BRR : 8616672
Tender Brief : Tender for Earth Work In Excavation Of Foundation Trenches Or Drains In All Sorts Of Soil (Including Mixed Soil But Excluding Laterite Or Sand Stone) Including Removing, Spreading Or Stacking The Spoils Within A Lead Of 75M. As Directed. The Item Includes Necessary Trimming The Sides Of Trenches, Levelling, Dressing And Ramming The Bottom, Bailing Out Water As Required Complete. (A) Depth Of Excavation Not Exceeding 1.500 Mm. , Laying 150 Mm. To 200 Mm. Boulder Soling Including Rough Dressing Hand Packing And Ramming Down Small Pieces In The Interstics Without Rolling But Including Ramming. ,... Read More
Tender Value
₹
1,50,748
Contract Value
₹ 1,50,672.24
Saving / Difference
₹ 76
▲
Submission Date
12-11-2025
Contract Date
17-01-2026
Completion Date
30 days
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 1,55,722.28 | L3 | |||
| 2 | cnet-technologies | Bid Analytics | 1,50,672.24 | L1 | |||
| 3 | cnet-technologies | Bid Analytics | 1,54,365.55 | L2 |
Work Detail
tender for earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) depth of excavation not exceeding 1.500 mm. , laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming. , cost of stone boulder 150 mm size delivered ans stacked at site. , cement concrete (mix 1:3:6) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant is codes. (b)river bazree. , plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. (i) (1:3:6) proportion. , hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor). (f) 25 mm. to 30 mm. without staging in foundation , gst 18% , cess 1% please enable macros to view boq information
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results