BRR : 8034549
Click Here To View Tendering Authority. Aoc City/State :  madayi, Kerala
Tender Brief : Tender For Annual Plan-Madayi Gp Pr.No. 82/25 Vcb Maintenance -In Madayi Gp (Dev. Fund 1400000, Own Fund 400000)-General Civil Work - Vellachaal Theke Mnaja 2 OD548700/2024-2025:RING BUND Type II Putting up ring bund with earth filled gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work. etc. complete. 3 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of st... Read More
Tender Value
15,25,307
Contract Value
₹ 15,25,306.53
Saving / Difference
₹ 0 ▲
Submission Date
16-07-2025
Contract Date
29-08-2025
Completion Date
180 days
Participated Bidder List
2 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 16,01,565.52 L2
2 cnet-technologies Bid Analytics 15,25,306.53 L1
Work Detail
tender for annual plan-madayi gp pr.no. 82/25 vcb maintenance -in madayi gp (dev. fund 1400000, own fund 400000)-general civil work - vellachaal theke mnaja 2 od548700/2024-2025:ring bund type ii putting up ring bund with earth filled gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work. etc. complete. 3 15.3:demolishing r.c.c. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of engineer -in-charge. 4 50.2.3.1:pumping or bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete 5 4.1.6:providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) 6 5.1.2:providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size 7 5.22.6:steel reinforcement for r.c.c work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelthermo - mechanically treated bars of grade fe-500d or more 8 5.9.3:centering and shuttering including strutting, etc. and removal of form for:suspended floors, roofs, landings, balconies and access platform 9 5.9.5:centering and shuttering including strutting, etc. and removal of form for:lintels, beams, plinth beams, girders bressumers and cantilevers 10 5.9.16.1:centering and shuttering including strutting, etc. and removal of form for:edges of slabs and breaks in floors and wallsunder 20 cm wide 11 50.2.25.1:filling with contractors own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site engineer-in-charge 12 13.1.2:12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand). 13 od41137/2025-2026:shutter for check dams - supplying and providing vengai wood shutter planks 5 cm thick including cost of materials and labour charges etc. ( 50.9.14.3 modified ) 14 13.59:coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively. 15 layinchira manja 16 od116552/2025-2026:ring bund type ii putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. 17 od42003/2025-2026:shutter for check dams - supplying and providing vengai wood shutter planks 5 cm thick including cost of materials and labour charges etc. ( 50.9.14.3 modified ) 18 50.2.3.1:pumping or bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete 19 50.2.25.1:filling with contractors own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site engineer-in-charge 20 13.59:coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively. 21 moolakeel manja 22 od42004/2025-2026:shutter for check dams - supplying and providing vengai wood shutter planks 5 cm thick including cost of materials and labour charges etc. ( 50.9.14.3 modified ) 23 od116572/2025-2026:ring bund type ii putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. 24 50.2.25.1:filling with contractors own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site engineer-in-charge 25 50.2.3.1:pumping or bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete 26 13.59:coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively. 27 chootad manja 28 od42005/2025-2026:shutter for check dams - supplying and providing vengai wood shutter planks 5 cm thick including cost of materials and labour charges etc. ( 50.9.14.3 modified ) 29 50.2.25.1:filling with contractors own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site engineer-in-charge 30 13.59:coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively. 31 chootad edamanja 32 50.2.25.1:filling with contractors own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site engineer-in-charge 33 od42006/2025-2026:shutter for check dams - supplying and providing vengai wood shutter planks 5 cm thick including cost of materials and labour charges etc. ( 50.9.14.3 modified ) 34 13.59:coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively. 35 50.2.3.1:pumping or bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete 36 kakkithodu manja 37 od42007/2025-2026:shutter for check dams - supplying and providing vengai wood shutter planks 5 cm thick including cost of materials and labour charges etc. ( 50.9.14.3 modified ) 38 50.2.25.1:filling with contractors own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site engineer-in-charge 39 13.59:coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively. 40 50.2.3.1:pumping or bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete 41 moolakeel idamanja 42 od42008/2025-2026:shutter for check dams - supplying and providing vengai wood shutter planks 5 cm thick including cost of materials and labour charges etc. ( 50.9.14.3 modified ) 43 od116632/2025-2026:ring bund type ii putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. 44 50.2.25.1:filling with contractors own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site engineer-in-charge 45 13.59:coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively. 46 50.2.3.1:pumping or bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete 47 5.1.2:providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size 48 4.1.6:providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) 49 5.22.6:steel reinforcement for r.c.c work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelthermo - mechanically treated bars of grade fe-500d or more 50 5.9.16.1:centering and shuttering including strutting, etc. and removal of form for:edges of slabs and breaks in floors and wallsunder 20 cm wide 51 5.9.3:centering and shuttering including strutting, etc. and removal of form for:suspended floors, roofs, landings, balconies and access platform 52 aanappally thodu manja 53 od44144/2025-2026:shutter for check dams - supplying and providing vengai wood shutter planks 5 cm thick including cost of materials and labour charges etc. ( 50.9.14.3 modified ) 54 od116649/2025-2026:ring bund type ii putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. 55 13.59:coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively. 56 50.2.25.1:filling with contractors own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site engineer-in-charge 57 4.1.3:providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-iii) : 4 graded stone aggregate 20 mm nominal size) 58 4.3.1:centering and shuttering including strutting, propping etc. and removal of form work for:foundations, footings, bases for columns 59 50.2.3.1:pumping or bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 0d7772a7-bc10-4645-96c7-c8788f78775c
Download 82VCB
Download boqcomparativechart
Download finance_1266116
Download finsummary_1266116
Download techsummary_1266116
Download File Name File Description
Download 8d9b212d-6df8-4eba-8338-abe15ec3c090 Tender Documents
Download AFFIDAVIT Tender Documents
Download BOQ_1266116 Tender Documents
Download PRELIMINARY Tender Documents
Download SBD Tender Documents
Download Tendernotice_1 Tender Documents
Download Tendernotice_2 Tender Documents
Download Tendernotice_3 Tender Documents
Download FORMOFTENDER Tender Documents
Download NIT Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000