BRR : 8363063
Click Here To View Tendering Authority. Aoc City/State :  meerut, Uttar Pradesh
Tender Brief : Tender For Reconstruction Work Of Culvert At Km 2850 Of Rajwaha Right Salawa. - Dismantling brick work or cement concrete in cement mortar including stacking of material with in distance of 60 M as per direction of Engineer-in-charge 2 Dismantling of Reinforced cement concrete including stacking of materialwith in distance 60 M as per direction of Engineer-in-charge 3 Providing and filling EC bag with local earth, hand sewing with Suja and sutli, placing in position i/c all cost of material, labour and T&P etc complete. 4 Earth work in foundation in all types ofsoilincluding all liftand le... Read More
Tender Value
50,20,000
Contract Value
₹ 40,84,554.5
Saving / Difference
₹ 9,35,446 ▲
Submission Date
02-09-2025
Contract Date
02-12-2025
Completion Date
90 days
Participated Bidder List
5 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 45,54,649 L3
2 cnet-technologies Bid Analytics 40,84,554.5 L1
3 cnet-technologies Bid Analytics 45,71,610.56 L4
4 cnet-technologies Bid Analytics 49,60,026.35 L5
5 cnet-technologies Bid Analytics 42,45,743 L2
Work Detail
tender for reconstruction work of culvert at km 2850 of rajwaha right salawa. - dismantling brick work or cement concrete in cement mortar including stacking of material with in distance of 60 m as per direction of engineer-in-charge 2 dismantling of reinforced cement concrete including stacking of materialwith in distance 60 m as per direction of engineer-in-charge 3 providing and filling ec bag with local earth, hand sewing with suja and sutli, placing in position i/c all cost of material, labour and t&p etc complete. 4 earth work in foundation in all types ofsoilincluding all liftand lead alsoincluding back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the engineer-in-charge. 5 earth work in making diversion/bundha by transported earth with a lead of 200 m to 1.0 km i/c excation ,loading, unloading ,manual compaction dressing and all lifts complete. 6 laying plain cement concrete a 20 m-15 (1 cement : 2 coarse sand : 4 graded stone aggregate)in foundationincluding all cost fo material, labour, t&p etc required for proper completion of work. 7 laying r.c.c. a 20 m-20 (1 cement : 1.5 coarse sand : 3 graded stone aggregate)in foundationincluding all cost fo material, labour, t&p etc required for proper completion of work 8 laying r.c.c. a 20 m-25(1 cement : 1 coarse sand : 2 graded stone aggregate)i/c all cost of all material, labour and t&p etc required for proper completion of work. 9 providing and fixing steel reinforcement (t.m.t.fe-550) with cost of bending, binding,cutting& placing of reinforcement i/c costof binding wire, material,labour t&p etc required for proper completion of work 10 centering & shuttering for r.c.c. work i/call cost ofmaterial, labour & t.& p. etc. required for proper completion of work 11 laying brick on edge soling by using 15% old bricks with local sand filling in joints i/c cost oflabour,material andt&p etc required for proper complection of work. 12 providing and fixing pvc drainage pipe 75 mm diai/c cost of all material,labour and t&p etc complete 13 earth work in removing diversion / bundha by hydraulic excavator / jcb/ equivalent capacity with lift up to 1.50m and lead upto 90 m i/c cost of driver , assistant driver, pol, maintenance of machine, cont profit , t&p required for proper completion of work 14 finishing wall withweather coat paintof approved make and quality on new work with two coat to give an even shade i/c supply of allmaterials, labour and t&p etc complete. 15 painting letters including all cost of materials, labour,t&p etc. complete. 16 providing and fixing of (30x90 cm left/right object hazard) retro-reflectorised cautionary, mandatory and informatory sign i/c all cost of material, labour,t&p etc complete. 17 brick work in 1:4c:mfor laid flat bricks over 12 mm thick cement mortari/c all cost of material ,labour, t&p etc required for proper completion of work. 18 cement pointing struk deep on brick masonryin 1:2 c.m. ic all cost of material, labour and t&p etc required for proper completion of work. 19 laying brick ballast (from dismantaled brick work) in 1:3:6 ( 1cement:3 coarse sand: 6 brick ballast of size 20 mm to 40mm) 100 mm thick i/c all cost of material, labour, t&p etc required for proper completion of work. 20 providing and fixing marble white stone 25 mm thick of size 0.55m×0.35m with letter digging i/c cost of all material labour and t&p etc complete. 21 brick work with ist class (m-150) bricksin 1:4 cement mortar i/c allcost of material, labour and t&p etc complete.
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 59b2591d-cf07-4233-96ec-00f86a536900
Download AOC
Download boqcomparativechart
Download finance_1949179
Download finsummary_1949179
Download technical_1949179
Download techsummary_1949179
Download File Name File Description
Download Tendernotice_1 Tender Documents
Download 03ce611d-6658-473b-9db7-d143652ca558 Tender Documents
Download BOQ_1949179 Tender Documents
Download TenderDocument Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000