BRR : 7826691
Click Here To View Tendering Authority. Aoc City/State :  Sonipat, Haryana
Tender Brief : Tender For Estimate for supply and fixing of PCC Tree guard at various locations in M.C Sonipat-- 1 [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] 2 [11.58]Providing and applying two coats white cement based putty of approved brand and manufacturer, over plastered surface and grinding the surface smooth with sand paper to get en even and smooth finish including cost and carriage of all material , labour charges, scaffolding, sundries etc. complete [Through Rate] 3 [11.68.3]Applying priming coat: 3. With ready mixed red oxide zinc chromate primer of appr... Read More
Tender Value
1,32,97,998
Contract Value
₹ 1,12,36,808
Saving / Difference
₹ 20,61,190 ▲
Submission Date
25-04-2025
Contract Date
19-08-2025
Completion Date
288 days
Participated Bidder List
15 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 1,26,33,097 L6
2 cnet-technologies Bid Analytics 1,26,34,427 L7
3 cnet-technologies Bid Analytics 1,30,32,037 L11
4 cnet-technologies Bid Analytics 1,25,13,415 L5
5 cnet-technologies Bid Analytics 1,12,36,808 L1
6 cnet-technologies Bid Analytics 1,36,21,138 L13
7 cnet-technologies Bid Analytics 1,52,92,696 L15
8 cnet-technologies Bid Analytics 1,39,62,896 L14
9 cnet-technologies Bid Analytics 1,26,51,714 L9
10 cnet-technologies Bid Analytics 1,35,91,882 L12
11 cnet-technologies Bid Analytics 1,19,66,867 L3
12 cnet-technologies Bid Analytics 1,28,99,057 L10
13 cnet-technologies Bid Analytics 1,26,45,065 L8
14 cnet-technologies Bid Analytics 1,24,16,339 L4
15 cnet-technologies Bid Analytics 1,14,17,660 L2
Work Detail
tender for estimate for supply and fixing of pcc tree guard at various locations in m.c sonipat-- 1 [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [through rate] 2 [11.58]providing and applying two coats white cement based putty of approved brand and manufacturer, over plastered surface and grinding the surface smooth with sand paper to get en even and smooth finish including cost and carriage of all material , labour charges, scaffolding, sundries etc. complete [through rate] 3 [11.68.3]applying priming coat: 3. with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works [through rate] 4 [11.96.1]finishing walls with premium acrylic smooth exterior paint with silicone additives of required shade: 1. new work (two or more coats applied @ 1.43 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) [through rate] 5 [11.97.3]finishing with deluxe multi surface paint system for interiors and exteriors using primer as per manufacturers specifications : 3. painting steel work with deluxe multi surface paint to give an even shade. two or more coat applied @ 0.90 litre/10 sqm over an under coat of primer applied @ 0.80 litre/10 sqm of approved brand and manufacture [through rate] 6 [13.28]structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. [through rate] 7 [17.13]granular sub-base (mix in place) construction of granular sub-base by providing material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with vibratory roller to achieve the desired density, complete as per technical clause 401 of mort&h technical specifications [through rate] 8 [4.14.1]earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. all kinds of soil. [through rate] 9 [6.14.1]providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-iii): 3 graded stone aggregate 20 mm nominal size) [through rate] 10 [6.15.1]reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zone-iii) : 3 graded stone aggregate 20 mm nominal size) [through rate] 11 [6.30.1]centering and shuttering including strutting, propping etc. and removal of form for 1. foundations, footings, bases of columns, etc. for mass concrete [through rate] 12 [6.30.5]centering and shuttering including strutting, propping etc. and removal of form for 5. lintels, beams, plinth beams, girders, bressumers and cantilevers [through rate] 13 [6.30.6]centering and shuttering including strutting, propping etc. and removal of form for 6. columns, pillars, piers, abutments, posts and struts [through rate] 14 [6.33.3]steel reinforcement for r.c.c. work, where not included in the complete rate of rcc, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level note: reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. cold twisted bars [through rate] 15 [7.21.2]brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 2. cement mortar 1:6 (1 cement : 6 coarse sand) [through rate]
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 6b114fca-1640-4894-a896-0ad24bde07b0
Download 705RATEAPPROVAL
Download boqcomparativechart
Download finance_517887
Download finsummary_517887
Download technical_517887
Download techsummary_517887
Download File Name File Description
Download 66049bb8-259c-464f-9572-ffc65cb37ae1 Tender Documents
Download BOQ_517887 Tender Documents
Download Tendernotice_1 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000
Similar Tenders Results
TenderDetail
Loading tenders