bearing bush . , providing and fitting of bowl , providing and fitting of diffuser . , repairing of rotor shaft by way of welding to ends , turning and polishing to the required size . , providing and fitting of thrust bearing set , providing and fitting of bearing bush for motor bowl , providing and fitting of motor bowl upper/ lower , assembling of pump and then coupling with motor with proper alignment . testing in test pit at workshop . loading in mechanical transport and carriage back to site of work and unloading at site , making of cable connection of motor with submersible cable after dressing cable ends properly . making of each joint water proof . lowering of submersible pump set complete along with column pipes and submersible cable with providing & fitting of jointing material and nuts and bolts . making of connections to the starter panel and testing thereof . , sub pump v8 , disconnecting of power connections from starter panel , disengaging from delivery bend and extracting out submersible pump set complete along with column pipes by hoisting chain pulley block at tubewell , stacking of column pipes and submersible cable properly and dismantling of nrv . , loading of submersible pump set in mechanical transport , carriage to the workshop and unloading . dismantling of submersible pump set at workshop and checking for its repair . , repairing to pump shaft by way of welding , turning and polishing to the actual size , making of key way . , providing and fitting of new pump shaft . , providing and fitting of new impeller . , providing and fitting of new neck ring . , providing and fitting of shaft sleeve . , providing and fitting of coupling with key . , providing and fitting of bearing bush . , providing and fitting of bowl , providing and fitting of diffuser . , repairing of rotor shaft by way of welding to ends , turning and polishing to the required size . , providing and fitting of thrust bearing set , providing and fitting of bearing bush for motor bowl , providing and fitting of motor bowl upper/ lower , assembling of pump and then coupling with motor with proper alignment . testing in test pit at workshop . loading in mechanical transport and carriage back to site of work and unloading at site , making of cable connection of motor with submersible cable after dressing cable ends properly . making of each joint water proof . lowering of submersible pump set complete along with column pipes and submersible cable with providing & fitting of jointing material and nuts and bolts . making of connections to the starter panel and testing thereof . , sub pump v10 , disconnecting of power connections from starter panel , disengaging from delivery bend and extracting out submersible pump set complete along with column pipes by hoisting chain pulley block at tubewell , stacking of column pipes and submersible cable properly and dismantling of nrv . , loading of submersible pump set in mechanical transport , carriage to the workshop and unloading . dismantling of submersible pump set at workshop and checking for its repair . , repairing to pump shaft by way of welding , turning and polishing to the actual size , making of key way . , providing and fitting of new pump shaft . , providing and fitting of new impeller . , providing and fitting of new neck ring . , providing and fitting of shaft sleeve . , providing and fitting of coupling with key . , providing and fitting of bearing bush . , providing and fitting of bowl , providing and fitting of diffuser . , repairing of rotor shaft by way of welding to ends , turning and polishing to the required size . , providing and fitting of thrust bearing set , providing and fitting of bearing bush for motor bowl , providing and fitting of motor bowl upper/ lower , assembling of pump and then coupling with motor with proper alignment . testing in test pit at workshop . loading in mechanical transport and carriage back to site of work and unloading at site , making of cable connection of motor with submersible cable after dressing cable ends properly . making of each joint water proof . lowering of submersible pump set complete along with column pipes and submersible cable with providing & fitting of jointing material and nuts and bolts . making of connections to the starter panel and testing thereof . , vt pump 1 . 80 lac gph x 34 . 5 mtr . , extraction of vt pump set complete including liner assembly and pump assembly after disconnecting of all the power connections , dismounting of motor using special tools and tackles , skilled man power . , loading of complete pump set into mechanical transport and carriage to workshop and unloading thereof . , dismantling of pump assembly , checking of parts needs to be repaired/ replaced including liner assembly . , dismantling of pump assembly , checking of parts needs to be repaired/ replaced including liner assembly . , lowering of vt pump set complete including linear assembly with proper alignment , fitting of discharge head , delivery line , packing box , ratchet assembly , coupling pulley and fitting of motor . making of connections , check
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid
Similar Tenders Results