BRR : 8477382
Tender Brief : Tender For Repair And Maintenance Of Mt B Vehicles And Allied Work Under Ge(N) Patiala; 1 Periodical servicing and fixing of Parts of vehicle 02 Nos TATA Mobile BA No 04C-070645A, 07C-081140W, 01 Nos Tata Yodha BA No NYAand 01 Nos TATA Xenon BA No 21C-109690P. Each two times at interval of Five Months as per manufacture instruction including attending faults on call basis for normal repairs in MT yard of AGE E/M/maintenance and servicing in reputable workshop as directed by Engr-in-Charge, including transportation of vehicle from MT Yard or where as unserviceable and transport back to MT Yar... Read More
Tender Value
₹
15,00,000
Contract Value
₹ 13,47,720
Saving / Difference
₹ 1,52,280
▲
Submission Date
29-10-2025
Contract Date
23-12-2025
Completion Date
270 days
Participated Bidder List
4 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | 14,97,997 | L2 | |||
| 3 | cnet-technologies | Bid Analytics | 13,23,364 | L1 | |||
| 4 | cnet-technologies | Bid Analytics |
Work Detail
tender for repair and maintenance of mt b vehicles and allied work under ge(n) patiala; 1 periodical servicing and fixing of parts of vehicle 02 nos tata mobile ba no 04c-070645a, 07c-081140w, 01 nos tata yodha ba no nyaand 01 nos tata xenon ba no 21c-109690p. each two times at interval of five months as per manufacture instruction including attending faults on call basis for normal repairs in mt yard of age e/m/maintenance and servicing in reputable workshop as directed by engr-in-charge, including transportation of vehicle from mt yard or where as unserviceable and transport back to mt yard, replacement of defective parts, engine oil,gere oil,coolent etc attending faults of mechanical/electrical nature etc, tappet settings if required, cleaning and tightening of loose fastener and tune up the engine, greasing of bearings and alternator, checking of batteries, applying petroleum jelly to battery terminals, adding distilled water, checking the oil, coolent levels of vehicle of tata mobile/yodha/ xenoncomplete all as specified and directed by engr-in-charge.note:-spare parts,engine oil, coolent etc which ever is required measured and paid separately. 2 labour for repair,servicing /adjustmentto front & rear hub wheel assy and brake system of veh. tata mobile/tata yodha/ xenon after opening and taking out all four drums from wheel and taking out old unserviceable wheel bearing from front and rear wheels, greasing wheel hubs complete, filling of brake fluid and bleeding the brake system with brake fuild.assembling of wheels and testing the brake system including balancing on computer machine and wheel alignment of tata mobile/ yodha/ xenon vehicle complete for smooth functioning of vehicle on roadcomplete all as specified and directed by engr-in-charge. note:-spare parts which ever is required measured and paid separately. 3 labour only for dismantling and taking out clutch system of tata mobile/yodha/xenon veh and cleaning of all surfaces/parts completely and testingcomplete all as specified and directed by engr-in-charge. note:-spare parts which ever is required measured and paid separately. 4 labour only for taking down gear box & differential of tata mobile/yodha/ xenon veh for repair and overhauling and re-assembling after repair and testing etc complete all as specified and directed by engr-in-charge. note:-spare parts which ever is required measured and paid separately. 5 labour only for taking down steering system tata mobile/yodha/xenon and re-fixing after repair and testing complete all as specified and directed by engr-in-charge. note:-spare parts which ever is required measured and paid separately. 6 labour only for taking down suspension system of tata mobile/yodha/xenon veh complete for repair/overhauling including cleaning/greasing of leaf springs and re-assembling and re-fixing in existing position after repair and testing complete with wheel balancing and alignment all as specified and directed by engr-in-charge. note:-spare parts which ever is required measured and paid separately. 7 labour for repair of self starter assy of tata mobile/yodha/xenonafter replacing the unserviceable parts and refixing complete all as specified and directed by engr-in-charge. 8 material and labour for checking of all electricial system and wiring of tata mobile/yodha/xenon and replacement of all unserviceable electrical wiring including connectors, broken joints and burnt wire/leads and testing etc complete all as specified and directed by engr-in-charge 9 m & l for taking down and refixing after cleaning of the radiator of tata mobile/yodha/ xenon veh and repairs of soldering leakage of tubes and testing after repairs complete all as specified and directed by engr-in-charge. 10 m&l for repair of alternator of tata mobile/yodha/xenon and replace allunserviceable parts such as cut out, seal,slipring etc complete all as specified and directed. 11 m&l cleaning the diesel tank dismantling fuel tank from vehicle tata mobile/yodha/ xenon,cutting the diesel tank cleaning it welding it & fixing in the same positionall as specified and directed by engr-in-charge. 12 material and labour only for repair overhauling of fuel injection pump taking out fuel injection pump from vehicle tata mobile/yodha/xenon and refix in the same position after repair/replacement of unserviceable parts such as element,delivery valve,nozzle,disc washer, tappet roller,governor shaft,service kit etc and testing complete all as specified and directed by engr-in-charge. 13 supply only for renewal of fuel filter complete(each set of 2 nos) standard tata spare parts 14 supply only for renewal of oil filter completestandard tata spare parts 15 supply only for renewal of air filter complete standard tata spare parts 16 supply only for renewal of engine oil complete grade sae 15w40. make castrol 17 supply only for renewal gear box oil. make castrol 18 supplyand fix only for renewal of tie rod ends (l&r) complete (each set of 4 nos) 19 supply and fix only for renewal of ball & socket jointassemblycomplete 20 supply and fix suspension kit with all connected items as directed by engr in charge 21 supply and fix dipper assembly complete set and connected items complete 22 supply and fix only for renewalof clutch plate complete set with connected items. 23 supply and fix only for renewal of clutch pressure plate completestandard tata spare parts 24 supply and fix gear shifter sleeve 1st & 2nd gear complete including bush, packing, split nuts and all connected items complete as directed by eic 25 supply and fixengaging gear 1st & 2nd gear complete including bush, packing, split nuts and all connected items complete as directed by eic 26 m & l for repair of flywheel ring with connected items complete as directed by eic. 27 supply and fix center pin bush kit with connected items complete as directed by eic. 28 supply and fix for renewal of brake pad set with lock (each set of 2 nos) complete standard tata spare parts complete as directed by eic 29 supply and fix only for renewal of brake booster complete standard tata spare partscomplete as directed by eic 30 supply and fixonly for renewal of brake shoe complete(each set of 2 nos)standard tata spare partscomplete as directed by eic 31 supply and fix only for renewal of assy. caliper brake lh/rh complete standard tata spare partscomplete as directed by eic 32 supply and fixonly for renewal of master cylinder assy complete standard tata spare partscomplete as directed by eic 33 supply and fix only for renewal of wheel cylinder assy complete standard tata spare partscomplete as directed by eic 34 supply and fix only for renewal of brake/cultch/accelerator pedal rubber boot set complete 35 supply and fix only for renewal of door glass gear assy for opening and closing complete. cat no 265472500128/ standard tata spare parts 36 supply and fix only for renewal of rubberizeddoor channel left/right (04 nos) complete as approved by engr-in-charge 37 supply and fixonly for renewal of carbon bush set of 2 complete 38 supply and fix only for renewal of main bearings wheel complete 39 supply and fix only for renewal of bush bearings complete 40 supply and fix only steering yoke and teeth complete. 41 supply and fix only for renewal of pinion bearing assembly complete with all connected items as directed by eic. 42 supply and fix only for renewal of switch assy magnetic complete with all connected items as directed by eic. 43 supply and fix ignition switch with all connected items as directed by eic. 44 supply and fix armature assembly with all connected items as directed by eic. 45 supply and fix only solenoid switch 46 supply and fix only for renewal of fuel secondary pump complete with all connected items as directed by eic. 47 supply and fix only for renewal of water hose pipe complete with all connected items as directed by eic 48 supply and fix only for renewal of fan v beltcomplete with all connected items as directed by eic. 49 supply and fix only for renewal of tensioner timing beltcomplete with all connected items as directed by eic 50 supply and fix only for renewal of water pump assy complete with all connected items as directed by eic 51 supply and fix only for renewal of side view mirror complete with all connected items as directed by eic (each set of two) . 52 supply and fix only for renewal of wiper arm &blade complete with all connected items as directed by eic (each set of two) 53 supply and fix only for renewal of tail light assembly complete with all connected items as directed by eic 54 supply and fix only for renewal of head light assembly complete with all connected items as directed by eic 55 supply and fix head light relay with all connected items as directed by eic 56 supply and fix only for renewal of wheel mud guard complete with all connected items as directed by eic 57 supply and fix only for renewal of shock absorbercomplete with all connected items as directed by eic 58 supply and fixonly for renewal of taper roller bearing outer complete with all connected items as directed by eic 59 supply and fix only for renewal of gear changing rod with plate & gasket complete with all connected items as directed by eic 60 supply and fix only for renewal of shaft assy rocker inlet and exhaust complete with all connected items as directed by eic 61 supply and fix only for renewal of cylinder head gasket complete 62 supply and fix only for renewal of tail light relay complete 63 supply and fix only for renewal of kamanirakab/d clamp complete 64 supply and fix only for renewal of spring leaf pad / coil spring pad complete 65 supply and fix only for renewal of kamani bush kit 66 supply and fix only for renewal of door handle with lock set and door lock knob complete as specified and directed by engr in charge 67 supply and fix only for renewal of alternator cut out with all connected items as directed by eic 68 supply and fix only for renewal of alternator starter assy with all connected items as directed by eic 69 supply and fix only for renewal of alternator bearing. 70 suppy only for renewal of front & back, left/right hand indicator assembly ( each set ) 71 suppy and fix only for renewal of fuse 72 suppy and fix only for renewal of wiper water pipe 73 supply and fix only for renewal of wheel seal 74 supply and fix only for renewal of gear lever patti 75 supply and fix only for renewal of timing belt valve 76 supply and fix only for renewal of timing bearing 77 supply and fix only for renewal of wheel nut bolt 78 supply and fix only for renewal of timing seal kit 79 supply and fix only for renewal of propelller shaft bearings 80 supply and fix only for renewal of shocker bush 81 supply and fixonly for renewal of gear lever bush and nut 82 supply and fix only for renewal of nozzle pipe. 83 supply and fix only for renewal of horn assembly 84 supply and fix only for renewal of chain and garari set complete 85 supply and fix only for renewal of sprocket and drum assy complete 86 supply and fix for renewal of wiper motor 87 supply and fix only for renewal of steering ignition lock 88 all activity complete as per item no 01 as above but swift dzire ba no 22b-137477y and swift dzire 23b-138633n. periodical servicing of vehicle swift dzire each two times at interval of five months as per manufacture instruction including attending faults on call basis for normal repairs in mt yard of age e/m/maintenance and servicing in reputated/ authorisedworkshop as directed by engr-in-charge, including transportation of vehicle from mt yard or where as unserviceable and transport back to mt yard, replacement of defective parts, engine oil, gear oil,coolent etc attending faults of machanical / electrical nature etc, tappet settings if required, cleaning and tightening of loose fastener and tune up the engine, greasing of bearings and alternator, checking of batteries, applying petroleum jelly to battery terminals, adding distilled water, checking the oil, coolent levels of vehicle swift dzire complete all as specified and directed by engr-in-charge.note:-spare parts,engine oil, coolent etc which ever is required measured and paid separately. 89 labour for repair,servicing to wheel and brake system of vehicle swift dzire as per manufacture instruction including attending faults on call basis for normal repairs in mt yard of age e/m, reputated/ authorisedworkshop as directed by engr-in-charge, including transportation of vehicle from mt yard or where as unserviceable and transport back to mt yard.maintenance wheel and brake system after opening and taking out all four drums from wheel and taking out old unserviceable wheel bearing from front and rear wheels, greasing wheel hubs complete, filling of brake fluid in the brake system including drain out old brake oil.assembling of wheels and testing the brake system including balancing on computer machine and wheel alignment of swift dzire vehicle complete for smooth functioning of vehicle on roadcomplete all as specified and directed by engr-in-charge.note:-spare parts which ever is required measured and paid separately. 90 material and labour for checking of all electricial system and wiring of swift dzire and replacement of all unserviceable electrical wiring including connectors, broken joints and burnt wire/leads and testing etc complete all as specified and directed by engr-in-charge 91 servicing the ac system of vehicle swift dzire ba no 23b-138633n and 22b-137477y cleaning the ac system of vehicle taking out u/s parts if any and fixing new parts as required, testing and testing of the cooling of ac complete all as directed by eng-in-charge. 92 supply only for renewalof oil filter set complete 93 supply only for renewalof air filter complete 94 supply only for renewal of fuel filtercomplete (each set of 2 nos) 95 supply only for renewal of engine oil grade 5w30. make castrol 96 supply only for renewal of gear box oil grade 75w90. make castrol 97 supply only for renewal of steering cover complete 98 supply and fix only for renewal of rubberized gear lever boot complete 99 supply and fix only for renewal of master cylinder assy for swift dzire complete 100 supply and fix only for renewal of brake, clutch, accelerator rubber boot complete 101 supply and fix only for renewal of water hose pipe complete. 102 supply and fix only for renewal of fan v beltcomplete with all connected items as directed by eic. 103 supply and fix only for renewal of timer belt with all connected items as directed by eic. 104 material and labourrecharging of ac gas after overhauling the air-conditioning system, testing the cooling of vehicle complete as directed by eic. 105 supply and fix only for renewal of discharge pipe 106 supply and fix only for renewal ofsuction pipe 107 supply and fix only for renewal of liquid pipe 108 supply and fix only for renewal of blower pipe with all connected items as directed by eic 109 supply and fix only for ac cutout/switch complete 110 supply and fix only for renewal of oil pipe 111 supply and fix only for renewal of water pump assembly 112 all activity complete as per item no 01 as above for maruti omni ba no 18b-130753k 113 labour only for taking down and repair of clutch system of omni after repair/replacement of u/s items and testingcomplete all as specified and directed by engr-in-charge.spare parts which ever is required measured and paid separately. 114 labour for repair,servicing /adjustmentto front & rear hub wheel assy and brake system of veh. maruti omni after opening and taking out all four drums from wheel and taking out old unserviceable wheel bearing from front and rear wheels, greasing wheel hubs complete, filling of brake fluid and bleeding the brake system with brake fuild.assembling of wheels and testing the brake system including balancing on computer machine and wheel alignment of maruti omni vehicle complete for smooth functioning of vehicle on roadcomplete all as specified and directed by engr-in-charge. note:-spare parts which ever is required measured and paid separately. 115 labour only for taking down steering system maruti omni and re-fixing after repair and testing complete all as specified and directed by engr-in-charge. note:-spare parts which ever is required measured and paid in unit rate quoted 116 labour only for taking down suspension system of maruti omniveh complete for repair/overhauling including cleaning/greasing of leaf springs and re-assembling and re-fixing in existing position after repair and testing complete with wheel balancing and alignment all as specified and directed by engr-in-charge. note:-spare parts which ever is required measured and paid in unit rate quoted 117 material and labour for checking of all electricial system and wiring of omni and replacement of all unserviceable electrical wiring including connectors, broken joints and burnt wire/leads and testing etc complete all as specified and directed by engr-in-charge 118 supply only for renewal of fuel filter complete(each set of 2 nos) 119 supply only for renewal of oil filter complete 120 supply only for renewal of air filter complete 121 supply only for renewal of engine oil. grade 5w30 make castrol 122 supply only for renewal of gear box oil. make castrol 123 supply only for renewal of steering cover complete 124 supply and fixonly for renewal of clutch bearing replacementcomplete with all connected items as directed by eic 125 supply and fix flywheel turning for gear shifting improvement complete as specified by eic 126 supply and fixonly for renewal of clutch forkcomplete 127 supply and fix forreplacement of water pump, water pump bearing, timing cover gasket and timing cover seal in omni complete all specified by eic 128 supply and fix only for renewal of pedal set for brake clutch and accelerator 129 material and labour for repair of heater/spark plugs cleaning and overhaulingin omni as specified by eic 130 supply and fix only for renewal of brake shoe complete 131 supply and fix only for renewal of disc pad set complete 132 supply and fix only for renewal of master cylinder assy complete 133 supply and fix only for renewal of wheel cylinder assy complete 134 supply and fix only for renewal of water hose pipe complete. 135 supply and fix only for renewal of fan v beltcomplete as per existing sample. 136 supply and fix only for renewal of timer belt complete. 137 supply and fix only for renewal of side view mirror complete l/r. 138 supply and fix only for renewal of wiper arm &blade complete(each set of 2 nos) 139 supply and fix only for renewal of wheel mud guard complete. 140 supply and fixonly for renewal of wheel cover complete with connected items 141 m & l for repair of self starterand taking out and refixing of the self starter from the engine, after replacement of unserviceable carbon bush and solenoid valveandcomplete 142 supply and fix only for renewal of upper and lower suspension bush complete 143 repair of radiator assy of maruti omni and replacement of unserviceable parts complete as directed by eic 144 supply and fix only for repair overhauling of ignition coil, high tension lead cable and distribution kitafter replacement of unserviceable parts complete 145 material and labour for repair of silencer assy complete 146 material and labour only for repair overhauling of fuel injection pump taking out fuel injection pump from vehicle and refix in the same position after repair/replacement of unserviceable parts such as element,delivery valve,nozzle,disc washer, tappet roller,governor shaft,service kit etc and testing complete all as specified and directed by engr-in-charge. 147 all activity complete as per item no 01 as above but maruti ertiga smart hybrid lxi 1.5 l periodical servicing of vehicle ertiga ba no 23b-139472yeach two times at interval of five months as per manufacture instruction including attending faults on call basis for normal repairs in mt yard of age e/m/maintenance and servicing in reputated/ authorisedworkshop as directed by engr-in-charge, including transportation of vehicle from mt yard or where as unserviceable and transport back to mt yard, replacement of defective parts, engine oil, gear oil,coolent etc attending faults of machanical / electrical nature etc, tappet settings if required, cleaning and tightening of loose fastener and tune up the engine, greasing of bearings and alternator, checking of batteries, applying petroleum jelly to battery terminals, adding distilled water, checking the oil, coolent levels of vehicle ertiga complete all as specified and directed by engr-in-charge. note:-spare parts,engine oil, coolent etc which ever is required measured and paid separately. 148 labour for repair,servicing to wheel and brake system of vehicle maruti ertiga smart hybrid as per manufacture instruction including attending faults on call basis for normal repairs in mt yard of age e/m, reputated/ authorisedworkshop as directed by engr-in-charge, including transportation of vehicle from mt yard or where as unserviceable and transport back to mt yard.maintenance wheel and brake system after opening and taking out all four drums from wheel and taking out old unserviceable wheel bearing from front and rear wheels, greasing wheel hubs complete, filling of brake fluid in the brake system including drain out old brake oil.assembling of wheels and testing the brake system including balancing on computer machine and wheel alignment of ertiga vehicle complete for smooth functioning of vehicle on roadcomplete all as specified and directed by engr-in-charge. note:-spare parts which ever is required measured and paid separately. 149 servicing the ac system of vehicle maruti ertiga ba no 23b-139472y , cleaning the ac system of vehicle taking out u/s parts if any and fixing new parts as required, testing the cooling of ac complete all as directed by eng-in-charge. 150 supply and fix only for renewal of fuel filtercomplete 151 supply and fix only for renewalof oil filter complete 152 supply and fix only for renewalof air filter complete 153 supply and fix only for renewal of engine oil grade 5w30. make castrol 154 supply and fix renewal of discharge pipe for ertiga complete all specified by eic 155 supply and fix renewal of suction pipe for ertiga complete all specified by eic 156 supply and fix renewal of liquid pipe for ertiga complete all specified by eic 157 supply and fix renewal of blower pipe for ertiga complete all specified by eic 158 material and labour for renewal of water hose pipe and replacement of water pump packing complete all as specified and directed 159 material and labourrecharging of ac gas after overhauling the air-conditioning system, testing the cooling of vehicle complete as directed by eic. 160 material and labour for checking of all electricial system and wiring of ertiga and replacement of all unserviceable electrical wiring including connectors, broken joints and burnt wire/leads, battery connections and testing etc complete all as specified and directed by engr-in-charge 161 all activity complete as per item no 01 as above butfor 05 nos eicher ba no 25d-214087y, 25d-214074w, 24d-213313y,11d-187283l & 14d-195136y. 162 labour only for taking down and repair of clutch system of eicher after repair/replacement of u/s items and testingcomplete all as specified and directed by engr-in-charge.spare parts which ever is required measured and paid separately. 163 labour only for taking down gear box of eicher for repair and overhauling and re-assembling after repair/replacement of unserviceable parts and testing etc complete all as specified and directed by engr-in-charge.spare parts which ever is required measured and paid separately. 164 labour only for taking down steering system eicher and re-fixing after repair/replacement of unserviceable items and testing complete all as specified and directed by engr-in-charge.spare parts which ever is required measured and paid separately. 165 labour only for taking down suspension system of eicher complete for repair/overhauling and re-assembling and re-fixing in existing position after repair/replacement of unserviceable items and testing complete all as specified and directed by engr-in-charge spare parts which ever is required measured and paid separately. 166 labour only for repairs of self starter assy of eicher after replacing the unserviceable parts and refixing after repair complete all as specified and directed by engr-in-charge.spare parts which ever is required measured and paid separately. 167 material and labour for checking of all electricial system and wiring of eicher and replacement of all unserviceable electrical wiring including connectors, broken joints and burnt wire/leads and testing etc complete all as specified and directed by engr-in-charge 168 m & l for taking down and refixing after cleaning of the radiator of eicher and repairs of soldering leakage of tubes and testing after repairs complete all as specified and directed by engr-in-charge. 169 m&l for taking down silencer assy from eicher and carryout cleaning including welding and refixing after cleaning including change of unserviceable nuts, bolts, clamp & washers etc complete all as specified and directed by engr -in-charge. 170 m&l cleaning the diesel tank dismantling fuel tank from vehicle eicher ,cutting the diesel tank cleaning it welding it & fixing in the same positionall as specified and directed by engr-in-charge. 171 material and labour for repair of fuel injection pump of eicher including taking out fip from vehicle and refix in the same position after replacement of unserviceable items whichevever required such as distributer head,vain pump,came plate,rollers,service kit etcand testing complete all as specified and directed by engr-in-charge. 172 m&l for painting of eicher veh after denting, scrabbing of old paint and filling of cavity with puitty and replacement of u/s portion of ms sheet and match with the existing with one coat of red oxide primer and two coat of paint as match with existing colour of bount and body complete including marking ofsign boards, arrow and numbering of vehicle complete all as specified and directed by engr-in-charge 173 supply and fix only for renewal of fuel filter assembly/ primary and secondary assemblycomplete ( set of 2) 174 supply and fixonly for renewal of oil filter complete 175 supply and fix only for renewal of air filter complete 176 supply and fix only for renewal of differential gear oil front and rear complete 177 supply and fix only for renewal of engine oil grade 15w40 make castrol 178 supply and fix only for renewal of brake fluid complete 179 supply and fix only for renewal of fuel pipe line from fuel filter to fuel tankcomplete 180 supply and fix only for renewal of tie rod ends assycomplete (each set of two) 181 supply and fix only for renewal of ball & socket jointassemblycomplete 182 supply and fix only for renewal of column assy complete 183 supply and fixonly for renewal of drag link complete 184 supply and fixonly for renewal of gear box assy complete 185 supply and fix only for renewal of steering cover complete 186 supply and fix only for renewal of clutch plate set complete . 187 supply only for renewal of clutch pressure plate set complete 188 supply and fix accelerator, brake, clutch pedal with all connected items including nut bolts 189 supply and fix clutch release bearing 190 supply and fix only for renewal of clutch master assemblycomplete 191 supply and fix only for renewal of clutch forkcomplete 192 material and labourfor repair of gear main shaft with all connected items as directed by eic 193 supply and fixonly synchronizer ring 1st and 2nd gear with all connected items as directed by eic 194 supply and fix only for renewal of bearing clutch release complete 195 supply and fix only for renewal of brake shoe complete 196 supply and fix only for renewal of brake pipe complete 197 supply and fix only for renewal of wheel cylinder assy complete 198 supply and fix only for renewal of brake/clutch/accelerator rubber boot complete 199 supply and fix only for renewal of door glass gear assy for opening and closing complete. 200 supply and fix only for renewal of rubberizeddoor channel left/right complete as approved by eic 201 supply and fix only for renewal of carbon bush set with all connected items as directed by eic 202 supply and fix only for renewal of wheel bearing with all connected items as directed by eic 203 supply and fix only for renewal of bush bearings with all connected items as directed by eic 204 supply and fix only for renewal of rotor assy for alternator with all connected items as directed by eic 205 supply and fix only for renewal of regulator assy for alternator with all connected items as directed by eic 206 supply and fixonly for renewal of holder s/a brush for alternator with all connected items as directed by eic 207 supply and fix only for renewal of water hose pipe complete. 208 supply and fix only for renewal of fan v beltcomplete as per existing sample. 209 supply and fix only for renewal of timer beltcomplete. 210 supply and fix only for renewal of water pump assy complete 211 supply and fix only for renewal of side view mirror complete l/rwith bracket( set of 2) . 212 supply and fix only for renewal of wiper arm &blade complete 213 supplyand fixonly for renewal of wiper motor complete 214 supply and fix only for taper roller bearings complete. 215 supply and fix only for renewal of cylinder roller bearing complete . 216 supply and fix only for renewal of tail light assembly complete 217 supply and fix only for renewal of head light assembly complete 218 supply and fix only for renewal of wheel mud guard complete with all connected items as directed by eic 219 supply and fixonly for renewal of crown pinon complete with all connected items as directed by eic 220 supply and fix only for renewal of differential oil seal complete 221 supply and fix hub front wheel with all connected items as directed by eic 222 supply and fix assembly clutch disc and cover with all connected items as directed by eic 223 supply and fix only for renewal of bush spring front suspension complete 224 supply and fix only for renewal of shaft cross complete 225 supply and fix only for renewal of clutch adjuster complete 226 supply and fix only for renewal of rim wheel seal complete 227 supply and fix only for renewal of kamani bush kit complete 228 supply and fix only for renewal of kamani sleaves complete 229 supply and fix only for renewal of kamani pad complete 230 supply and fix only for renewal of speedometer assy complete with all connected items as directed by eic 231 supply and fix only steering column with all connected items as directed by eic 232 supply and fix only fuel gauge meter with all connected items as directed by eic 233 all activity complete as per item no 01 as above but hero honda splendor plus 03 nos ba no 11a-062519e, 11a-062517e and 11a-062518k and hero c/d deluxe 02 nos ba no 20a 072184a, 20a-072185x bajaj platina4 nos ba no 23a-076709k and ba no 23a-076708m and ba no 23a-077421xand ba no 23a-077422p. each two times at interval of five months as per manufacture instruction including attending faults on call basis for normal repairs in mt yard of age e/m/maintenance and servicing in reputable workshop for mt vehicles hero honda and cd deluxe bajaj platina including engine oil of required grade, checking & replacement of defective item complete all as per directed by the engr in charge .spare parts which ever is required measured and paid separately. 234 supply and fix only for renewal of spark plug make mico 235 labour for cleaning of spark plug as directed by eic 236 supply and fix only for renewal of accelerator cable 237 supply and fixonly for renewal of clutch wire 238 supply and fix only for renewal of air filter complete 239 labour for repair and overhauling of brake system offront wheel complete for cd deluxe/ splendor plus/platina as directed by eic 240 labour for repair and overhauling of brake system ofrear wheel complete for cd deluxe/ splendor plus/platina as directed by eic 241 supply and fix only for renewal of oil level dipstick complete 242 supply and fix only for renewal of ignition coil complete for cd deluxe/ splendor plus/platina as directed by eic 243 material and labour for repair of alternator set complete for cd deluxe/ splendor plus/platina as directed by eic 244 supply and fix only for renewal of side indicator rear & front set complete with all connected items as directed by eic 245 supply only for renewal of carburettor assembly with packing kit complete. 246 taking down opening, repair and cleaning of carburettor assembly and refixingcomplete with all connected items as directed by eic 247 supply and fix only for renewal of kick rubber 248 supply and fix only for renewal of footrest rubber 249 supply and fix only for renewal of starting relay complete 250 supply and fix only for renewal of winker relay complete 251 supply and fix only for renewal of piston ring set standard complete 252 supply and fix only for renewal of oil seal and gasket engine cylinder head complete 253 labour for repair and overhaulingof front shocker complete for cd deluxe/ splendor plus/platina as directed by eic 254 labour for repair and overhaulingof rear shocker complete for cd deluxe/ splendor plus/platina as directed by eic 255 supply and fix only for renewal of chain & garari set complete 256 supply and fix only for renewal of head light complete with all connected items as directed by eic 257 supply and fix only for renewal of tail light complete with all connected items as directed by eic 258 supply and fixonly for renewal of switch lock set complete. 259 taking down opening up repair and refixing for renewal of silencer assy complete with all connected items as directed by eic 260 supply only for renewal of clutch plate set complete 261 supply only for renewal of sprocket and drum assy complete 262 supply only for renewal of horn assy complete 263 material and labourfor removal of dents from body parts of veh (tata mobile, yodha, xenon, ertiga, eicher, omni, swift dzire and any staff car) such as bumpers, door, bount, roof, tail bond etc and applying two coats of solid paint matching with existing paint over onecoat of primer & apply of putty as required also on dented portions only complete all as specified and directed. (paint k2 of make dulux, nerolac, asian) 264 material and labourfor renewal of ba number plate (laminated),,symbols stickers, writing vehicle number with paint as per existing on any vehiclesall as specified anddirected . 265 supply and fix for renewalof battery 12 volt, 60 to 80 ahcomplete with nut and bolts & batteryterminal, all as specified and directed.make : exide/amaron. 266 supply and fix for renewalof battery 12 volt, 2.5 to 5.0 ahcomplete with nut and bolts & batteryterminal , all as specified and directed.make : exide /amaron. 267 supply and fix for renewalof seats cover including roof cover tarpoline for complete eicher vehicle all as specified and directed as specified & directed. 268 supply and fix for renewalof seats coverfor motor cycle vehicle cd deluxe/platina/s[plendorall as specified and directed as specified & directed. 269 supply only for grease for hub, wheel bearings bushings and nipple for any veh. 270 supply only for veh of perfume ambipure-godrej as specified & directed 271 supply only for veh of tyre shiner-266ml as specified & directed 272 supply only for veh of dash board polish-110ml as specified & directed 273 supply only for veh of body polish-60gm as specified & directed 274 material and labourfor wheel alignment and wheel balancing which includes taking down all the wheel/tyre after unscrewing nuts & bolts, for wheel alignment, rotation of tyre as required & fixing the same after wheel balancing by computerised machine or equipments all as specified and directed 275 labour only for repair of any part of vehicle requiring additional lathe work, strip opening carefully, cleaning of connected parts, gas welding/breezing/ renewalof packing to stop/ prevent the leakage etc as specified & directed 276 m&l for making command sign and other required marking with paintfront and rear on vehcles tata mobile, eicher, motor cycle etc as per directed by eng-in-charge 277 toeing of brakedown vehicles exc. a distance of 10 km and upto 20 km as specified & directed 278 material and labourfor any type of electric or gas welding work for door,bonet,chassis,dalla,etc all as specified & directed 279 supply only coolant oil for tata mobile/xenon/ eicher/omni as required and directed by engr in charge. 280 supply and renewal distilled/ battery water (1ltr pack) as specified & directed 281 supply and renewal of brake oil(1ltr pack) for topping up of make castrol, servo, reliance, bosch, shell all as specified & directed 282 m&l for painting of maruti omni veh after denting, scrabbing of old paint and filling of cavity with puitty and replacement of u/s portion of ms sheet and match with the existing with one coat of red oxide primer and two coat of paint as match with existing colour of bount and body complete including marking ofsign boards, arrow and numbering of vehicle complete all as specified and directed by engr-in-charge 283 dismantling front bumper of tata xenon, tata yodha installing new bumperwith one coat of red oxide primer and two coat of paint as match with existing colour ofbody complete including marking of sign boards, arrow and numbering of vehicle complete all as specified and directed by engr-in-charge 284 supply only single hand grease gun with nozzle tube, hydraulic mouthpiece and reinforced hose 285 supply and fix diesel exhaust fuel def withurea 286 supply and fix hydraulic oil a68 for eicher aerial boom skylift ensol pro 2075 287 material and labour for repair of hydraulic pump including renewal of piston shaft,gasket, camshaft complete, cleaning of hydraulic cylinder in eicher aerial boom skylift ensolpro 2075. 288 material and labour for repair of hydraulic motor including rewinding if required, renewal ofbush shaft, bearing, rotor, of eicher aerial boom skylift ensol pro 2075 289 supply and fix for renewal of hydraulic insulated bucket of pvc material having high tensile strength complete with nut bolts in eicher aerial boom skylift ensol pro 2075
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results