BRR : 8039976
Tender Brief : Tender For Breakdown And Major Repair, Replacement Work Of Mansarover Ghat Sps At Varanasi. - Breakdown & major repair/ replacement work of Mansarover Ghat SPS, at Varanasi. 2 Repairing of Pump No. 1,2 3, 4 & 5 works 3 Carting of PumpNo. 1, 2, 3, 4 & 5 fromMansarovarGhat SPS to workshop with loading and unloading complete. 4 Repairing of Pump No. 1, 3 & 5 (2600 LPM 21 mtr. head)Kirloskar Make 5 Dismantling of pump and cleaning of all parts etc. complete. 6 Metalizing turning and polishing of pump shaft. 7 Supply and fitting of S.S. gland sleeve as per old sample. 8 Supply and fitting o... Read More
Tender Value
₹
Ref. Document
Contract Value
₹ 19,74,038.5
Submission Date
23-09-2025
Contract Date
30-09-2025
Completion Date
365 days
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 19,74,038.5 | L1 | |||
| 2 | cnet-technologies | Bid Analytics | 19,94,079.5 | L3 | |||
| 3 | cnet-technologies | Bid Analytics | 19,89,069.25 | L2 |
Work Detail
tender for breakdown and major repair, replacement work of mansarover ghat sps at varanasi. - breakdown & major repair/ replacement work of mansarover ghat sps, at varanasi. 2 repairing of pump no. 1,2 3, 4 & 5 works 3 carting of pumpno. 1, 2, 3, 4 & 5 frommansarovarghat sps to workshop with loading and unloading complete. 4 repairing of pump no. 1, 3 & 5 (2600 lpm 21 mtr. head)kirloskar make 5 dismantling of pump and cleaning of all parts etc. complete. 6 metalizing turning and polishing of pump shaft. 7 supply and fitting of s.s. gland sleeve as per old sample. 8 supply and fitting of bearing no-6411 reputed make- 2nos. 9 supply and fitting of oil seal 78x50x12, 30x55x12. 10 supply of rubber bush l-225-2nos. 11 assembling of pump all parts including filling of gland dori, packing, nut-bolt, stud nut (16mm), greasing etc complete. 12 carting of pump from workshop to mansarover ghat sps including loading unloading. 13 repairing of pump no. 2 (1300 lpm, 15 meter head) 14 dismantling of pump and cleaning of all parts etc. complete. 15 supply and fitting of gland sleeve of ss as per old sample. 16 metalizing, turning and polishing of pump shaft. 17 s/f of impeller neck ring of gun metal. 18 supply and fitting of housing neck ring of ci. 19 s/f of bearing no. 6309 and 6310. 20 s/f of oil seal no. 60x45x10 and 60x40x10 21 assembling of pump all parts including filling of gland dori, packing, nut-bolt, stud nut, greasing etc complete. 22 carting of pump fromworkshop to mansarovar ghat sps with loading, unloading, stacking at site. 23 repairing of pump no. 4 (1300 lpm, 15mtr. head) 24 dismantling of pump and cleaning of all parts etc. complete. 25 supply and fitting of impeller sleeve of s.s. as per old sample. 26 supply and fitting of shaft sleeve of ss as per old sample. 27 supply and fitting of impeller neck ring of gun metal. 28 s/f of bearing no. 6309 and 6308. 29 s/f of oil seal no. 60x40x10 30 repairing of mechanical seal 31 s/f of stud with nut as per old sample-4nos.. 32 supply and fitting ci neckring in pump housing as per required size. 33 assembling of pump including cost of requiredmobil oil and packing etc. 34 carting of pumpno. 4 from workshop to mansarover ghat sps. 35 lowering ofpumpsin pump well and installed on foundation. lowering of motor and making electric connection & setting of pump-motor alignment including all labour charges t&p etc. complete. work with all respect. 36 repairing of25 hp cgl make motor no. 1,3 & 5 37 dismantling of 25 hp cgl make motor from pump well at mansarover ghat sps, lifting upto the surface and stacking at suitable place in pump house. 38 shifting of motor from pump house to road side loading on trolley, carting from mansarover ghat sps to workshop and unloading at workshop. 39 dismantling of all parts of motor at workshop, cutting and snatching of burnt copper wire, cleaning of slots, rewinding of motor with suitable size of supper enamel copper wire varnishing, heating and drying after rewinding of motor with all material labour and t&p. 40 supply and fitting of new bearing size 6212 and 6312- 2 set skf/fag make. 41 s/f of terminal plate etc. complete. 42 assembling of all parts of motor at workshop. 43 carting of 25 hp motor from workshop to mansarover ghat sps unloading and shifting of motor at site. 44 lowering of motor in pump well at mansarover ghat sps, fitting properly onpump, makingelectrical connection and testing of motor etc. completewith all respect. 45 repairing of10 hpmotor no. 2 & 4 46 dismantling of 10 hp motor from pump foundation and shifting upto floor and loading on hand trolley and carting upto workshop unloading etc. complete. 47 opening of motor at workshop and snatching of burnt stator winding and cleaning properly. rewinding of motor starter by varnished , heating, varnishing etc. complete. 48 s/f of all bearing size 6409 and 6309 etc. complete reputed make. 49 s/f of terminal plate etc. complete. 50 after repairing assembling of all parts at workshop. 51 carting of 10 hp motor from workshop to mansarover ghat sps unloading and shifting of motor at site. 52 lowering of motor pump well, making electric connection, testing on load at site. 53 servicing & repairing of 70 kva dg set kirloskar make engine- 54 cleaning of silencer of 70 kva dg set with removal of old asbestos rope. 55 supply & fitting of asbestos rope on silencer. 56 finishing of covered silencer by coating soap stone powder with supply of material & labour charges etc. 57 draining out of hsd oil from service tank and lube oil form engine sump and cleaning it properly. 58 filling of new mobil oil, in engine sump of required level, supply and fitting of diesel filter, mobil filter required ring, packing etc. complete. 59 fitment of fuel line including fuel pipe, banjo, copper washer etc. 60 supply and fitting of air filter. 61 cleaning of radiator, pressure testing including fitment of hose clips, filling of coolant. 62 cleaning of all parts & testing of engine on load at site with all labour t&p etc. complete. 63 painting work- 64 1. motors 10 hp- 2 nos. & 25 hp - 3nos.2. pumps 1300 lpm- 2 nos. & 2600 lpm-3nos.3. jumbo dewatering set– 1no.4. change over – 1no.5. starter panels – 5nos., apfc panel- 1no., lt panel- 1no. & plc panel- 1no.6. all supporting structure of panels. 7. complete header line s.v/n.r.v. and all fitting in pump well.8. railing, stair/ platform in pump well, campus railing andsump well complete.9. 70 kva dg set with alternator oil tank etc. complete.10. screen fitted on ground level.11. dewatering control panel.12. air blower set- 2nos. 13. ms meter box and safety box.14. canopy of 70 kva dg set-1no 65 painting of all above bytwo coat enamel paint with smoke grey/ green, black etc.enamel paint as required with all materials, labours and t&p compete required for completion of works. 66 making name plate ( radium stickers) of all equipment and fitting properly at site. 67 sitc of electric resistance sheet 10mm thikness size 1mtr.x 2mtr. forlt, plc panel, ht panel, change over, dg set, apfc panel, apru panel etc. complete. 68 supply of fibrer chair - 6 nos., fiber table - 1no. , empty new drum for diesel carting- 2nos.,tarch - 1no. table fan- 1no. stand fan, 2000 watt room heater. 69 sitc of flood light - 200 watt-5 no. in pump well, sump well & special sump well. 70 sitc of flood light - 100 watt-6 no. in pump well, sump well & special sump well, control panel, lt panel, dg room. campus 71 sitc of flood light - 50 watt-3 no. inlt panel, dg room. ht panel room, tf yard etc. 72 sitc of tube light- 22 watt-10 no. inlt panel, dg room. ht panel room, pump house, office, store, control panel room etc. 73 sitc of led bulb with cover injector- 9 watt-12 no. inbridge withbathroom, etc. 74 sitc ofexhaust fan - 2 nos inlt panel room, office, bathroom 75 sitc ofselling fan - 2 nos inlt panel room, office, store room, 76 sitc ofledjhalar on festival of dev dipawali including all cost of material and labour charge etc. complete. 77 repairing/replecmentof 12 volt self for 70 kva dg set- 1no. 78 delegation and other officials site visit arrangement throughout the year as per requirement and direction of engineer in charge.( 1year) 79 sitc 150 ah battery withinvertor2 no. for plc & dg set including all cost of material and labour charge etc. complete. 80 miscellaneous work (like as supply of broom-12, cloth-10 kg, damaged parts, harpic, acid, dettol shop, mustard oildiesel carting- charge, electric fault, with greasing, gland dori of pump, campus and transformer sidegrass cutting(1 year) etc. on periodic basis as per requirement. 81 comprehensive maintenance, repairing of 25 hp star delta starter- 3no. 10 hp ats starter- 2no. and replacement of burnt motor connection plate, lug including all cost of material labour charge etc. - 1year 82 comprehensive maintenance of apfc panel- 30 kvar with its calibration certificate including all cost of material and labour charges t&p. 1 year 83 comprehensive maintenance oflt panel (main sfu-250 amp. 1 nos., sfu-150 amp. 2 nos.,- 100 amp.- 5 nos., and 63 amp. 3 nos., etc) & amf panel, replacing of burnt or non-working items, including all cost of material and labour charges. 1 year 84 repairing/replacement of existing ip cameras along with its 12 month recharge. etc. complete subjected to verification of eic. 85 repairing of suction sluice valve/reflex valves with pipe fitting 200/250/300/350 mm - 4nos.of chockages from nrv, pumps and dewatering,(1 year) whenever necessary as per requirement and direction of eic. 86 repairing of bypass gate actuator, gear box and filling of fresh grease with comprehensive maintenance of by pass gate including all cost of material, labour charge etc. complete. 87 repairing of dewatering pump - 5 hp including all cost of material, labour charges etc. complete. 88 supply of tools set, tools: this shall be a set of tools comprising of following items: (i) d-spanner set (6-17 mm)1 set.(ii) ring spanner(6-17mm) 1 set(iii) insulated cut plier 1 no. (iv)pipe wrench 18 1 no.(v) screw driver 12”1 no. (vi)hammer (500gm) with handle 1 no. (vii) screw driver 8” 1 no. (viii) tool box suitable size 1 no. (ix) tonge tester (ac/dc- 500a) 1 no. (x) electric safety hand gloves 1 set(xi) multimeter (ac/dc- 500a)1 no. (xii) megger (ac/dc- 500v) 1 no. (xiii) crimping tools 1 no. 89 sitc of 5 ton chain pulley block, 15mtr. chain reputed make etc. complete. 90 calebriation of flow meter 300mm dia (burahan make) with totalizer in plc biases including all cost of material, labour charges etc. complete. 91 repairing/preventive maintenance of earthing by gi strips (size 50x6mm) of 2 no. & checking and testing earth pit all electrical equipment-pumping plant. of gi strips as per side condition. 92 refiling of abc type/co2 fire extinguisher- 6 nos. direction of eic at trilochan ghat sps, varanasi 93 miscellaneous and emergency work any damaged e&m equipment, delivery pipe line, common hedder, pump & motor, dg set etc. complete a( one year) as per requirement and direction of eic.
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000