Tender Result - Tender For Under District Barabanki, Construction Of Road From Nabipur To Cherra, Lot No 1 - Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.Non thorny jungle) ( By Mechanical Means) P.W.D. S.I. No 259 3 E/W in excavation in ordinary soil including lift 1.50 mtr and lead up to 30 mtr and including filling watering ramming of excavated earth into the trenches or into the space of between the building and side the foundation trench or into the plinth and removal and disposal of surplus earth as per direction by E/Iupto a distance of 30m from the foundation trenches including all T&P phowereh and basket etcas per S.I. No. 251 (For GSB Trenches) 4 Construction of Embankment with approved soil with a lift upto 1.5 m laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet requirement of table 300.1 and 300.2 5 Construction of Embankment with approved soil with a lift upto 1.5 m and lead 1000 mts laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet requirement of table 300.1 and 300.2 6 Construction of Subgrade and Earthen Shoulder with approved soil with all lifts and leads, laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet at least 100 % procter density complete to specification requirements 7 Construction of Subgrade and Earthen Shoulder with approved soil with all lifts and leads 1000 mts, laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet at least 100 % procter density complete to specification requirements 8 Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavater at OMC, and compacting with smooth wheeled roller to achieve the desired density as per clause 401(GSB Grade I) 9 Providing, laying, spreading and compacting stone aggregates of specific sizes (63-45 mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. (WBM II) 10 Providing, laying, spreading and compacting stone aggregates of specific sizes (53-22.4 mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. (WBM III) 11 Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means as per Technical Specification Clause 502 12 Providing and applying tack coat with Bitumen emulsion (RS-1)using emulsiondistributor at the rate of 0.275 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. 13 Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm (passing 100% on 22.4 mm sieve and fully retained on 11.2 mm seive ) and11.2 mm (passing 100% on 13.2 mm sieve and fully retained on 5.6 mm seive) granite stone grits in the ratio 2:1usingpenetration grade bitumento required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat ofType C as per Technical Specification Clause 508. (using Bitumen 80/100 grade) By Mechanical Means 14 Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall usingCase III - Type C as per Technical Specification Clause 510 (using 80/100) 15 Brick on Edges on both side of the road of 1st class brick 8 Cm.(3) Wide and 12 Cm(4.5) deep laid with Local Sand all labour finished to the required template and in proper alingnment including all labour, T&P sudries required fro proper completion of work with material as per S.I. No. 765 16 Laying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing the same with threewheel road roller 80-100 kN as per Technical Specification Clause 412 17 Reinforced cement concrete M15grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703.Ordinary Kilometer Stone (Precast) 18 Reinforced cement concrete M15grade hectometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703.200 m Stone (Precast) 19 Providing and Laying Plain/reinforced cement concrete 1:1.5:3 ( l cement : 1.5 coarse sand : 3 graded stone ballast 20mm nominal size ) in Substructure including supply of all materials. Labour and T&P etc. required for proper completion of the work and curing complete also including cost of formwork R.C.C grade M-25 (nominal mix) P.W.D. S.I. No 283A 20 Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 as per SI No 504 21 Providing & laying of InterlockingConcrete Block pavements having thickness 80 mm as per drawings and techinical Specification Clause 1504 (Laid over previously prepared subbase using 100mm thick GSB, excluding cost of GSB ) 22 Drain 23 E/W in excavation in foundation in ordinary soil including lift 1.50 mtr and lead up to 30 mtr and including filling watering ramming of excavated earth into the trenches or into the space of between the building and side the foundation trench or into the plinth and removal and disposal of surplus earth as per direction by E/Iupto a distance of 30m from the foundation trenches including all T&P phowereh and basket etcas per S.I. No. 251 24 Brick work in 1:4 ( one cement and Three corse sand mortar ) including supply of all materials, labour & tool & plants etc. required for proper completion of work. As per SI No 305(b) 25 Providing and laying Cement concrete 1:3:6 ( l cement : 3 coarse sand : 6 graded stone ballast 40 mm. nominal size ) including supply of all materials. Labour and T&P etc. required for proper completion of the work and curing complete also including cost of formwork in foundation as per SI No 280 26 Plastering with cement mortar (1:3), (Cement and coarse Sand)12mm thick on brickwork in substructure as per technical specification as per SI No 583 27 Providing and laying Cement concrete 1:2:4 ( l cement : 2 coarse sand : 4 graded stone ballastnominal size ) including supply of all materials. Labour and T&P etc. required for proper completion of the work and curing complete also including cost of formwork in foundation as per Si No 279(a) 28 450 mm dia H/P Culvert 29 E/W in excavation in foundation in ordinary soil including lift 1.50 mtr and lead up to 30 mtr and including filling watering ramming of excavated earth into the trenches or into the space of between the building and side the foundation trench or into the plinth and removal and disposal of surplus earth as per direction by E/Iupto a distance of 30m from the foundation trenches including all T&P phowereh and basket etcas per S.I. No. 251 30 Providing and laying Cement concrete 1:3:6 ( l cement : 3 coarse sand : 6 graded stone ballast 40 mm. nominal size ) including supply of all materials. Labour and T&P etc. required for proper completion of the work and curing complete also including cost of formwork in foundation as per SI No 280 31 Fillling in foundation trenches using coarse sand/ screening as per drawing and technical specification Clause 305.3.9 32 First Class Brick work in 1:4 ( one cement and four corse sand mortar ) including supply of all materials, labour & tool & plants etc. required for proper completion of work. As per SI No 305(b) 33 Laying Cement Concrete 450mm dia Pipe NP3 (burried conduits) on first class bedding of granular material in single row including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapet 34 Pointing with cement mortar (1:2) on brickwork as per drawing and technical specification Clauses 613.3 as per PWD SI No 574 35 Retaining Wall 36 E/W in excavation in foundation in ordinary soil including lift 1.50 mtr and lead up to 30 mtr and including filling watering ramming of excavated earth into the trenches or into the space of between the building and side the foundation trench or into the plinth and removal and disposal of surplus earth as per direction by E/Iupto a distance of 30m from the foundation trenches including all T&P phowereh and basket etcas per S.I. No. 251 37 Providing and laying Cement concrete 1:3:6 ( l cement : 3 coarse sand : 6 graded stone ballast 40 mm. nominal size ) including supply of all materials. Labour and T&P etc. required for proper completion of the work and curing complete also including cost of formwork in foundation as per SI No 280 38 First Class Brick work in 1:4 ( one cement and four corse sand mortar ) including supply of all materials, labour & tool & plants etc. required for proper completion of work. As per SI No 305(b) 39 Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing 40 Pointing with cement mortar (1:2) on brickwork as per drawing and technical specification Clauses 613.3 as per PWD SI No 574
Tender Detail
7919218
Rural Engineering Department
Tender For Under District Barabanki, Construction Of Road From Nabipur To Cherra, Lot No 1 - Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.Non thorny jungle) ( By Mechanical Means) P.W.D. S.I. No 259 3 E/W in excavation in ordinary soil including lift 1.50 mtr and lead up to 30 mtr and including filling watering ramming of excavated earth into the trenches or into the space of between the building and side the foundation trench or into the plinth and removal and disposal of surplus earth as per direction by E/Iupto a distance of 30m from the foundation trenches including all T&P phowereh and basket etcas per S.I. No. 251 (For GSB Trenches) 4 Construction of Embankment with approved soil with a lift upto 1.5 m laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet requirement of table 300.1 and 300.2 5 Construction of Embankment with approved soil with a lift upto 1.5 m and lead 1000 mts laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet requirement of table 300.1 and 300.2 6 Construction of Subgrade and Earthen Shoulder with approved soil with all lifts and leads, laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet at least 100 % procter density complete to specification requirements 7 Construction of Subgrade and Earthen Shoulder with approved soil with all lifts and leads 1000 mts, laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet at least 100 % procter density complete to specification requirements 8 Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavater at OMC, and compacting with smooth wheeled roller to achieve the desired density as per clause 401(GSB Grade I) 9 Providing, laying, spreading and compacting stone aggregates of specific sizes (63-45 mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. (WBM II) 10 Providing, laying, spreading and compacting stone aggregates of specific sizes (53-22.4 mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. (WBM III) 11 Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means as per Technical Specification Clause 502 12 Providing and applying tack coat with Bitumen emulsion (RS-1)using emulsiondistributor at the rate of 0.275 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. 13 Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm (passing 100% on 22.4 mm sieve and fully retained on 11.2 mm seive ) and11.2 mm (passing 100% on 13.2 mm sieve and fully retained on 5.6 mm seive) granite stone grits in the ratio 2:1usingpenetration grade bitumento required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat ofType C as per Technical Specification Clause 508. (using Bitumen 80/100 grade) By Mechanical Means 14 Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall usingCase III - Type C as per Technical Specification Clause 510 (using 80/100) 15 Brick on Edges on both side of the road of 1st class brick 8 Cm.(3) Wide and 12 Cm(4.5) deep laid with Local Sand all labour finished to the required template and in proper alingnment including all labour, T&P sudries required fro proper completion of work with material as per S.I. No. 765 16 Laying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing the same with threewheel road roller 80-100 kN as per Technical Specification Clause 412 17 Reinforced cement concrete M15grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703.Ordinary Kilometer Stone (Precast) 18 Reinforced cement concrete M15grade hectometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703.200 m Stone (Precast) 19 Providing and Laying Plain/reinforced cement concrete 1:1.5:3 ( l cement : 1.5 coarse sand : 3 graded stone ballast 20mm nominal size ) in Substructure including supply of all materials. Labour and T&P etc. required for proper completion of the work and curing complete also including cost of formwork R.C.C grade M-25 (nominal mix) P.W.D. S.I. No 283A 20 Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 as per SI No 504 21 Providing & laying of InterlockingConcrete Block pavements having thickness 80 mm as per drawings and techinical Specification Clause 1504 (Laid over previously prepared subbase using 100mm thick GSB, excluding cost of GSB ) 22 Drain 23 E/W in excavation in foundation in ordinary soil including lift 1.50 mtr and lead up to 30 mtr and including filling watering ramming of excavated earth into the trenches or into the space of between the building and side the foundation trench or into the plinth and removal and disposal of surplus earth as per direction by E/Iupto a distance of 30m from the foundation trenches including all T&P phowereh and basket etcas per S.I. No. 251 24 Brick work in 1:4 ( one cement and Three corse sand mortar ) including supply of all materials, labour & tool & plants etc. required for proper completion of work. As per SI No 305(b) 25 Providing and laying Cement concrete 1:3:6 ( l cement : 3 coarse sand : 6 graded stone ballast 40 mm. nominal size ) including supply of all materials. Labour and T&P etc. required for proper completion of the work and curing complete also including cost of formwork in foundation as per SI No 280 26 Plastering with cement mortar (1:3), (Cement and coarse Sand)12mm thick on brickwork in substructure as per technical specification as per SI No 583 27 Providing and laying Cement concrete 1:2:4 ( l cement : 2 coarse sand : 4 graded stone ballastnominal size ) including supply of all materials. Labour and T&P etc. required for proper completion of the work and curing complete also including cost of formwork in foundation as per Si No 279(a) 28 450 mm dia H/P Culvert 29 E/W in excavation in foundation in ordinary soil including lift 1.50 mtr and lead up to 30 mtr and including filling watering ramming of excavated earth into the trenches or into the space of between the building and side the foundation trench or into the plinth and removal and disposal of surplus earth as per direction by E/Iupto a distance of 30m from the foundation trenches including all T&P phowereh and basket etcas per S.I. No. 251 30 Providing and laying Cement concrete 1:3:6 ( l cement : 3 coarse sand : 6 graded stone ballast 40 mm. nominal size ) including supply of all materials. Labour and T&P etc. required for proper completion of the work and curing complete also including cost of formwork in foundation as per SI No 280 31 Fillling in foundation trenches using coarse sand/ screening as per drawing and technical specification Clause 305.3.9 32 First Class Brick work in 1:4 ( one cement and four corse sand mortar ) including supply of all materials, labour & tool & plants etc. required for proper completion of work. As per SI No 305(b) 33 Laying Cement Concrete 450mm dia Pipe NP3 (burried conduits) on first class bedding of granular material in single row including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapet 34 Pointing with cement mortar (1:2) on brickwork as per drawing and technical specification Clauses 613.3 as per PWD SI No 574 35 Retaining Wall 36 E/W in excavation in foundation in ordinary soil including lift 1.50 mtr and lead up to 30 mtr and including filling watering ramming of excavated earth into the trenches or into the space of between the building and side the foundation trench or into the plinth and removal and disposal of surplus earth as per direction by E/Iupto a distance of 30m from the foundation trenches including all T&P phowereh and basket etcas per S.I. No. 251 37 Providing and laying Cement concrete 1:3:6 ( l cement : 3 coarse sand : 6 graded stone ballast 40 mm. nominal size ) including supply of all materials. Labour and T&P etc. required for proper completion of the work and curing complete also including cost of formwork in foundation as per SI No 280 38 First Class Brick work in 1:4 ( one cement and four corse sand mortar ) including supply of all materials, labour & tool & plants etc. required for proper completion of work. As per SI No 305(b) 39 Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing 40 Pointing with cement mortar (1:2) on brickwork as per drawing and technical specification Clauses 613.3 as per PWD SI No 574
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.