BRR : 8342462
Tender Brief : Annual Tender For Year 2025 2026 For Conservancy Vehicles Darjeeling Municipality , Engine Overhauling Sml Mazda (Bs4) , 1) Engine Opening And Fitting Labor Charges. , 2) Piston (Full Set) , 3) Piston Ring (Full Set) , 4) Piston Liner (Full Set) , 5) Main Bearing (Full Set) , 6) Connection Bearing (Full Set) , 7) Cam Shaft Bushs (Full Set) , 8) Crank Shaft , 9) Cam Shaft , 10) Engine Gasket (Full Set) , 11) Engine Hose Pipe (Full Set) , 12) Engine Fan Belt , 13) Engine Connecting Rod , 14) Engine Radiator , 15) Engine Silencer Pipe , 16) Silencer Box , 17) Engine Turbo Overhauling With New Pa... Read More
Tender Value
₹
Ref. Document
Contract Value
₹ 28,91,660.8
Submission Date
20-08-2025
Contract Date
16-10-2025
Completion Date
365 days
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 29,94,722 | L1 | |||
| 2 | cnet-technologies | Bid Analytics | 28,91,660.8 | L1 | |||
| 3 | cnet-technologies | Bid Analytics | 29,36,618.8 | L2 |
Work Detail
annual tender for year 2025 2026 for conservancy vehicles darjeeling municipality , engine overhauling sml mazda (bs4) , 1) engine opening and fitting labor charges. , 2) piston (full set) , 3) piston ring (full set) , 4) piston liner (full set) , 5) main bearing (full set) , 6) connection bearing (full set) , 7) cam shaft bushs (full set) , 8) crank shaft , 9) cam shaft , 10) engine gasket (full set) , 11) engine hose pipe (full set) , 12) engine fan belt , 13) engine connecting rod , 14) engine radiator , 15) engine silencer pipe , 16) silencer box , 17) engine turbo overhauling with new parts , 18) engine lead job , 19) engine oil pump , engine head repair sml mazda (bs4) , 1) velve (full set) , 2) gaid (full set) , 3) sheet (full set) , 4) head lead job , engine fuel pump and sml mazda (bs4) , 1) fuel pump and injection overhauling with new parts , gearbox repair sml mazda (bs4) , 1) gearbox opening and fitting labor charges , 2) top gear , 3) counter shaft , 4) main shaft , 5) 1st gear , 6) 2nd gear , 7) 3rd gear , 8) 4th gear , 9) 5th gear , 10) reverse gear , 11) gear synchronizer (full set) , 12) gearbox bearing , clutch repair sml mazda (bs4) , 1) clutch plate , 2) press plate , 3) release bearing , 4) clutch cylinder , 5) flywheel lead job , 6) clutch fork , differntal repair sml mazda (bs4) , 1) crown and pinion , 2) bearing , 3) oil seal , 4) axle , 5) cross bearing , 6) youk and teeth , hub repair sml mazda (bs4) , 1) hub , 2) hub bearing , 3) hub oil seal , 4) spendel , kinpin repair sml mazda (bs4) , 1) kinpin bush and shaft assembly , 2) kinpin bearing , 3) kinpin lead job , air brake repair sml mazda (bs4) , 1) brake lining (full set) , 2) brake servo assembly , 3) air pipe 16 feet , 4) air pipe 8 feet , 5) air pipe 4 feet , 6) dual brake valve assembly , 7) brake drum , 8) master cylinder assembly , 9) brake drum lead job , steering repair sml mazda (bs4) , 1) pour steering box assembly , 2)steering arm , 3)tie rod and assembly , 4)steering cross bearing , 5)steering oil pipe , spring repair sml mazda (bs4) , 1) main leaf , 2) 2nd leaf , 3) 3rd leaf , 4) spring bushs (full set) , 5) spring shackle pins assembly , 6) spring overhauling (labor charges) , wiring harness repair (sml mazda bs4) , 1) wiring harness check up (labor charges) , 2) wiring harness assembly , 3) ecu assembly , 4) tcu assembly , 5) fuel pump sensor , 6) injector sensor , 7) crank shaft sensor , 8) cam shaft sensor , 9) fly wheel sensor , 10) hsd oil filter sensor , 11) air cleaner filter sensor , 12) gearbox sensor , 13) engine accelerator sensor , self stater repair sml mazda (bs4) , 1) self stater overhauling (labor charges) , 2) armature , 3) carbon brush , 4) selenoid switch , 5) bushes , dynamo repair sml mazda (bs4) , 1) dynamo overhauling (labor charges) , 2) armature , 3) cut out , 4) bearing , 5) oil seal , battery sml mazda (bs4) , 1) battery 80 mpr , tyres and tubes sml mazda (bs4) , 1) tyres and tubes (size 7.50.16) , driver cabine repair sml mazda (bs4) , 1) driver cabin major repair (labour charges) , 2) seat repair , 3) front grill assembly , 4) front bumper , 5) looking mirror assembly , 6) front mirror , 7) head light assembly , 8) side light assembly , 9) door assembly , driver cabin minor repair sml mazda , 1) iron sheet , 2) wielding , 3) pohes wielding , 4) door repair , 5) labour charges , gearbox repair belero pickup (bs4) , 1) gearbox opening and fittinglabor charges , 2) top gear , 3) counter shaft , 4) main shaft , 5) 1st gear , 6) 2nd gear , 7) 3rd gear , 8) 4th gear , 9) 5th gear , 10) reverse gear , 11) gear synchronizer (full set) , 12) gearbox bearing , 13) gear oil seal , clutch repair belero pickup (bs4) , 1) clutch plate , 2) press plate , 3) release bearing , 4) clutch cylinder , 5) flywheel lead job , differntal rpeain (belero pickup bs4) , 1) crown and pinion , 2) crown bearing , 3) oil seal , 4) axle and bearing rear , 5) cross bearing , 6) youk and teeth , 7) front axle and cross bearing , brake repair belero pickup (bs4) , 1) master cylinder assembly , 2) servo assembly , 3) brake lining (full set) , 4) brake disc , 5) brake drum , 6) wheel cylinder front assembly , hub repair belero pickup (bs4) , 1) hub , 2) hub bearing , 3) hub oil seal , 4) wheel bearing spindle , kinpin repair belero pickup (bs4) , 1) kinpin hearing , 2) suspension ball joint , 3) power steering box assembly , 4) sleering arm , 5) tie rod end (full set) , spring repair belero pickup (bs4) , 1) spring opening and fitting labour charges , 2) main leaf , 3) 2nd leaf , 4) 3rd leaf , 5) center bolt and u bolt , 6) u bolt plate , 7) spring shackle pins assembly , wiring harness repair belero pickup (bs4) , 1) wiring harness cheekup (labour charge) , 2) wiring harness assembly with sensors , 3) ecu assembly , 4) tcu assembly , 5) head light assembly , 6) side light assembly , 7) battery (70 mpr) , self starter overhauling (labor charge) , 1) self starter overhauling (labor charge) , 2) armature , 3) carbon brush , 4) selenaid switch , dynamo repair belero pickup (bs4) , 1) dynamo overhauling (labor charge) , 2) armature , 3) catout , 4) bearing , 5) oil seal , types and tubes belero pickup (bs4) , 1) tire and tubes (size 700,15) , engine repair belero pickup (bs4) , 1) engine overhauling (labor charge) , 2) supply of new parts , 3) lead job , fuel pump and injection overhauling with new parts , brake repair tata yodha (bs6) , 1) master cylinder assembly , 2) servo assembly , 3) brake lining (full set) , 4) brake pads (full set) , 5) front brake disc , 6) rear brake drum , 7) front wheel cylinder assembly , 8) rear wheel cylinder assembly , spring repair tata yodha (bs6) , 1) main leaf , 2) 2nd leaf , 3) 3rd leaf , 4) center bolt , 5) u bolt , 6) u bolt plate , 7) spring shackle pin assembly , 8) spring over hauling (labor charge) , steering repair tata yodha (bs6) , 1) poure steering box assembly , 2) steering arm , 3) steering tie rod end (full set) , 4) cross bearing , 5) youk and teeth , 6) front axle cross bearing , 7) suspension boll joint assembly , tyres and tubes tata yodha (bs6) , 1) tyres and tubes (size 215, 75, r16) , wiring harness repair tata yodha (bs6) , 1) wiring harness cheek up and sensors labor charges , 2) tcu box assembly , 3) ecu box assembly , 4) head light assembly , 5) side light assembly , 6) battery (size 80d23rmf) , clutch repair tata yodha (bs6) , 1) clutch plate assembly , 2) pressure plate assembly , 3) release bearing , 4) clutch cylinder assembly , 5) fly wheel (lead job) , 6) gearbox opening and fitting (labor charge) , jcb excavators (bs4) , 1) hydraulic cylinder overhauling with new kits (labor charge) , 2) hydraulic hoses pipe 2 feet to 20 feet , 3) front and rear bucket teeth (full set) , 4) water separator filter assembly , 5) hydraulic oil filter assembly , 6) jcb complete servicingwith kits and parts (labour charge) , 7) front tyre and tube size 12,5180-18 (12 ply) , 8) rear tyre and tube size 16.9x28-12 (16 ply) , 9) battery (110 mpr) , mahindra cesspool truck (bs4) , 1) gearbox overhauling (labor charge) , 2) 1st gear , 3) 2nd gear , 4) 3rd gear , 5) 4th gear , 6) reverse gear , 7) top gear , 8) main shaft , 9) counter shaft , 10) gear synchronizer (full set) , 11) gearbox hearing , 12) gearbox oil seal , 13) gearbox cable assembly , clutch repair mahindra truck (bs4) , 1) clutch plate , 2) press plate , 3) release bearing , 4) clutch cylinder assembly , 5) fly wheel (lead job) , brake repair mahindra truck (bs4) , 1) master cylinder assembly , 2) servo assembly , 3) wheel cylinder assembly , 4) brake drum (lead job) , tires and tubes mahindra truck (bs4) , 1) tire and tube (size 7,50,16) , spring repair mahindra truck (bs4) , 1) spring overhauling with new parts , wiring harness repair mahindra truck , 1) wiring harness checkup with sensors , 2) self-starter overhauling with new parts , 3) dynamo overhauling with new parts , vacuum suction pump and tank repair mahindra cesspool truck (bs4) , 1) vacuum suction pump overhauling with new parts and lead job , 2) vacuum suction pump new assembly
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results