BRR : 8132488
Tender Brief : Tender for Supply of equipment / material, design, erection, testing, commissioning for -i) Estimate for augmentation of existing 11/0.4KV, 25 KVA to63 KVAS/stnRah in (E) Section Daulatpur under Electrical Sub-Division HPSEBL, Ranital.(T. S. No. 050/2024-25, S.A. 248511/-) (W.B.S.- 32100427-001-KGR-DTR-017) ii) Estimate for augmentation of existing 11/0.4KV, 25 KVA to63 KVAS/stnMajakra in (E) Section Daulatpur under Electrical Sub-Division HPSEBL, Ranital. (T. S. No. 051/2024-25, S.A. 248511/-) (W.B.S.- 32100427-001-KGR-DTR-004)iii) Estimate for augmentation of existing 11/0.4KV, 25 KVA to63 ... Read More
Tender Value
₹
2,34,022
Contract Value
₹ 2,33,675
Saving / Difference
₹ 347
▲
Submission Date
30-07-2025
Contract Date
18-10-2025
Completion Date
90 days
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 2,62,104.64 | L2 | |||
| 2 | cnet-technologies | Bid Analytics | 2,69,125.3 | L3 | |||
| 3 | cnet-technologies | Bid Analytics | 2,33,675 | L1 |
Work Detail
tender for supply of equipment / material, design, erection, testing, commissioning for -i) estimate for augmentation of existing 11/0.4kv, 25 kva to63 kvas/stnrah in (e) section daulatpur under electrical sub-division hpsebl, ranital.(t. s. no. 050/2024-25, s.a. 248511/-) (w.b.s.- 32100427-001-kgr-dtr-017) ii) estimate for augmentation of existing 11/0.4kv, 25 kva to63 kvas/stnmajakra in (e) section daulatpur under electrical sub-division hpsebl, ranital. (t. s. no. 051/2024-25, s.a. 248511/-) (w.b.s.- 32100427-001-kgr-dtr-004)iii) estimate for augmentation of existing 11/0.4kv, 25 kva to63 kvas/stnbalugloa in (e) section bane di hatti under electrical sub-division hpsebl, ranital. (t. s. no. 052/2024-25, s.a. 248511/-) (w.b.s.- 32100427-001-kgr-dtr-005)-augmentation of 25 to 63kva s/stnrah 2 prov.nuts and bolts of various sizes (galvanised / coated) [preferably 16 mm φ or more(with flat and spring washers)] 3 prov. aluminium thimble 4 prov.lt cable (3.5 core) 70 mm² 5 prov energy meter(3φ,4-wire)dlms compliant200/5amp 6 prov.pipe earthing set 7 loading of 63kva transformer from at store in vehicle & unloading at site and loading to the s/stn structure 8 dismantlement of existing 25kva transformer alongwith allied accessories complete in all respect. 9 un-loading of 25kva transformer (dismantled) from s/stn structure & loading in vehicle and unloading at store . 10 erection of 63kva transformer alongwith ,lt box, mccb switch, cable service, cable and energy meter complete in all respect. 11 mannual carriage of 25kvatransformers alongwith allied accessories complete in all respect with average lead 0.200km from road side to site of work (average lead x rate). 12 mannual carriage of63kva transformers alongwith allied accessories complete in all respect with average lead 0.200km from road side to site of work (average lead x rate). 13 erection of earthing digging of pit , fixing of earth rod, clamp,earth wire and connecting to the structure, providing charcoland salt for earthing,filling of the pitwith material,providing earthing to the transformer,lt box, meter boxetc, providingbarbed wire and painting,providingearthing conn.to g.o. switch,lightning arrestor etc& poles. 14 augmentation of 25 to 63kva s/stnmajakra 15 prov.nuts and bolts of various sizes (galvanised / coated) [preferably 16 mm φ or more(with flat and spring washers)] 16 prov. aluminium thimble 17 prov.lt cable (3.5 core) 70 mm² 18 prov energy meter(3φ,4-wire)dlms compliant200/5amp 19 prov.pipe earthing set 20 loading of 63kva transformer from at store in vehicle & unloading at site and loading to the s/stn structure 21 dismantlement of existing 25kva transformer alongwith allied accessories complete in all respect. 22 un-loading of 25kva transformer (dismantled) from s/stn structure & loading in vehicle and unloading at store . 23 erection of 63kva transformer alongwith ,lt box, mccb switch, cable service, cable and energy meter complete in all respect. 24 mannual carriage of 25kvatransformers alongwith allied accessories complete in all respect with average lead 0.200km from road side to site of work (average lead x rate). 25 mannual carriage of63kva transformers alongwith allied accessories complete in all respect with average lead 0.200km from road side to site of work (average lead x rate). 26 erection of earthing digging of pit , fixing of earth rod, clamp,earth wire and connecting to the structure, providing charcoland salt for earthing,filling of the pitwith material,providing earthing to the transformer,lt box, meter boxetc, providingbarbed wire and painting,providingearthing conn.to g.o. switch,lightning arrestor etc& poles. 27 augmentation of 25 to 63kva s/stn balugloa 28 prov.nuts and bolts of various sizes (galvanised / coated) [preferably 16 mm φ or more(with flat and spring washers)] 29 prov. aluminium thimble 30 prov.lt cable (3.5 core) 70 mm² 31 prov energy meter(3φ,4-wire)dlms compliant200/5amp 32 prov.pipe earthing set 33 loading of 63kva transformer from at store in vehicle & unloading at site and loading to the s/stn structure 34 dismantlement of existing 25kva transformer alongwith allied accessories complete in all respect. 35 un-loading of 25kva transformer (dismantled) from s/stn structure & loading in vehicle and unloading at store . 36 erection of 63kva transformer alongwith ,lt box, mccb switch, cable service, cable and energy meter complete in all respect. 37 mannual carriage of 25kvatransformers alongwith allied accessories complete in all respect with average lead 0.200km from road side to site of work (average lead x rate). 38 mannual carriage of63kva transformers alongwith allied accessories complete in all respect with average lead 0.200km from road side to site of work (average lead x rate). 39 erection of earthing digging of pit , fixing of earth rod, clamp,earth wire and connecting to the structure, providing charcoland salt for earthing,filling of the pitwith material,providing earthing to the transformer,lt box, meter boxetc, providingbarbed wire and painting,providingearthing conn.to g.o. switch,lightning arrestor etc& poles.
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results