BRR : 8439997
Tender Brief : Tender For Construction Of Cross Drainage (Pipe Syphon) At Km. 2.430 Of Salarpur Minor - Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth as per site requirement and with removal and proper disposal of surplus earth including all cost of material, labour, T&P etc. as per directed by engineer-in-charge for proper completion of work. 2 Supply and laying of Local Sand For easily early compaction including cost of all material labour T&P etc.as per directed by engineer in charge completefor proper co... Read More
Tender Value
₹
23,67,000
Contract Value
₹ 22,69,980
Saving / Difference
₹ 97,020
▲
Submission Date
27-10-2025
Contract Date
02-12-2025
Completion Date
120 days
Participated Bidder List
4 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 19,23,710 | L1 | |||
| 2 | cnet-technologies | Bid Analytics | 23,28,713.98 | L4 | |||
| 3 | cnet-technologies | Bid Analytics | 22,95,659.93 | L3 | |||
| 4 | cnet-technologies | Bid Analytics | 19,57,077 | L2 |
Work Detail
tender for construction of cross drainage (pipe syphon) at km. 2.430 of salarpur minor - earthwork in excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth as per site requirement and with removal and proper disposal of surplus earth including all cost of material, labour, t&p etc. as per directed by engineer-in-charge for proper completion of work. 2 supply and laying of local sand for easily early compaction including cost of all material labour t&p etc.as per directed by engineer in charge completefor proper completion of work. 3 cement concrete in (1:2:4) m10 mix with cement, coarse sand (f.m. not less than 2.00), stone grit (a-20) including cost of all material, labour, t&p, machanical mixing, curing etc.as per directed by engineer in charge completefor proper completion of work 4 reinforced cement concrete in (1:1.5:3) m20 mix with cement, coarse sand (f.m. not less than 2.00), stone grit (a-20) including cost of all material, labour, t&p, machanical mixing, curing etc.as per directed by engineer in charge completefor proper completion of work 5 providing & fixing of np-3 hume pipe of1200 mm dia including cost of all material, labour,carriage, loading, unloadingetc. complete as directed by engineer in charge 6 centering & shuttering fo r.c.c. work in defferent parts of structures all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, t&p. etc. 7 centering & shuttering fo c.c. work in defferent parts of structures all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, t&p. etc. 8 provide & fixing pvc water stop for expantion/ construction jointincluding all cost of labour, material and t&p etc. complete required for proper completion of work or as directed by engineer in charge 9 providing & fixing pvc pipe 75 mm dia for weep hole above fsl and zigzag @ 1.00 mtr distance centre to centre along both sides of the abutment in position including cost of all mterial, labour and t&p for proper complition of work. 10 providing & fixingsteel angle 50 x50 x 8 mm at vertical joints edge including all cost of labour, material and t&p etc. complete required for proper completion of work or as directed by engineer in charge 11 providing and fixing of nomitax board for expansion / construction joint i/c all cost of material labour t & p etc. for proper comp. of work. 12 supply and laying of shingle size 4.20 to 10 mm in inverted filterincluding cost of all material labour t&p etc.as per directed by engineer in charge completefor proper completion of work. 13 cutting, bending, binding & placing in position ofsteel reinforcement (above 10mm dia) with all wastage, carriage and including all labour material and t&p etc complete for proper completion materials, labour and t&p etc. 14 provide & laying boulder 20.00 to 40.00 kg.wt in launching apron with all lead and liftincluding cost all labour, t&p material etc complete for proper completion of work as per direction of engineer - in charge 15 earth work in filling in embankment in ordinary soil including ramming and dressing the surface to be required levels and slopes and also includingall lift and lead upto 600 m distance including cost of all labour t&p etc complete as directed by engineer-in- charge. 16 supplying & fixing b.m. plate 150 x 150 x 25 mm. size i/c all cost of material, labour t&p etc. for proper comp. of work. 17 supplying & fixing marble name & year plate 450 x 300 x 25 mm. size i/c all cost of material, labour t&p etc. for proper comp. of work.
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results