BRR : 8214580
Tender Brief : Tender For Annual Overhauling Of Gt-3 (250Mva, 15.75/420Kv) During Overhauling Of Unit No. 3 - Overhauling Of Gt-3 (250Mva, 15.75/420Kv) During Overhauling Of Unit No. 3 Of 3X210 Mw ‘A’Tps, Anpara (Sonebhadra) - Transportation of empty oil storage tanks (25 KL) on the site of GT-3 from site of GT-1. 2 Dismantling and assembly of HV/LV links, Jumpers and bellows etc. 3 Dismantling and assembly LV and Neutral Bushing, LV Turret, etc.( proper replacement of gaskets and O-rings) and Replacement ofWTI, OTI, Buccholz Relay ,RPRR , etc. along with replacement of all three phases bushing off seal ... Read More
Tender Value
₹
Ref. Document
Contract Value
₹ 9,01,794
Submission Date
08-08-2025
Contract Date
06-11-2025
Completion Date
365 days
Participated Bidder List
4 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 10,94,500 | L3 | |||
| 2 | cnet-technologies | Bid Analytics | |||||
| 3 | cnet-technologies | Bid Analytics | 9,01,794 | L1 | |||
| 4 | cnet-technologies | Bid Analytics | 10,91,900 | L2 |
Work Detail
tender for annual overhauling of gt-3 (250mva, 15.75/420kv) during overhauling of unit no. 3 - overhauling of gt-3 (250mva, 15.75/420kv) during overhauling of unit no. 3 of 3x210 mw ‘a’tps, anpara (sonebhadra) - transportation of empty oil storage tanks (25 kl) on the site of gt-3 from site of gt-1. 2 dismantling and assembly of hv/lv links, jumpers and bellows etc. 3 dismantling and assembly lv and neutral bushing, lv turret, etc.( proper replacement of gaskets and o-rings) and replacement ofwti, oti, buccholz relay ,rprr , etc. along with replacement of all three phases bushing off seal and rubber bus duct bellows. 4 replacement of gaskets of oil header pipe lines, all inspection cover of gt-3 top cover &re-visioning ofboth butterfly valves of 250 mm. nb. 5 repairing of lv wall shunt of all three phases of gt-3. 6 repairing of hv wall shunt of all three phases of gt-3. 7 dry out process of gt-3 until dew point of (-) 20°c is achieved. 8 overhauling of cooling fans & oil circulating pumps of gt-3 as per scope of work. 9 overhauling of radiators (32 nos.) as per scope of work. 10 overhauling/replacement/servicing of butterfly valves (64no.) of radiator (100 mm nb). 11 draining & refilling of transformer oil of gt-3 after its centrifuging. 12 painting of gt-3 of unit no. 3, surface area= 2750 sq. mtr. (approx.).
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000