BRR : 7307535
Click Here To View Tendering Authority. Aoc City/State :  bulandshahr, Uttar Pradesh
Tender Brief : Tender For Construction Of V.R.B. At Km 5.900 Of Shakarpur Dy. For Mgc-Stage Iind. Lot-3 - Construction of V.R.B. 2 Earth workin foundation insoil (Loam,clay or sand ) i/c lift upto 1.50 M.and lead 30 M. including back filling watering and ramming of excavated earthinto the plinth with removal and disposal of surplus earth as directed by Engineer-in-charge up to 30 M. from the foundation trenches. 3 Laying CC 1:3:6 in Foundationusing Stone ballastincluding cost of all materials, labour, T&p, etc. required for proper completion of work. 4 Brick work with M-100 Bricks in 1:4 CM mortarincludi... Read More
Tender Value
18,82,000
Contract Value
₹ 13,61,104.5
Saving / Difference
₹ 5,20,896 ▲
Submission Date
01-03-2025
Contract Date
10-03-2025
Completion Date
90 days
Participated Bidder List
2 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 13,84,336.86 L1
2 cnet-technologies Bid Analytics 13,61,104.5 L1
Work Detail
tender for construction of v.r.b. at km 5.900 of shakarpur dy. for mgc-stage iind. lot-3 - construction of v.r.b. 2 earth workin foundation insoil (loam,clay or sand ) i/c lift upto 1.50 m.and lead 30 m. including back filling watering and ramming of excavated earthinto the plinth with removal and disposal of surplus earth as directed by engineer-in-charge up to 30 m. from the foundation trenches. 3 laying cc 1:3:6 in foundationusing stone ballastincluding cost of all materials, labour, t&p, etc. required for proper completion of work. 4 brick work with m-100 bricks in 1:4 cm mortarincluding cost of all materials, labour, t&p, etc. required for proper completion of work. 5 ordinary centering and suttering for r.c.c. work . 6 laying rcc 1:1.5:3 using stone gritincluding cost of all materials, labour, t&p, etc. required for proper completion of work. 7 laying cc 1:1.5:3 using stone gritincluding cost of all materials, labour, t&p, etc. required for proper completion of work. 8 steel reinforcement for rcc work i/ccost of steel, bending,binding,cutting and placing in proper position etc. required for proper completion of work. 9 p/f 100 mm dia p.v.c.pipe in proper position for drainage spout i/c all material labour t&p etc.required for proper completion of work. 10 struck deep cement pointing in 1:2 cm on surface including cost of all materials, labour, t&p, etc. required for proper completion of work. 11 supply and laying of tarfelt including cost of all materials, labour, t&p, etc. required for proper completion of work. 12 supply and laying of supply and laying 12mm thickpremoulded joint filler board including cost of all materials, labour, t&p, etc. required for proper completion of work.
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download ecaf84cd-096d-455c-bdd4-062dae708d98
Download boqcomparativechart
Download finance_1812466
Download finsummary_1812466
Download l3
Download technical_1812466
Download techsummary_1812466
Download File Name File Description
Download 7741fdbf-2025-44ef-8855-a5f8082c68ad Tender Documents
Download BOQ_1812466 Tender Documents
Download Tendernotice_1 Tender Documents
Download Tendernotice_2 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000