BRR : 7086661
Click Here To View Tendering Authority. Aoc City/State :  mettupalayam, Tamil Nadu
Tender Brief : Construction Of Fire Protection Wall In Between Pt I And Iii And Ii And Iii In Mettupalayam 11022 Kv Ss , A) In Between Power Transformer I & Iii Dismantling And Removing The Existing Plain Cement Concrete Including Cost Of Labour Charges, Lead, Lift, Etc., Complete As Per Standard Specification. , Earth Work Excavation In Hard Gravelly Soil, Stiff Black Cotton Soil, Hard Red Earth, Shales, Murram, Gravel, Stoney Earth Mixed With Small Sized Boulders Etc., Complete As Per Standard Specification. , Filling With M.Sand For Foundation Includingcost Of Sand, Filling Charges, With All Leads And Li... Read More
Tender Value
Ref. Document
Contract Value
₹ 5,74,389
Submission Date
12-02-2025
Contract Date
25-03-2025
Completion Date
270 days
Participated Bidder List
3 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics
2 cnet-technologies Bid Analytics 7,16,378 L2
3 cnet-technologies Bid Analytics 5,74,389 L1
Work Detail
construction of fire protection wall in between pt i and iii and ii and iii in mettupalayam 11022 kv ss , a) in between power transformer i & iii dismantling and removing the existing plain cement concrete including cost of labour charges, lead, lift, etc., complete as per standard specification. , earth work excavation in hard gravelly soil, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth mixed with small sized boulders etc., complete as per standard specification. , filling with m.sand for foundation includingcost of sand, filling charges, with all leads and lifts, watering, consolidation etc., complete. , plain cement concrete in cc 1:3:6, using 20mm hbg metal, for foundation including cost ofall materials, labour charges including consolidation, curing, all leads, lifts etc., complete. , reinforced cement concrete 1:1.5:3 mix using 12mm to 20mm hbg downgraded metal machine crushed for raft foundation including cost all materials, labour, curing, lead, lift, cost of shuttering etc., complete but excluding cost of steel reinforcement. , reinforced cement concrete 1:1.5:3 mix using 12mm to 20mm hbg downgraded metal machine crushed below ground level including cost ofall materials, labour, curing, lead, lift, cost of shuttering etc., complete but excluding cost of steel reinforcement. , providing steel reinforcement with ms/rts rods of reputed approved make for reinforced concrete works, including cost of steel ms/rts rods, binding wire, minor t&ps labour charges for cutting, straightening bending as per type design drawing, placing aligning and tying properly with all leads and lift etc., complete as per standard specification. , refilling with excavated earth other than sand with an initial head load of 100m and depositing the earth as directed by the officer in charge, well rammed, watered and consolidation etc., complying with standard specification. , brick work in cm 1:5 using chamber burntclass ii bricks/fly ash bricks, including cost of all materials, labour, scaffolding, curing, all leads and lifts etc., complete. , plastering in cm 1:5, 12 mm thickincluding cost of all materials, scaffolding charges,labour charges, lead, lift etc., complete. , painting two coats with exterior emulsion paint over one coat ofwhite cement of best qualityincluding cost of all materials, scaffolding charges, labour, lead, lift etc., complete. , disposal of excess of surplus earth away in low lying area with a head load lead 100m and lorry lead of 5 km including spreading, levelling, labour, leads, lifts etc., complete. , b) in between power transformer ii & iii dismantling and removing the existing plain cement concrete including cost of labour charges, lead, lift, etc., complete as per standard specification. , earth work excavation in hard gravelly soil, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth mixed with small sized boulders etc., complete as per standard specification. , filling with m.sand for foundation includingcost of sand, filling charges, with all leads and lifts, watering, consolidation etc., complete. , plain cement concrete in cc 1:3:6, using 20mm hbg metal, for foundation including cost ofall materials, labour charges including consolidation, curing, all leads, lifts etc., complete. , reinforced cement concrete 1:1.5:3 mix using 12mm to 20mm hbg downgraded metal machine crushed for raft foundation including cost all materials, labour, curing, lead, lift, cost of shuttering etc., complete but excluding cost of steel reinforcement. , reinforced cement concrete 1:1.5:3 mix using 12mm to 20mm hbg downgraded metal machine crushed including cost ofall materials, labour, curing, lead, lift, cost of shuttering etc., complete but excluding cost of steel reinforcement. , providing steel reinforcement with ms/rts rods of reputed approved make for reinforced concrete works, including cost of steel ms/rts rods, binding wire, minor t&ps labour charges for cutting, straightening bending as per type design drawing, placing aligning and tying properly with all leads and lift etc., complete as per standard specification. , refilling with excavated earth other than sand with an initial head load of 100m and depositing the earth as directed by the officer in charge, well rammed, watered and consolidation etc., complying with standard specification. , brick work in cm 1:5 using chamber burntclass ii bricks/fly ash bricks, including cost of all materials, labour, scaffolding, curing, all leads and lifts etc., complete. , plastering in cm 1:5, 12 mm thickincluding cost of all materials, scaffolding charges,labour charges, lead, lift etc., complete. , painting two coats with exterior emulsion paint over one coat ofwhite cement of best qualityincluding cost of all materials, scaffolding charges, labour, lead, lift etc., complete. , disposal of excess of surplus earth away in low lying area with a head load lead 100m and lorry lead of 5 km including spreading, levelling, labour, leads, lifts etc., complete. , sgst to be quoted in percentage (value alone)ex. 9%, it should be entered as 9 only , cgst to be quoted in percentage (value alone) ex. 9%, it should be entered as 9 only , inter-state gst @18% for other than tamil nadu supplier. if the contractor is within tamil nadu may be quoted as 0 only
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 4be81798-33c0-4a0d-9fc1-d70b615dd645
Download boqcomparativechart
Download finsummary_620626
Download techsummary_620626
Download workaward
Download File Name File Description
Download BOQ_620626 Tender Documents
Download Tendernotice_1 Tender Documents
Download 6e0f9c63-b4a8-4254-8a51-8cda09dd59bd Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000
Similar Tenders Results
TenderDetail
Loading tenders