BRR : 8277012
Tender Brief : Bids Are Invited For Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; 1 Point 5 And 2 Ton Window Air Conditioners Operability Check On Monthly Basis Routine Service Once In Two Months Per Ac Attending Breakdown Or Deficie.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; 1 Point 5 By 2 Ton Split Air Conditioners Operability Check On Monthly Basis Routine Service Once In Two Months Per Ac Attending Breakdown Or Deficienci.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (V... Read More
Tender Value
₹
1,02,84,378
Contract Value
₹ 80,11,800
Saving / Difference
₹ 22,72,578
▲
Submission Date
29-08-2025
Contract Date
Ref. Document
Completion Date
Ref. Document
Participated Bidder List
9 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | |||||
| 3 | cnet-technologies | Bid Analytics | |||||
| 4 | cnet-technologies | Bid Analytics | |||||
| 5 | cnet-technologies | Bid Analytics | |||||
| 6 | cnet-technologies | Bid Analytics | |||||
| 7 | cnet-technologies | Bid Analytics | 92,45,901 | L3 | |||
| 8 | cnet-technologies | Bid Analytics | 82,04,100 | L2 | |||
| 9 | cnet-technologies | Bid Analytics | 80,11,800 | L1 |
Work Detail
bids are invited for repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 3 and 4; 1 point 5 and 2 ton window air conditioners operability check on monthly basis routine service once in two months per ac attending breakdown or deficie.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 3 and 4; 1 point 5 by 2 ton split air conditioners operability check on monthly basis routine service once in two months per ac attending breakdown or deficienci.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 3 and 4; 1x5 ton by 2x5 ton by 1x5 point 5 ton package air conditioners operability check on monthly basis routine service once in two months, attending breakdo.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 3 and 4; 40 and 80 and 150 litres water coolers monthly tank cleaning of water coolers routine service once in two months attending breakdown or deficiencies be.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 3 and 4; deep freezers and bottle cooler and vertical freezers operability check on monthly basis routine service once in two months attending breakdown or def.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 3 and 4; 165 and 230 and 300 litre refrigerators operability check on monthly basis routine service once in two months attending breakdown or deficiencies being .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 3 and 4; 11tr pacs in switchyard control room condition monitoring on daily basis, attending breakdown or deficiencies being reported as and when required mainte.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 3 and 4; aqua guard water filters operability check on monthly basis routine service once in two months attending breakdown or deficiencies being 1 reported as and.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 3 and 4; hydrogen coolers 1 point 5 ton capacity operability check on monthly basis routine service once in two months attending breakdown or deficiencies being .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 3 and 4; 3 point 0 ton cassettes by duct able model air conditioners operability check on monthly basis routine service once in two months per ac attending bre.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 3 and 4; desert coolers breakdown maintenance as and when required and maintenance of desert coolers once in a year including painting of desert cooler body ins.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 3 and 4; cellulose pad desert coolers breakdown maintenance as and when required and maintenance of cellulose pad desert coolers once in a year including painti.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 3 and 4; replacement of cellulose pad replacement of pad for cellulose pad desert coolers detailed scope of work is mentioned in tender document and boq attached.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 3 and 4; replacement of canvas joint in cellulose pad desert coolers replacement of canvas joint in cellulose pad desert coolers detailed scope of work is menti.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 3 and 4; replacement of high quality copper tubing 1 by 4 and 1 by 2 and 3 by 4 and 5 by 8 in 1 point 5 and 2 point 0 air conditioners as and when required dur.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 3 and 4; replacement and supply of complete cellulose pad desert cooler body size of 1169 mm h x 915 mm w x 940 mm l any deviation may be plus minus 20 mm and.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 3 and 4; replacement and supply of desert cooler complete body size 902 mm h x 673 mm w x 673 mm l any deviation may be plus minus 20 mm 20 gauge body mate.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 3 and 4; supply and replacement of compressor for 3 point 5 ton cassettes air conditioner detailed scope of work is mentioned in tender document and boq attached.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 3 and 4; supply and replacement of compressor for 5 point 0 ton pac air conditioner detailed scope of work is mentioned in tender document and boq attached total.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 3 and 4; 1 point 5 and 2 ton window air conditioners removal and shifting of window type air conditioners from one location to other at raps site its installatio.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 3 and 4; 1 point 5 and 2 ton split air conditions removal and shifting of split air conditioners from one location to others at raps site including installation.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 3 and 4; 40 and 80 and 150 litres water coolers removal and shifting of water coolers from one location to other and their installation and commissioning and te.. , repair, maintenance, and installation of plant/ 2 total quantity : replacement of cellulose pad replacement of pad for cellulose pad desert coolers detailed scope of work is mentioned in tender document and boq attached total quantity 1 is equal to 25 for two years total quantity :
View Original Notice/Document
Result Documents
Tender Documents
| Download | File Name | File Description |
|---|---|---|
| Download | 7f6ee351-c38e-429a-8056-9832061d751a |
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results