BRR : 8222106
Click Here To View Tendering Authority. Aoc City/State :  kalan, Haryana
Tender Brief : Annual maintenance Work for Water Supply,`Operation and maintenance A /mtc scheme for 8 Month i.e. Pumping Machinery, Leakages of Pipe line and consumables etc. in village Satrod Kalan and all other works contingent thereto.-- 1 All Pumping set install at water works, Boosting station, Including of Pumps and Motor of various capacity including all electric fitting , Panel Board, starter,Cable, Volt Meter, Ampmeter etc. inside/outside Campus complete in all respects (August 2025 to March 2026 = Total 8 Months) 2 Comprehensive Maintenance and repair of existing distribution as well as head w... Read More
Tender Value
4,44,208
Contract Value
₹ 3,55,200
Saving / Difference
₹ 89,008 ▲
Submission Date
08-09-2025
Contract Date
07-11-2025
Completion Date
250 days
Participated Bidder List
3 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 3,55,200 L1
2 cnet-technologies Bid Analytics 5,19,720 L2
3 cnet-technologies Bid Analytics 5,68,000 L3
Work Detail
annual maintenance work for water supply,`operation and maintenance a /mtc scheme for 8 month i.e. pumping machinery, leakages of pipe line and consumables etc. in village satrod kalan and all other works contingent thereto.-- 1 all pumping set install at water works, boosting station, including of pumps and motor of various capacity including all electric fitting , panel board, starter,cable, volt meter, ampmeter etc. inside/outside campus complete in all respects (august 2025 to march 2026 = total 8 months) 2 comprehensive maintenance and repair of existing distribution as well as head work pipelines of all types (di/ci/ac/pvc) removal and relaying ipb, including ipb block if required, demolising c/c by mechnical /manualand all sizes at various depths, including new sluice valves, new non-return valves, leakages and repair of illegal/not functional water supply connections. work includes excavation on any surface, bailing out, refilling i.e. soil etc.material and labour cost, machine/equipment hire including cost and repair/replacement of newsluice valves components of all sizes (m.s. spindle, g.m. chuck nut and ci special, nut bolts, rubber jain, glain dori, grease, etc.). includes opening/fitting, carriage charges from site toworkshop and back at site and all repair related works as per engineer-in-charge`s direction, complete in all respects. (august 2025 to march 2026 = total 8 months) 3 provision for consumeables items i.e. bush , cotton, glain dori, grease, lubricant oil, mobil oil, nut and bolt, rubber sheet, transformer oil etc.(august 2025 to march 2026 = total 8 months)
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 60bb5573-1cb3-4e3b-8be4-4c0e27d703e1
Download boqcomparativechart
Download finance_546634
Download finsummary_546634
Download LOA
Download technical_546634
Download techsummary_546634
Download File Name File Description
Download c018b87e-4640-4401-a9b3-8e423c9f2e4c Tender Documents
Download BOQ_546634 Tender Documents
Download PB4BV8Z128054 Tender Documents
Download Tendernotice_1 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000
Similar Tenders Results
TenderDetail
Loading tenders