BRR : 7872711
Tender Brief : Bids Are Invited For Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site unit 3 and 4; Rewinding of Three phase 415 V 50Hz motors of less than 1 point 1kW rating as per Part A Scope of work Total quantity 1 is equal to 12 Nos fo.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site unit 3 and 4; Rewinding of Three phase 415 V 50Hz motors of more than 1 point 1 kW up to 2 point 2 kW rating as per Part A scope of work Total quantity 1.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - R... Read More
Tender Value
₹
78,12,004
Contract Value
₹ 87,45,060
Saving / Difference
₹ -9,33,056
▼
Submission Date
02-05-2025
Contract Date
Ref. Document
Completion Date
Ref. Document
Participated Bidder List
1 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 87,45,060 | L1 |
Work Detail
bids are invited for repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of three phase 415 v 50hz motors of less than 1 point 1kw rating as per part a scope of work total quantity 1 is equal to 12 nos fo.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of three phase 415 v 50hz motors of more than 1 point 1 kw up to 2 point 2 kw rating as per part a scope of work total quantity 1.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of three phase 415 v 50hz motors of more than 2 point 2 kw up to 5 point 5 kw rating as per part a scope of work total quantity .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of three phase 415 v 50hz motors of more than 5 point 5 kw up to 11 kw rating as per part a scope of work total quantity 1 is e.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of three phase 415 v 50hz motors of more than 11 kw up to 22 kw rating as per part a scope of work total quantity 1 is equal to.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of three phase 415 v 50hz motors of more than 22 kw up to 55 kw rating as per part a scope of work total quantity 1 is equal t.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of three phase 415 v 50hz motors of more than 55 kw up to 75 kw rating as per part a scope of work total quantity 1 is equal to.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of three phase 415 v 50hz motors of more than to 90 kw rating as per part a scope of work total quantity 1 is equal t.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of three phase 415 v 50hz motors of more than 90 kw up to 110 kw rating as per part a scope of work total quantity 1 is equal to.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of three phase 415 v 50hz motors of more than 110 kw up to 132 kw rating as per part a scope of work total quantity 1 is equal .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of three phase 415 v 50hz motors of more than 132 kw up to 140 kw rating as per part a scope of work total quantity 1 is equal t.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of three phase 415 v 50hz motors of more than 140 kw up to 180 kw rating as per part a scope of work total quantity 1 is equal t.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of three phase 415 v 50hz submersible pump motors up to 2 point 5 kw rating as per part a scope of work total quantity 1 is equal.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of three phase 415 v 50hz submersible pump motors more than 2 point 5 kw up to 5 point 5 kw rating as per part a scope of work t.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of three phase 415 v 50hz submersible pump motors more than 5 point 5 kw up to 11 kw rating as per part a scope of work total qua.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of three phase 415 v 50hz submersible pump motors more than 11 kw up to 15 kw rating as per part a scope of work total quantity 1.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of three phase 415 v 50hz submersible pump motors more than 15 kw up to 37 kw rating as per part a scope of work total quantity .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of single phase 230 v 50hz motors of ceiling fan 1200 mm sweep as per part a scope of work total quantity 1 is equal to 75 nos .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of single phase 230 v 50hz motors of pedestal fan or wall mounted fan or exhaust fan up to 450 mm sweep as per part a scope of work.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of single phase 230 v 50hz motors of exhaust fan or cooler fan above 400 mm sweep as per part a scope of work total quantity 1 is eq.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of self starter motor 24v dc type 10th 232 c suitable for greave diesel engine model 64dx mark ii as per part a scope of work total quan.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of 2000 va control transformer as per part a scope of work total quantity 1 is equal to 02 nos for two years; service provider , repair, maintenance, and installation of plant/ systems/equipments (version part a scope of work total quantity 1 is equal to 02 nos for two years; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of 500 va control transformer as per part a scope of work total quantity 1 is equal to 02 nos for two years; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of control coil 415v diameter up to 300mm including bobbin as per part a scope of work total quantity 1 is equal to 02 nos for two ye.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of single phase 230 v 50hz submersible pump motors up to 1 point 5 kw rating as per part a scope of work total quantity 1 is equa.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; supply and installation of shaft for ceiling fan or pedestal fans as per part a scope of work total quantity 1 is equal to 25 nos for two years; se.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; supply and installation of gun metal bushes as per part a scope of work total quantity 1 is equal to 25 nos for two years; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; repair of hot spot in three phase 415 v 50hz motors up to 1 point 5 kw rating as per part b scope of work total quantity 1 is equal to 02 no.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; repair of hot spot in three phase 415 v 50hz motors of more than 1 point 5 kw up to 7 point 5 kw rating as per part b scope of work to.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; repair of hot spot in three phase 415 v 50hz motors of more than 7 point 5 kw up to 22 kw rating as per part b scope of work total quan.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; repair of hot spot in three phase 415 v 50hz motors of more than 22 kw up to 45 kw rating as per part b scope of work total quantity 1 i.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; repair of hot spot in three phase 415 v 50hz motors of more than 45 kw up to 90 kw rating as per part b scope of work total quantity 1.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; repair of hot spot in three phase 415 v 50hz motors of more than 90 kw up to 180kw rating as per part b scope of work total quantity 1 i.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; removal of hot spot by dismantling of total stampings in three phase 415 v 50hz motors up to 22 kw rating as per part b scope of work tot.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; removal of hot spot by dismantling of total stampings in three phase 415 v 50hz motors of more than 22 kw up to 45 kw rating as per part.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; removal of hot spot by dismantling of total stampings in three phase 415 v 50hz motors of more than 45 kw up to 90 kw rating as per part.. , repair, maintenance, and installation of plant/ systems/equipments (version and 4; removal of hot spot by dismantling of total stampings in three phase 415 v 50hz motors of more than 90 kw up to 180 kw rating as per par.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; re metalizing of shaft using tafa arc technique after preparation of surface and machining to proper size up to 1 point 5 kw motor as per part b sc.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; re metalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 1 point 5kw up to 7 point 5 kw.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; re metalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 7 point 5 kw up to 15kw motor a.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; re metalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 15 up to 45 kw motor as per par.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; re metalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 45kw up to 90 kw motor as per p.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; re metalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 90kw to 180kw motor as per part.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; re metalizing of end covers using tafa arc technique after preparation of surface and machining to proper size up to 1 point 5 kw motor as per part.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; re metalizing of end covers using tafa arc technique after preparation of surface and machining to proper size more than 1 point 5 kw up to 7 poin.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; re metalizing of end covers using tafa arc technique after preparation of surface and machining to proper size more than 7 point 5 kw to 15kw motor.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; re metalizing of end covers using tafa arc technique after preparation of surface and machining to proper size more than 15 kw up to 45 kw motor as.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; re metalizing of end covers using tafa arc technique after preparation of surface and machining to proper size more than 45kw up to 90 kw motor as .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; re metalizing of end covers using tafa arc technique after preparation of surface and machining to proper size more than 90 kw to 180kw motor as pe.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; replacement of pvc cooling fan for motors size up to 1 point 5 kw as per part b scope of work total quantity 1 is equal to 8 nos for two years; se.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; replacement of pvc cooling fan for motors size more than point 5kw up to 7 point 5 kw as per part b scope of work total quantity 1 is equal to 8.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; replacement of pvc cooling fan for motors size more than 7 point 5kw upto 15kw as per part b scope of work total quantity 1 is equal to 8 nos for .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; replacement of pvc cooling fan for motors size more than 15kw up to 45kw as per part b scope of work total quantity 1 is equal to 8 nos for two ye.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; dynamic balancing of rotor with 2 point 5microns accuracy size more than 1kg up to 4 kg as per part b scope of work total quantity 1 is equal to 2.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; dynamic balancing of rotor with 2 point 5microns accuracy size more than 4 kg up to 16 kg as per part b scope of work total quantity 1 is equal to.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; dynamic balancing of rotor with 2 point 5microns accuracy size more than 16 kg up to 48 kg as per part b scope of work total quantity 1 is equal t.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; dynamic balancing of rotor with 2 point 5microns accuracy size more than 48 kg up to 96 kg as per part b scope of work total quantity 1 is equal t.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; dynamic balancing of rotor with 2 point 5microns accuracy size more than 96 kg up to 192 kg as per part b scope of work total quantity 1 is equal .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; dynamic balancing of rotor with 2 point 5microns accuracy size more than 192 kg up to 378 kg as per part b scope of work total quantity 1 is equal.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; dynamic balancing of rotor with 2 point 5microns accuracy size more than 378 kg up to 500 kg as per part b scope of work total quantity 1 is equal.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; dynamic balancing of rotor with 2 point 5microns accuracy size more than 500 kg up to 1000 kg as per part b scope of work total quantity 1 is equa.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; dynamic balancing of rotor with 2 point 5microns accuracy size more than 1000 kg up to 1500 kg as per part b scope of work total quantity 1 is equ.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; dynamic balancing of rotor with 2 point 5microns accuracy size more than 1500 kg up to 3000 kg as per part b scope of work total quantity 1 is equ.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; supply and installation of terminal plate or terminal studs with insulators one quantity includes terminal studs for all three phases size up to 1 .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; supply and installation of terminal plate or terminal studs with insulators one quantity includes terminal studs for all three phases size more tha.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and supply and installation of terminal plate or terminal studs with insulators one quantity includes terminal studs for all three phases size more th.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; removing of shaft making of new shaft and refitting of shaft with key way material used shall be same as original and material is in contractor sco.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; making of end cover including machining drilling and threading etc to size up to 1 point 5 kw material cast iron for above end cover is in contra.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; making of end cover including machining drilling and threading etc to size more than 1 point 5kw up to 7 point 5 kw material cast iron for above .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; making of end cover including machining drilling and threading etc to size more than 7 point 5kw up to 15kw material cast iron for above end cove.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; making of end cover including machining drilling and threading etc to size more than 15kw up to 45kw material cast iron for above end cover is in .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; making of end cover including machining drilling and threading etc to size more than 45kw up to 90kw material cast iron for above end cover is in.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; making of end cover including machining drilling and threading etc to size more than 90kw up to 180kw material cast iron for above end cover is in.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; making of cooling fan including machining keyway and key hub excluding material size up to 1 point 5 kw as per part b scope of work total quanti.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; making of cooling fan including machining keyway and key hub excluding material size more than 1 point 5kw up to 7 point 5 kw as per part b scope.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; making of cooling fan including machining keyway and key hub excluding material size more than 7 point 5kw up to 15kw as per part b scope of work .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; making of cooling fan including machining keyway and key hub excluding material size more than 15kw up to 45kw as per part b scope of work total q.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; making of cooling fan including machining keyway and key hub excluding material size more than 45kw up to 90kw as per part b scope of work total.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; making of cooling fan including machining keyway and key hub excluding material size more than 90kw up to 180kw as per part b scope of work total.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; material cost iron for making of cooling fan end cover as per part b scope of work total quantity to 100 kg for two years; service provi.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing and fixing of bearing plates with material same as original size up to 1 point 5 kw as per part b scope of work total quantity 1 is eq.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing and fixing of bearing plates with material same as original size more than 1 point 5kw up to 7 point 5 kw as per part b scope of work .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing and fixing of bearing plates with material same as original size more than 7 point 5kw up to 15kw as per part b scope of work total qu.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing and fixing of bearing plates with material same as original size more than 15kw up to 45kw as per part b scope of work total quantity .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing and fixing of bearing plates with material same as original size more than 45kw up to 90kw as per part b scope of work total quantity 1.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing and fixing of bearing plates with material same as original size more than 90kw up to 180kw as per part b scope of work total quantity .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing and fixing of bearing locks duly machined threaded and drilled with material same as original size up to 15kw as per part b scope of work.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing and fixing of bearing locks duly machined threaded and drilled with material same as original size more than 15kw up to 45kw as per part .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing and fixing of bearing locks duly machined threaded and drilled with material same as original size more than 45kw up to 90kw as per part .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing and fixing of bearing locks duly machined threaded and drilled with material same as original size more than 90kw to 180kw as per part b.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing and fixing of foundation legs including machining drilling and levelling etc material shall be in contractor scope size up to 1 point 5 k.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing and fixing of foundation legs including machining drilling and levelling etc material shall be in contractor scope size more than 1 point.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing and fixing of foundation legs including machining drilling and levelling etc material shall be in contractor scope size more than 7 point.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing and fixing of foundation legs including machining drilling and levelling etc material shall be in contractor scope size more than 15 up t.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site dismantling and refitting without varnish and baking size up to 1 point 5 kw as per part b scope of work total quantity 1 is equal to 2 nos for tw.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; dismantling and refitting without varnish and baking size more than 1 point 5kw up to 7 point 5kw as per part b scope of work total quantity 1 is e.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; dismantling and refitting without varnish and baking size more than 7 point 5kw up to 15kw as per part b scope of work total quantity 1 is equal t.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; dismantling and refitting without varnish and baking size more than 15kw up to 45kw as per part b scope of work total quantity 1 is equal to 2 nos .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; dismantling and refitting without varnish and baking size more than 45kw up to 90kw as per part b scope of work total quantity 1 is equal to 1 nos.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; dismantling and refitting without varnish and baking size more than 90kw up to 180kw as per part b scope of work total quantity 1 is equal to 1 no.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; dismantling and refitting with varnish and baking size up to 1 point 5 kw as per part b scope of work total quantity 1 is equal to 5 nos for two y.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; dismantling and refitting with varnish and baking size more than 1 point 5kw up to 7 point 5kw as per part b scope of work total quantity 1 is equa.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; dismantling and refitting with varnish and baking size more than 7 point 5kw up to 15kw as per part b scope of work total quantity 1 is equal to 3 .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; dismantling and refitting with varnish and baking size more than 15kw up to 45kw as per part b scope of work total quantity 1 is equal to 3 nos for.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; dismantling and refitting with varnish and baking size more than 45kw up to 90kw as per part b scope of work total quantity 1 is equal to 2 nos for.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; dismantling and refitting with varnish and baking size more than 90kw up to 180kw as per part b scope of work total quantity 1 is equal to 3 nos fo.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing and fixing of oil seal size less than 1 point 1 kw as per part b scope of work total quantity 1 is equal to 5 nos for two years; service.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing and fixing of oil seal size 1 point 1 kw to 2 point 2 kw as per part b scope of work total quantity 1 is equal to 5 nos for two years; .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing and fixing of oil seal size more than 2 point 2 kw up to 5 point 5 kw as per part b scope of work total quantity 1 is equal to 5 nos f.. , repair, maintenance installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing and fixing of oil seal size more than 5 point 5 kw up to 15 kw as per part b scope of work total quantity 1 is equal to 5 nos for two y.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing and fixing of oil seal size more than 15kw up to 30kw as per part b scope of work total quantity 1 is equal to 5 nos for two years; ser.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing and fixing of space heater size more than 30 up to 45kw as per part b scope of work total quantity 1 is equal to 2 nos for two years; se.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing and fixing of space heater size more than 45kw up to 90kw as per part b scope of work total quantity 1 is equal to 2 nos for two years; s.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing and fixing of space heater size more than 90kw up to 180kw as per part b scope of work total quantity 1 is equal to 2 nos for two years; .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing of skf make bearing 6203 zz as per part b scope of work total quantity 1 is equal to 10 nos for two years; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing of skf make bearing 6204 zz as per part b scope of work total quantity 1 is equal to 10 nos for two years; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing of skf make bearing 6205 zz as per part b scope of work total quantity 1 is equal to 10 nos for two years; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing of skf make bearing 6206 zz as per part b scope of work total quantity 1 is equal to 10 nos for two years; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing of skf make bearing 6208 zz as per part b scope of work total quantity 1 is equal to 10 nos for two years; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing of skf make bearing 6209 zz as per part b scope of work total quantity 1 is equal to 10 nos for two years; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing of skf make bearing 6310 zz as per part b scope of work total quantity 1 is equal to 10 nos for two years; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing of skf make bearing 6312 as per part b scope of work total quantity 1 is equal to 10 nos for two years; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing of skf make bearing 6312 zz as per part b scope of work total quantity 1 is equal to 10 nos for two years; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; providing of skf make bearing 6313 c3 as per part b scope of work total quantity 1 is equal to 10 nos for two years; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of three phase 415 v 50hz maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of three phase 415 v 50hz motors size more than 90 kw up to 110 kw as per part c scope of work total quantity 1 is equal to 1 nos for t.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of three phase 415 v 50hz motors size more than 110 kw up to 132 kw as per part c scope of work total quantity 1 is equal to 1 nos for.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site unit 3 and 4; rewinding of three phase 415 v 50hz motors 1. rewinding of three phase, 415 v, 50hz, motors of less than 1.1kw rating as per part-a, scope of work. (total quantity 1 is equal to 12 nos. for two years). price/qty. 1 2. rewinding of three phase, 415 v, 50hz, motors of more than 1.1 kw up to 2.2 kw rating as per part-a scope of work (total quantity 1 is equal to 12 nos. for two years). price/qty. 1 3. rewinding of three phase, 415 v, 50hz, motors of more than 2.2 kw up to 5.5 kw rating as per part-a scope of work (total quantity 1 is equal to 10 nos. for two years). price/qty. 1 4. rewinding of three phase, 415 v, 50hz, motors of more than 5.5 kw up to 11 kw rating as per part-a scope of work (total quantity 1 is equal to 08 nos. for two years). price/qty. 1 5. rewinding of three phase, 415 v, 50hz, motors of more than 11 kw up to 22 kw rating as per part-a scope of work (total quantity 1 is equal to 05 nos. for two years). price/qty. 1 6. rewinding of three phase, 415 v, 50hz, motors of more than 22 kw up to 55 kw rating as per part-a scope of work (total quantity 1 is equal to 05 nos. for two years). price/qty. 1 7. rewinding of three phase, 415 v, 50hz, motors of more than 55 kw up to 75 kw rating as per part-a scope of work (total quantity 1 is equal to 02 nos. for two years). price/qty. 1 8. rewinding of three phase, 415 v, 50hz, motors of more than 75 kw up to 90 kw rating as per part-a scope of work (total quantity 1 is equal to 02 nos. for two years). price/qty. 1 9. rewinding of three phase, 415 v, 50hz, motors of more than 90 kw up to 110 kw rating as per part-a scope of work (total quantity 1 is equal to 01 nos. for two years). price/qty. 1 10. rewinding of three phase, 415 v, 50hz, motors of more than 110 kw up to 132 kw rating as per part-a scope of work (total quantity 1 is equal to 02 nos. for two years). price/qty. 1 11. rewinding of three phase, 415 v, 50hz, motors of more than 132 kw up to 140 kw rating as per part-a scope of work (total quantity 1 is equal to 01 nos. for two years). price/qty. 1 12. rewinding of three phase, 415 v, 50hz, motors of more than 140 kw up to 180 kw rating as per part-a scope of work (total quantity 1 is equal to 02 nos. for two years). price/qty. 1 13. rewinding of three phase, 415 v, 50hz, submersible pump motors up to 2.5 kw rating as per part-a scope of work (total quantity 1 is equal to 06 nos. for two years). price/qty. 1 14. rewinding of three phase, 415 v, 50hz, submersible pump motors more than 2.5 kw up to 5.5 kw rating as per part-a scope of work (total quantity 1 is equal to 06 nos. for two years). price/qty. 1 15. rewinding of three phase, 415 v, 50hz, submersible pump motors more than 5.5 kw up to 11 kw rating as per part-a scope of work (total quantity 1 is equal to 03 nos. for two years). price/qty. 1 16. rewinding of three phase, 415 v, 50hz, submersible pump motors more than 11 kw up to 15 kw rating as per part-a scope of work (total quantity 1 is equal to 01 nos. for two years). price/qty. 1 17. rewinding of three phase, 415 v, 50hz, submersible pump motors more than 15 kw up to 37 kw rating as per part-a scope of work (total quantity 1 is equal to 01 nos. for two years). price/qty. 1 18. rewinding of single phase, 230 v, 50hz, motors of ceiling fan 1200 mm sweep as per part-a, scope of work. (total quantity 1 is equal to 75 nos. for two years). price19. rewinding of single phase, 230 v, 50hz, motors of pedestal fan/ wall mounted fan/ exhaust fan up to 450 mm sweep as per part-a, scope of work. (total quantity 1 is equal to 150 nos. for two years). price/qty 1 20. rewinding of single phase, 230 v, 50hz, motors of exhaust fan/cooler fan above 400 mm sweep as per part-a, scope of work. (total quantity 1 is equal to 50 nos. for two years). price/qty 1 21. rewinding of self-starter motor, 24v, dc, type 10th-232-c suitable for greave diesel engine, model -64dx-mark-ii as per part-a, scope of work. (total quantity 1 is equal to 04 nos. for two years). price/qty 1 22. rewinding of 2000 va control transformer as per part-a, scope of work. (total quantity 1 is equal to 02 nos. for two years). price/qty 1 23. rewinding of 1000 va control transformer as per part-a, scope of work. (total quantity 1 is equal to 02 nos. for two years). price/qty 1 24. rewinding of 500 va control transformer as per part-a, scope of work. (total quantity 1 is equal to 02 nos. for two years). price/qty 1 25. rewinding of control coil 415v, diameter up to 300mm including bobbin as per part-a, scope of work. (total quantity 1 is equal to 02 nos. for two years). price/qty 1 26. rewinding of single phase, 230 v, 50hz, submersible pump motors up to 1.5 kw rating as per part-a scope of work (total quantity 1 is equal to 02 nos. for two years). price/qty 1 27. supply and installation of shaft for ceiling fan/pedestal fans as per part-a scope of work (total quantity 1 is equal to 25 nos. for two years). price/qty 1 28. supply and installation of gun metal bushes as per part-a scope of work (total quantity 1 is equal to 25 nos. for two years). price/qty 1 29. repair of hot spot in three phase, 415 v, 50hz, motors up to 1.5 kw rating as per part-b scope of work (total quantity 1 is equal to 02 nos. for two years). price/qty 1 30. repair of hot spot in three phase, 415 v, 50hz, motors of more than 1.5 kw up to 7.5 kw rating as per part-b scope of work (total quantity 1 is equal to 02 nos. for two years). price/qty 1 31. repair of hot spot in three phase, 415 v, 50hz, motors of more than 7.5 kw up to 22 kw rating as per part-b scope of work (total quantity 1 is equal to 01 nos. for two years). price/qty 1 32. repair of hot spot in three phase, 415 v, 50hz, motors of more than 22 kw up to 45 kw rating as per part-b scope of work (total quantity 1 is equal to 01 nos. for two years). price/qty 1 33. repair of hot spot in three phase, 415 v, 50hz, motors of more than 45 kw up to 90 kw rating as per part-b scope of work (total quantity 1 is equal to 01 nos. for two years). price/qty 1 34. repair of hot spot in three phase, 415 v, 50hz, motors of more than 90 kw up to 180kw rating as per part-b scope of work (total quantity 1 is equal to 01 nos. for two years). price/qty 1 35. removal of hot-spot by dismantling of total stampings in three phase, 415 v, 50hz, motors up to 22 kw rating as per part-b scope of work (total quantity 1 is equal to 25 per cm for two years). price/qty 1 36. removal of hot-spot by dismantling of total stampings in three phase, 415 v, 50hz, motors of more than 22 kw up to 45 kw rating as per part-b scope of work (total quantity 1 is equal to 25 per cm for two years). price/qty 1 37. removal of hot-spot by dismantling of total stampings in three phase, 415 v, 50hz, motors of more than 45 kw up to 90 kw rating as per part-b scope of work (total quantity 1 is equal to 40 per cm for two years). price/qty 1 38. removal of hot-spot by dismantling of total stampings in three phase, 415 v, 50hz, motors of more than 90 kw up to 180 kw rating as per part-b scope of work (total quantity 1 is equal to 40 per cm for two years). price/qty 1 39. re-metalizing of shaft using tafa arc technique after preparation of surface and machining to proper size up to 1.5 kw motor as per part-b scope of work (total quantity 1 is equal to 15 nos. for two years). 40. re-metalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 1.5kw up to 7.5 kw motor as per part- b scope of work (total quantity 1 is equal to 15 nos. for two years). price/qty 1 41. re-metalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 7.5 kw up to 15kw motor as per part-b scope of work (total quantity 1 is equal to 10 nos. for two years). price/qty 1 42. re-metalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 15 up to 45 kw motor as per part-b scope of work (total quantity 1 is equal to 10 nos. for two years). price/qty 1 43. re-metalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 45kw up to 90 kw motor as per part-b scope of work (total quantity 1 is equal to 5 nos. for two years). price/qty 1 44. re-metalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 90kw to 180kw motor as per part-b scope of work (total quantity 1 is equal to 5 nos. for two years). price/qty 1 45. re-metalizing of end covers using tafa arc technique after preparation of surface and machining to proper size up to 1.5 kw motor as per part-b scope of work (total quantity 1 is equal to 15 nos. for two years). price/qty 1 46. re-metalizing of end covers using tafa arc technique after preparation of surface and machining to proper size more than 1.5 kw up to 7.5 kw motor as per part-b scope of work (total quantity 1 is equal to 15 nos. for two years). price/qty 1 47. re-metalizing of end covers using tafa arc technique after preparation of surface and machining to proper size more than 7.5 kw to 15kw motor as per part-b scope of work (total quantity 1 is equal to 12 nos. for two years). price/qty 1 48. re-metalizing of end covers using tafa arc technique after preparation of surface and machining to proper size more than 15 kw up to 45 kw motor as per part-b scope of work (total quantity 1 is equal to 12 nos. for two years). price/qty 1 49. re-metalizing of end covers using tafa arc technique after preparation of surface and machining to proper size more than 45kw up to 90 kw motor as per part-b scope of work (total quantity 1 is equal to 5 nos. for two years). price/qty 1 50. re-metalizing of end covers using tafa arc technique after preparation of surface and machining to proper size more than 90 kw to 180kw motor as per part-b scope of work (total quantity 1 is equal to 5 nos. for two years). price/qty 1 51. replacement of pvc cooling fan for motors size up to 1.5 kw as per part-b scope of work (total quantity 1 is equal to 8 nos. for two years). price/qty 1 52. replacement of pvc cooling fan for motors size more than 1.5kw up to 7.5 kw as per part-b scope of work (total quantity 1 is equal to 8 nos. for two years). price/qty 1 53. replacement of pvc cooling fan for motors size more than 7.5kw unto 15kw as per part-b scope of work (total quantity 1 is equal to 8 nos. for two years). price/qty 1 54. replacement of pvc cooling fan for motors size more than 15kw up to 45kw as per part-b scope of work (total quantity 1 is equal to 8 nos. for two years). price/qty 1 55. dynamic balancing of rotor with 2.5microns accuracy size more than 1kg up to 4 kg as per part-b scope of work (total quantity 1 is equal to 2 nos. for two years). price/qty 1 56. dynamic balancing of rotor with 2.5microns accuracy size more than 4 kg up to 16 kg as per part-b scope of work (total quantity 1 is equal to 5 nos. for two years). price/qty 1 57. dynamic balancing of rotor with 2.5microns accuracy size more than 16 kg up to 48 kg as per part-b scope of work (total quantity 1 is equal to 5 nos. for two years). price/qty 1 58. dynamic balancing of rotor with 2.5microns accuracy size more than 48 kg up to 96 kg as per part-b scope of work (total quantity 1 is equal to 5 nos. for two years). price/qty 1 59. dynamic balancing of rotor with 2.5microns accuracy size more than 96 kg up to 192 kg as per part-b scope of work (total quantity 1 is equal to 2 nos. for two years). 60. dynamic balancing of rotor with 2.5microns accuracy size more than 192 kg up to 378 kg as per part-b scope of work (total quantity 1 is equal to 2 nos. for two years). price/qty 1 61. dynamic balancing of rotor with 2.5microns accuracy size more than 378 kg up to 500 kg as per part-b scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 62. dynamic balancing of rotor with 2.5microns accuracy size more than 500 kg up to 1000 kg as per part-b scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 63. dynamic balancing of rotor with 2.5microns accuracy size more than 1000 kg up to 1500 kg as per part-b scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 64. dynamic balancing of rotor with 2.5microns accuracy size more than 1500 kg up to 3000 kg as per part-b scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 65. supply and installation of terminal plate/ terminal studs with insulators (one quantity includes terminal studs for all three phases) size up to 1.5kw as per part-b scope of work (total quantity 1 is equal to 2 nos. for two years). price/qty 1 66. supply and installation of terminal plate/ terminal studs with insulators (one quantity includes terminal studs for all three phases) size more than 1.5kw up to 7.5kw as per part-b scope of work (total quantity 1 is equal to 2 nos. for two years). price/qty 1 67. supply and installation of terminal plate/ terminal studs with insulators (one quantity includes terminal studs for all three phases) size more than 7.5kw up to 15kw as per part-b scope of work (total quantity 1 is equal to 2 nos. for two years). price/qty 1 68. supply and installation of terminal plate/ terminal studs with insulators (one quantity includes terminal studs for all three phases) size more than 15kw up to 45kw as per part-b scope of work (total quantity 1 is equal to 2 nos. for two years). price/qty 1 69. supply and installation of terminal plate/ terminal studs with insulators (one quantity includes terminal studs for all three phases) size more than 45kw up to 90kw as per part-b scope of work (total quantity 1 is equal to 2 nos. for two years). price/qty 1 70. supply and installation of terminal plate/ terminal studs with insulators (one quantity includes terminal studs for all three phases) size more than 90kw up to 180kw as per part-b scope of work (total quantity 1 is equal to 2 nos. for two years). price/qty 1 71. removing of shaft, making of new shaft & refitting of shaft with key way. (material used shall be same as original and material is in contractor scope) size up to 1.5 kw as per part-b scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 72. removing of shaft, making of new shaft & refitting of shaft with key way. (material used shall be same as original and material is in contractor scope) size more than 1.5kw up to 7.5 kw as per part-b scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 73. removing of shaft, making of new shaft & refitting of shaft with key way. (material used shall be same as original and material is in contractor scope) size more than 7.5kw to 15kw as per part-b scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 74. removing of shaft, making of new shaft & refitting of shaft with key way. (material used shall be same as original and material is in contractor scope) size more than 15kw to 45 kw as per part-b scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 75. making of end cover including , machining, drilling and threading etc. to size up to 1.5 kw ( material cast iron for above end cover is in contractor scope) as per part-b scope of work (total quantity 1 is equal to 1 nos. for two years). 76. making of end cover including , machining, drilling and threading etc. to size more than 1.5kw up to 7.5 kw ( material cast iron for above end cover is in contractor scope) as per part-b scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 77. making of end cover including , machining, drilling and threading etc. to size more than 7.5kw up to 15kw ( material cast iron for above end cover is in contractor scope) as per part-b scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 78. making of end cover including , machining, drilling and threading etc. to size more than 15kw up to 45kw (material cast iron for above end cover is in contractor scope) as per part-b scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 79. making of end cover including , machining, drilling and threading etc. to size more than 45kw up to 90kw ( material cast iron for above end cover is in contractor scope) as per part-b scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 80. making of end cover including , machining, drilling and threading etc. to size more than 90kw up to 180kw ( material cast iron for above end cover is in contractor scope) as per part-b scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 81. making of cooling fan including , machining, keyway & key hub: (excluding material) size up to 1.5 kw as per part-b scope of work (total quantity 1 is equal to 2 nos. for two years). price/qty 1 82. making of cooling fan including , machining, keyway & key hub: (excluding material) size more than 1.5kw up to 7.5 kw as per part-b scope of work (total quantity 1 is equal to 2 nos. for two years). price/qty 1 83. making of cooling fan including , machining, keyway & key hub: (excluding material) size more than 7.5kw up to 15kw as per part-b scope of work (total quantity 1 is equal to 2 nos. for two years). price/qty 1 84. making of cooling fan including , machining, keyway & key hub: (excluding material) size more than 15kw up to 45kw as per part-b scope of work (total quantity 1 is equal to 2 nos. for two years). price/qty 1 85. making of cooling fan including , machining, keyway & key hub: (excluding material) size more than 45kw up to 90kw as per part-b scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 86. making of cooling fan including , machining, keyway & key hub: (excluding material) size more than 90kw up to 180kw as per part-b scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 87. material cost iron for making of cooling fan, end cover as per part-b scope of work (total quantity 1 is equal to 100 kg for two years). price/qty 1 88. providing & fixing of bearing plates with material (same as original) size up to 1.5 kw as per part-b scope of work (total quantity 1 is equal to 2 nos. for two years). price/qty 1 89. providing & fixing of bearing plates with material (same as original) size more than 1.5kw up to 7.5 kw as per part-b scope of work (total quantity 1 is equal to 2 nos. for two years). price/qty 1 90. providing & fixing of bearing plates with material (same as original) size more than 7.5kw up to 15kw as per part-b scope of work (total quantity 1 is equal to 2 nos. for two years). price/qty 1 91. providing & fixing of bearing plates with material (same as original) size more than 15kw up to 45kw as per part-b scope of work (total quantity 1 is equal to 2 nos. for two years). price/qty 1 92. providing & fixing of bearing plates with material (same as original) size more than 45kw up to 90kw as per part-b scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 93. providing & fixing of bearing plates with material (same as original) size more than 90kw up to 180kw as per part-b scope of work (total quantity 1 is equal to 1 nos. for two years). 94. providing and fixing of bearing locks (duly machined threaded & drilled) with material (same as original) size up to 15kw as per part-b scope of work (total quantity 1 is equal to 2 nos. for two years). price/qty 1 95. providing and fixing of bearing locks (duly machined threaded & drilled) with material (same as original) size more than 15kw up to 45kw as per part-b scope of work (total quantity 1 is equal to 2 nos. for two years). price/qty 1 96. providing and fixing of bearing locks (duly machined threaded & drilled) with material (same as original) size more than 45kw up to 90kw as per part-b scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 97. providing and fixing of bearing locks (duly machined threaded & drilled) with material (same as original) size more than 90kw to 180kw as per part-b scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 98. providing & fixing of foundation legs including machining, drilling & levelling etc. (material shall be in contractor scope) size up to 1.5 kw as per part-b scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 99. providing & fixing of foundation legs including machining, drilling & levelling etc. (material shall be in contractor scope) size more than 1.5kw up to 7.5 kw as per part-b scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 100. providing & fixing of foundation legs including machining, drilling & levelling etc. (material shall be in contractor scope) size more than 7.5kw up to 15kw as per part-b scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 101. providing & fixing of foundation legs including machining, drilling & levelling etc. (material shall be in contractor scope) size more than 15 up to 45kw as per part-b scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 102. dismantling and refitting without varnish and baking size up to 1.5 kw as per part-b scope of work (total quantity 1 is equal to 2 nos. for two years). price/qty 1 103. dismantling and refitting without varnish and baking size more than 1.5kw up to 7.5kw as per part-b scope of work (total quantity 1 is equal to 2 nos. for two years). price/qty 1 104. dismantling and refitting without varnish and baking size more than 7.5kw up to 15kw as per part-b scope of work (total quantity 1 is equal to 2 nos. for two years). price/qty 1 105. dismantling and refitting without varnish and baking size more than 15kw up to 45kw as per part-b scope of work (total quantity 1 is equal to 2 nos. for two years). price/qty 1 106. dismantling and refitting without varnish and baking size more than 45kw up to 90kw as per part-b scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 107. dismantling and refitting without varnish and baking size more than 90kw up to 180kw as per part-b scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 108. dismantling and refitting with varnish and baking size up to 1.5 kw as per part- b scope of work (total quantity 1 is equal to 5 nos. for two years). price/qty 1 109. dismantling and refitting with varnish and baking size more than 1.5kw up to 7.5kw as per part-b scope of work (total quantity 1 is equal to 5 nos. for two years). price/qty 1 110. dismantling and refitting with varnish and baking size more than 7.5kw up to 15kw as per part-b scope of work (total quantity 1 is equal to 3 nos. for two years). price/qty 1 111. dismantling and refitting with varnish and baking size more than 15kw up to 45kw as per part-b scope of work (total quantity 1 is equal to 3 nos. for two years). price/qty 1 112. dismantling and refitting with varnish and baking size more than 45kw up to 90kw as per part-b scope of work (total quantity 1 is equal to 2 nos. for two years). price/qty 1 113. dismantling and refitting with varnish and baking size more than 90kw up to 180kw as per part-b scope of work (total quantity 1 is equal to 3 nos. for two years). 114. providing & fixing of oil seal size less than 1.1 kw as per part-b scope of work (total quantity 1 is equal to 5 nos. for two years). price/qty 1 115. providing & fixing of oil seal size 1.1 kw to 2.2 kw as per part-b scope of work (total quantity 1 is equal to 5 nos. for two years). price/qty 1 116. providing & fixing of oil seal size more than 2.2 kw up to 5.5 kw as per part- b scope of work (total quantity 1 is equal to 5 nos. for two years). price/qty 1 117. providing & fixing of oil seal size more than 5.5 kw up to 15 kw as per part-b scope of work (total quantity 1 is equal to 5 nos. for two years). price/qty 1 118. providing & fixing of oil seal size more than 15kw up to 30kw as per part-b scope of work (total quantity 1 is equal to 5 nos. for two years). price/qty 1 119. providing & fixing of space heater size more than 30 up to 45kw as per part- b scope of work (total quantity 1 is equal to 2 nos. for two years). price/qty 1 120. providing & fixing of space heater size more than 45kw up to 90kw as per part-b scope of work (total quantity 1 is equal to 2 nos. for two years). price/qty 1 121. providing & fixing of space heater size more than 90kw up to 180kw as per part-b scope of work (total quantity 1 is equal to 2 nos. for two years). price/qty 1 122. providing of skf make bearing 6203 zz as per part-b scope of work (total quantity 1 is equal to 10 nos. for two years). price/qty 1 123. providing of skf make bearing 6204 zz as per part-b scope of work (total quantity 1 is equal to 10 nos. for two years). price/qty 1 124. providing of skf make bearing 6205 zz as per part-b scope of work (total quantity 1 is equal to 10 nos. for two years). price/qty 1 125. providing of skf make bearing 6206 zz as per part-b scope of work (total quantity 1 is equal to 10 nos. for two years). price/qty 1 126. providing of skf make bearing 6208 zz as per part-b scope of work (total quantity 1 is equal to 10 nos. for two years). price/qty 1 127. providing of skf make bearing 6209 zz as per part-b scope of work (total quantity 1 is equal to 10 nos. for two years). price/qty 1 128. providing of skf make bearing 6310 zz as per part-b scope of work (total quantity 1 is equal to 10 nos. for two years). price/qty 1 129. providing of skf make bearing 6312 as per part-b scope of work (total quantity 1 is equal to 10 nos. for two years). price/qty 1 130. providing of skf make bearing 6312 zz as per part-b scope of work (total quantity 1 is equal to 10 nos. for two years). price/qty 1 131. providing of skf make bearing 6313-c3 as per part-b scope of work (total quantity 1 is equal to 10 nos. for two years). price/qty 1 132. rewinding of three phase, 415 v, 50hz, motors size more than 75 kw up to 90 kw as per part-c scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 133. rewinding of three phase, 415 v, 50hz, motors size more than 90 kw up to 110 kw as per part-c scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 134. rewinding of three phase, 415 v , 50hz, motors size more than 110 kw up to 132 kw as per part-c scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 135. rewinding of three phase, 415 v, 50hz, motors size more than 132 kw up to 140 kw as per part-c scope of work (total quantity 1 is equal to 1 nos. for two years). price/qty 1 136. rewinding of three phase, 415 v, 50hz, windings motors size more than 140 kw up to 180 kw as per part-c scope of work (total quantity 1 is equal to total quantity : 1
View Original Notice/Document
Result Documents
Tender Documents
| Download | File Name | File Description |
|---|---|---|
| Download | ae566ed7-888a-49e4-bdf1-2cea9bbcd0d8 |
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results