BRR : 8520870
Click Here To View Tendering Authority. Aoc City/State :  Yamunanagar, Haryana
Tender Brief : Overhauling of pressure part in Unit-II, at 2x300 MW, DCRTPP, HPGCL, Yamuna Nagar--- 1 Overhauling of pressure part in Unit-II,DCRTPP,Yamunanagar 2 Overhauling of pressure part of Boiler in Unit-II(Part-A) 3 Supply erection and dismentaling of cup lock scaffolding(Part-A) 4 Removing of ECO coil (upper & lower) repositioning after carrying out repair/ replacement wherever required. ( HP joints and radiography executing)(Part-B) 5 Removing of LTSH coil (upper & lower) repositioning after carrying out repair/ replacement wherever required.(HP joints and radiography executing) (Part-B) 6 Re... Read More
Tender Value
Ref. Document
Contract Value
₹ 1,66,05,137
Submission Date
03-11-2025
Contract Date
31-12-2025
Completion Date
60 days
Participated Bidder List
3 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 2,14,95,369 L3
2 cnet-technologies Bid Analytics 1,66,05,137 L1
3 cnet-technologies Bid Analytics 1,89,11,565 L1
Work Detail
overhauling of pressure part in unit-ii, at 2x300 mw, dcrtpp, hpgcl, yamuna nagar--- 1 overhauling of pressure part in unit-ii,dcrtpp,yamunanagar 2 overhauling of pressure part of boiler in unit-ii(part-a) 3 supply erection and dismentaling of cup lock scaffolding(part-a) 4 removing of eco coil (upper & lower) repositioning after carrying out repair/ replacement wherever required. ( hp joints and radiography executing)(part-b) 5 removing of ltsh coil (upper & lower) repositioning after carrying out repair/ replacement wherever required.(hp joints and radiography executing) (part-b) 6 repair & replacement of any castle baffle (part-b) 7 replacement of shield/ shroud (part-b) 8 providing refractory (part-b) 9 hp joints including cutting edge preparation etc up to 76 dia mm(part-b) 10 man hour rates (including t&p, gas consumable etc.)skilled labor / welder (part-b) 11 man hour rates (including t&p, gas consumable etc.)semi - skilled(part-b) 12 man hour rates (including t&p, gas consumable etc.)un - skilled (part-b) 13 repair of coal burner & nozzle tip.(part-b) 14 replacement of coal burner and nozzle tip with spare assembly(part-b) 15 fin welding. (part-b) 16 providing of orifice in spray line up to 150 mm (part-b) 17 providing hooks wire mesh and refractory on bend tubes of manholes (part-b) 18 providing hooks wire mesh and refractory on bend tubes of peepholes (part-b) 19 patching work by welding 5 mm plate (part-b) 20 restoration of sagged tubes of boiler 1st pass rediant tubes (part-b) 21 replacement of wom out boiler tubes (part-b) 22 replacement of skin casing of pent house (part-b) 23 retention/ early removal of cup lock scaffolding (part-b)
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download f4802af8-082d-445e-aa1a-5a0e4915d356
Download boqcomparativechart
Download finsummary_546555
Download LOI386
Download techsummary_546555
Download File Name File Description
Download 7b1f29b5-4cda-47e0-b4f3-425472094d7a Tender Documents
Download BOQ_546555 Tender Documents
Download Tendernotice_1 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000
Similar Tenders Results
TenderDetail
Loading tenders