BRR : 7922916
Click Here To View Tendering Authority. Aoc City/State :  lucknow, Uttar Pradesh
Tender Brief : Tender For Construction Work Of New Culvert At Km 1.545 Of Amausi Rajbaha. - Earth work in Making Road DiversionBy Power transport with lead upto 5 Km including Excavation ,loading, unloading,Royalty ,dressing mechanicalcompletion to achive 98% density. (For Upstream and downstream VRB) 2 Earth work inmaking bund & strengthinig Of Bank with partial dressing lead upto 30 meters, lift upto 1.5 meters excluding Mechanical compaction but inclusive of manual compaction and dressing to profiles.(For Upstream and downstream VRB) 3 Dry brick on edge pitching including preparation of sub grade and f... Read More
Tender Value
79,93,000
Contract Value
₹ 57,37,619.6
Saving / Difference
₹ 22,55,380 ▲
Submission Date
11-08-2025
Contract Date
06-09-2025
Completion Date
180 days
Participated Bidder List
9 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 66,24,700.11 L5
2 cnet-technologies Bid Analytics 72,35,362.83 L9
3 cnet-technologies Bid Analytics 67,64,836.7 L6
4 cnet-technologies Bid Analytics 65,08,551.9 L2
5 cnet-technologies Bid Analytics 68,38,314.08 L7
6 cnet-technologies Bid Analytics 57,37,619.6 L1
7 cnet-technologies Bid Analytics 65,53,469.4 L3
8 cnet-technologies Bid Analytics 65,94,536 L4
9 cnet-technologies Bid Analytics 71,01,863.58 L8
Work Detail
tender for construction work of new culvert at km 1.545 of amausi rajbaha. - earth work in making road diversionby power transport with lead upto 5 km including excavation ,loading, unloading,royalty ,dressing mechanicalcompletion to achive 98% density. (for upstream and downstream vrb) 2 earth work inmaking bund & strengthinig of bank with partial dressing lead upto 30 meters, lift upto 1.5 meters excluding mechanical compaction but inclusive of manual compaction and dressing to profiles.(for upstream and downstream vrb) 3 dry brick on edge pitching including preparation of sub grade and filling joints with local sand including cost of material,labour t&p etc. on road diversion (for upstream and downstream vrb) 4 hiring & engaging diesel pumpof 5 h.p. with pol for dewatering at site.(for upstream and downstream vrb) 5 e/w in cutting in foundation of box culvert / guide wall on channelsincluding lead upto 30 m. and lift upto 1.5 m and disposal and back filling as per direction of engineer-in-charge. (for upstream and downstream vrb) 6 filling local sand including all cost of material, manual compaction, raming & watering ,labour t&p etc complete. (for upstream and downstream vrb) 7 laying plain cementconcrete (m -15) in foundation 1:2:4 with stone grie including cost of material, labour, t&p etc, complete. (for upstream and downstream vrb) 8 laying plain cementconcrete (m -10) in foundation 1:3:6 with stone grie including cost of material, labour, t&p etc, complete. (for upstream and downstream vrb) 9 laying reinforced cementconcrete (m25) in foundation , wall, slab etc. in 1:1:2 with stone grit including cost of material, labour, t&p etc, complete. (for upstream and downstream vrb) 10 bending,binding,cutting and placing in position reinforcement including all cost of labour and material t&p etc. required for porper completion of the work/mt.(for upstream and downstream vrb) 11 centring and shuttering for r.c.c. work including rent of shuttering & all cost of labour and material t&p etc. required for porper completion of the work/m2. (for upstream and downstream vrb) 12 providing & fixing 110 mm dia pvc drainage spouts complete in all respect including cost of allmaterial, labour and t&p etc. as per drawing (for upstream and downstream vrb) 13 class 150 brick work in 1:3 cmincluding 3 m lift and 60 m lead including all cost of material, labour, t&p etc. complete. (for upstream and downstream vrb) 14 providing & fixing 75 mm dia pvc weep holes complete in all respect including cost of allmaterial, labour and t&p etc. as per drawing (for upstream and downstream vrb) 15 providing & fixing bitumen joint filer board for expansion joints. (for upstream and downstream vrb) 16 cement pointing in 1:2 cement mortar including all cost of material, labour, t&p etc complete. (for upstream and downstream vrb) 17 finishing walls with premium acrylic smooth exterior paint with silicone additives of required shade new work (two or more coats applied @ 1.67 ltr/ 10 sqm)( apex ultima,wethercoat, all gard) (for upstream and downstream vrb) 18 dry brick on edge pitching including preparation of sub grade and filling joints with local sand including cost of material,labour t&p etc. on road diversion (for upstream and downstream vrb)
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 0e7378cc-39ef-4fd3-8e62-9d05383dd34f
Download boqcomparativechart
Download finance_1934553
Download finsummary_1934553
Download MUNNULALdos
Download technical_1934553
Download techsummary_1934553
Download File Name File Description
Download bd300197-e29a-49d0-9e47-c55461f8ea28 Tender Documents
Download BOQ_1934553 Tender Documents
Download lot1tendocvrb Tender Documents
Download Tendernotice_1 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000
Similar Tenders Results
TenderDetail
Loading tenders