BRR : 8404480
Click Here To View Tendering Authority. Aoc City/State :  palladam, Tamil Nadu
Tender Brief : Tender for Construction Of 1,00,000 Litre Capacity Sump At Pallipalayam Head Of Poomalur , Earthwork Excavation In Hard Stiff Clay,Black Cotton, Hard Red Earth, Shales,Murrams, Ordinary Gravel Stoney Earthmixed With 50% Fair Sized Boulders Etc., , Earthwork Excavation In Hard Stiff Clay,Black Cotton, Hard Red Earth, Shales,Murrams, Ordinary Gravel Stoney Earthmixed With 50% Fair Sized Boulders Etc., For Sdr , Earthwork Excavation In Hard Stiff Clay,Black Cotton, Hard Red Earth, Shales,Murrams, Ordinary Gravel Stoney Earthmixed With 50% Fair Sized Boulders Etc., For Mdr , Levelling Coarse In C... Read More
Tender Value
15,50,000
Contract Value
₹ 15,36,750
Saving / Difference
₹ 13,250 ▲
Submission Date
02-12-2025
Contract Date
10-12-2025
Completion Date
90 days
Participated Bidder List
2 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 15,36,462.98 L1
2 cnet-technologies Bid Analytics 15,48,981.2 L1
Work Detail
tender for construction of 1,00,000 litre capacity sump at pallipalayam head of poomalur , earthwork excavation in hard stiff clay,black cotton, hard red earth, shales,murrams, ordinary gravel stoney earthmixed with 50% fair sized boulders etc., , earthwork excavation in hard stiff clay,black cotton, hard red earth, shales,murrams, ordinary gravel stoney earthmixed with 50% fair sized boulders etc., for sdr , earthwork excavation in hard stiff clay,black cotton, hard red earth, shales,murrams, ordinary gravel stoney earthmixed with 50% fair sized boulders etc., for mdr , levelling coarse in cement concrete1:4:8 (one cement,four sand and eightaggregate) using 40mm hard broken stonefor foundation and leveling coarseincluding cost of all materials,mixing,placing, ramming, curing,finishing etc., complete and as directedby officers. , reinforced cement concrete1:1.5:3 using machine crushed 20mm isshbg stone for the following membersexcluding the cost of reinforcement andfabricating, centering, shuttering andstrutting charges but including the costof all materials, mixing, placing inposition, lifting, vibrating, finishing& curing, etc. complete.and as directedby officers. , reinforced cement concrete1:1.5:3 using machine crushed 20mm isshbg stone for the following membersexcluding the cost of reinforcement andfabricating, centering, shuttering andstrutting charges but including the costof all materials, mixing, placing inposition, lifting, vibrating, finishing& curing, etc. complete.and as directedby officers. , up to 1.50 m below gl , upto 4.50 m above gl from gl , supply and erection of steel centering,shuttering for soffits and sidesincluding necessary supports andstrutting for all reinforced cement concrete works using mssheets of suitable size of bg 10stiffened with ms angle of size 25 x 25x 3mm for boarding laid over silver oakjoists of size 10cm x 6.5cm space at10cm c/c and supported by casurino props10cm - 13cm spaced at 75cm c/c etc., , for 0.00 to 3.30 m (plane
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download d4d7f0c9-54be-42e4-beba-640cf6c16e57
Download boqcomparativechart
Download finsummary_748594
Download loapallipa
Download techsummary_748594
Download File Name File Description
Download BOQ_748594 Tender Documents
Download e7e1fca5-cc7a-4327-a8d1-6c20823bb5c4 Tender Documents
Download TBpkg Tender Documents
Download Tendernotice_1 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000