BRR : 8416497
Tender Brief : Tender For special repair of Ri Office Cum Residence Building At Dhodra- 1 Earth work in excavation of foundation in all kind of hard soil including dressing and levelling the bed and depositing the excavated materials away from work site etc.complete as per direction of the Engineer-in-charge. 2 Filling foundation and plinth with sand well watered and rammed including cost, conveyance of materials, labour T&P, royalty etc.complete as per direction of the Engineer in charge. 3 Cement concrete of proportion (1:3:6) in F & P using 40mm size HB/CB bhg metal of approved quality including cost, ... Read More
Tender Value
₹
4,97,509
Contract Value
₹ 4,22,932
Saving / Difference
₹ 74,577
▲
Submission Date
20-09-2025
Contract Date
11-12-2025
Completion Date
30 days
Participated Bidder List
51 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 2 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 3 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 4 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 5 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 6 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 7 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 8 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 9 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 10 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 11 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 12 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 13 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 14 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 15 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 16 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 17 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 18 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 19 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 20 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 21 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 22 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 23 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 24 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 25 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 26 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 27 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 28 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 29 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 30 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 31 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 32 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 33 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 34 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 35 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 36 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 37 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 38 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 39 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 40 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 41 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 42 | cnet-technologies | Bid Analytics | |||||
| 43 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 44 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 45 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 46 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 47 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 48 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 49 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 50 | cnet-technologies | Bid Analytics | 4,22,932 | L1 | |||
| 51 | cnet-technologies | Bid Analytics | 4,22,932 | L1 |
Work Detail
tender for special repair of ri office cum residence building at dhodra- 1 earth work in excavation of foundation in all kind of hard soil including dressing and levelling the bed and depositing the excavated materials away from work site etc.complete as per direction of the engineer-in-charge. 2 filling foundation and plinth with sand well watered and rammed including cost, conveyance of materials, labour t&p, royalty etc.complete as per direction of the engineer in charge. 3 cement concrete of proportion (1:3:6) in f & p using 40mm size hb/cb bhg metal of approved quality including cost, conveyance, taxes & royalty of all materials and labour with t&p etc. complete in all respect. 4 brickwork with flyash bricks in cement mortar (1:6) in foundation and plinth with watering and curing with cost conveyance royalty and taxes of all materials and labour etc. complete. 5 brickwork with flyash bricks in cement mortar (1:6) in superstructure including watering and curing withcost conveyance royalty and taxes of all materials and labour etc. complete. 6 rcc work of m-25 using 20mm and down graded chipes including hosting lowaring and laying watering, cutting, cost, conveyance, royaliti and taxes etc. complete as per diraction of eic. 7 a. column base 8 b. column/ plinth beam 9 providinghysd bar reinforcement using approved desing for rcc works includingcutting, bending, binding of m.s. rod including cost of all materials, labour t&p etc. complete as per direction of the engineer in charge. 10 painting two coats withapproved paint including a cost of primer over doors & windows etc. complete. 11 supplying all materials,labour t&p and fixing wash down water closet(e.w.c) of isi mark of with integral s or p trap to the floor with wooden plug and c.p screw including jointing the trap with soil waste pipe in cm(1:1)etc all complete as per specification and direction of the e.i.c. (parry ware) 12 a. 550mm x 400mm size whb 13 b. fixing of pedestal for basin 14 12mm thick c.p. in c.m.(1:6) over brick work finished smooth after racking out joints with cost, conveyance of materials labour, t&p required for the work including royalty etc.complete as per direction of the engineer in charge. 15 16mm thick c.p. in c.m.(1:6) over brick work finished smooth after racking out joints with cost, conveyance of materials labour, t&p required for the work including royalty etc.complete as per direction of the engineer-in-charge. 16 cement concrete (1:2:4) with 12 mmsize h.g. chips of approved quality from approved quarry in foundation including hoisting laying concrete including royalty, watering curing etc.complete. 17 distempering two coats overa coat of priming with anyapproved materials including cost conveyance, royality & taxes of all materials etc, complete 18 supplying and fixing ms doors and windows including cost conveyance taxes etc. complete. 19 finishing the wall surface with two coats of weather seal coat including cost, conveyance & any other taxes of materials & cost of all labour, t&p articles required for the work etc. all complete as per the direction of engineer-in-charge.
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000