BRR : 7640738
Click Here To View Tendering Authority. Aoc City/State :  dhanbad, Jharkhand
Tender Brief : Tender For Repair And Maintenance Of Electro Mechanical Equipments At Karkend And Jharia Water Pumping Plant Under Jmada Dhanbad For The Year 2024-2025.-KARKEND TOWERWATERPUMPINGPLANT:- Cost towards disconnecting the electric connection, suctionand delivery pipe line connections, dismounting of 55 HP HSC Pump from baseplate, dismantling the pump at workshop,and doingcomplete repairing & overhaulling of 55KW HSC Pump, by cleaning, checking and changing of its damaged spares such as C.I. Impeller -1No.as per sample, Pump shaft SS-1No.,Shaft sleeve as per sample-2Nos., Gland bracket as persam... Read More
Tender Value
42,30,650
Contract Value
₹ 41,46,030.43
Saving / Difference
₹ 84,620 ▲
Submission Date
02-05-2025
Contract Date
24-07-2025
Completion Date
180 days
Participated Bidder List
2 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 41,46,030.43 L1
2 cnet-technologies Bid Analytics 42,30,643.3 L2
Work Detail
tender for repair and maintenance of electro mechanical equipments at karkend and jharia water pumping plant under jmada dhanbad for the year 2024-2025.-karkend towerwaterpumpingplant:- cost towards disconnecting the electric connection, suctionand delivery pipe line connections, dismounting of 55 hp hsc pump from baseplate, dismantling the pump at workshop,and doingcomplete repairing & overhaulling of 55kw hsc pump, by cleaning, checking and changing of its damaged spares such as c.i. impeller -1no.as per sample, pump shaft ss-1no.,shaft sleeve as per sample-2nos., gland bracket as persample-1no., bearing housing repairing work etcand doing assembly the same all completeand testing on full load with all labour, tools, tackles and fitter charges. (rateafter deducting the scrap materials) 2 cost towards dismantling and complete rewinding of 55 hp 3phase 1460 rpm 415 volt, 50c/ssquirrel cageinduction motor with s/f super enameled copper wire as required size, and insulating materials , packing paper , bamboo stick and cotton tape etc all complete & assembly the same and fitting on base plate including , heating , varnishing, with supplying and fitting of ball bearingand assembly the same etc all complete and testing on load . (rate after deducting the scrap materials and burnt wires). 3 cost towards dismantling and complete overhauling of 55hp, 3phase 1460 rpm 415 volt, 50c/ssquirrel cageinduction motor,including , heating , varnishing, with supplying and fitting of bearing as per sample and assembly the same etc all complete and testing on load. 4 cost towards repairing and overhauling ofmotor control panel with replacement of damage parts such as contactor set, over load relay, timer, ampere meter, voltmeter, phase indicatinglamps, lugs, dressing of electrical wires etc all complete and testing on load with all labour tools, tackles and technician charges. 5 [ii] jharia waterpumpingplant:-cost towards disconnecting the electric connection, suctionand delivery pipe line connections, dismounting of 120hp hsc pump from baseplate, dismantling the pump at workshop,and doingcomplete repairing & overhaulling of 125hphsc pump, by cleaning, checking and changing of its damaged spares such as c.i. impeller -1no.as per sample, pump shaft ss-1no.,shaft sleeve as per sample-2nos., gland bracket as persample-1no., bearing housing repairing work etcand doing assembly the same all completeand testing on full load with all labour, tools, tackles and fitter charges. (rateafter deducting the scrap materials) 6 cost towards disconnecting the electric connection, suctionand delivery pipe line connections, dismounting of 175hp hsc pump from baseplate, dismantling the pump at workshop,and doingcomplete repairing & overhaulling of 175hp hsc pump, by cleaning, checking and changing of its damaged spares such as c.i. impeller -1no.as per sample, pump shaft ss-1no.,shaft sleeve as per sample-2nos., gland bracket as persample-1no., bearing housing repairing work etcand doing assembly the same all completeand testing on full load with all labour, tools, tackles and fitter charges. (rateafter deducting the scrap materials) 7 cost towards disconnecting the electric connection, suctionand delivery pipe line connections, dismounting of 200 hp hsc pump from baseplate, dismantling the pump at workshop,and doingcomplete repairing & overhaulling of 200 hp hsc pump, by cleaning, checking and changing of its damaged spares such as c.i. impeller -1no.as per sample, pump shaft ss-1no.,shaft sleeve as per sample-2nos., gland bracket as persample-1no., bearing housing repairing work etcand doing assembly the same all completeand testing on full load with all labour, tools, tackles and fitter charges. (rateafter deducting the scrap materials) 8 cost towards dismantling and complete rewinding of 175 hp 3phase 1460 rpm 415 volt, 50c/ssquirrel cageinduction motor with s/f super enameled copper wire as required size, and insulating materials , packing paper , bamboo stick and cotton tape etc all complete & assembly the same and fitting on base plate including , heating , varnishing, with supplying and fitting of ball bearingand assembly the same etc all complete and testing on load . (rate after deducting the scrap materials and burnt wires). 9 cost towards dismantling and complete overhauling of 120hp, 3phase 1460 rpm 415 volt, 50c/ssquirrel cageinduction motor,including , heating , varnishing, with supplying and fitting of bearing as per sample and assembly the same etc all complete and testing on load. 10 cost towards dismantling and complete overhauling of 175 hp, 3phase 1460 rpm 415 volt, 50c/ssquirrel cageinduction motor,including , heating , varnishing, with supplying and fitting of bearing as per sample and assembly the same etc all complete and testing on load. 11 cost towards dismantling and complete overhauling of 200hp, 3phase 1460 rpm 415 volt, 50c/ssquirrel cageinduction motor,including , heating , varnishing, with supplying and fitting of bearing as per sample and assembly the same etc all complete and testing on load. 12 cost towards repairing and overhauling ofmotor control panel with replacement of damage parts such as contactor set, over load relay, timer, ampere meter, voltmeter, phase indicatinglamps, lugs, dressing of electrical wires etc all complete and testing on load with all labour tools, tackles and technician charges. 13 cost towords supplying and laying of 185 sq. mm. 1.1 kvgrade 3.5 core pvc insulated armoured aluminium cable with isi mark incuding cable souket fitting from transformer to main switch and main switch to panel board. (make-havells, poycab, gloster, kel, klj and any reputed isi mark.) 14 goods & services tax (g.s.t.) - 18% 15 labour cess - 1%
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download c769ce3a-9900-4e9a-975b-07224a0c1e26
Download AOC
Download boqcomparativechart
Download finsummary_134798
Download technical_134798
Download techsummary_134798
Download File Name File Description
Download Tendernotice_1 Tender Documents
Download 18a2c37f-177e-4fff-88e4-95190eb8fdbd Tender Documents
Download BOQ_134798 Tender Documents
Download Technical Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000
Similar Tenders Results
TenderDetail
Loading tenders