BRR : 6349261
Tender Brief : Bids Are Invited For Custom Bid For Services - Temp11 Degutting Of Equipment 1.00 Main Engine 101 Disconnecting All The System Control Cable From Engine. 1.02 Disconnecting All The System Pipelines From Engine 1.03 Positive Banking Of All Opening On The Engines With Blanks Of Appropriate Size 1.04 Degutting Of Exhaust System Of Main Engines From The Ship And Shitting Outside 1.05 Welding Of Suitable Hooks And Platform For Shifting Of Engines 1.06 Decouping Of The Main Engines From The Gear Boxes And The Coupling To Be Handed Over To Ship Staff For Survey / Preservation 1.07 Re... Read More
Tender Value
₹
Ref. Document
Contract Value
₹ 17,77,420
Submission Date
11-05-2023
Contract Date
Ref. Document
Completion Date
Ref. Document
Participated Bidder List
6 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | |||||
| 3 | cnet-technologies | Bid Analytics | |||||
| 4 | cnet-technologies | Bid Analytics | 17,77,420 | L1 | |||
| 5 | cnet-technologies | Bid Analytics | 17,80,000 | L2 | |||
| 6 | cnet-technologies | Bid Analytics | 25,25,014.8 | L3 |
Work Detail
bids are invited for custom bid for services - temp11 degutting of equipment 1.00 main engine 101 disconnecting all the system control cable from engine. 1.02 disconnecting all the system pipelines from engine 1.03 positive banking of all opening on the engines with blanks of appropriate size 1.04 degutting of exhaust system of main engines from the ship and shitting outside 1.05 welding of suitable hooks and platform for shifting of engines 1.06 decouping of the main engines from the gear boxes and the coupling to be handed over to ship staff for survey / preservation 1.07 removal of disturbing pipelines for degutting of main engine, up to any dia. 1.08 degutting of funnel and engine room saft patch to facilitate shifting out to engines 1.09 breaking of choke fast and removing engine from the foundation alongwith sv mounts 110 manufacturing of suitable stand for placement of main engine 1.11 shifting of the main engines from engine room to jetty ( crane assistance will be provided by yard ) 1.12 removal of sv mounts from the engines and securing engines on the stands with phosphated ms fastemers of appropriate dimensions 1.18 diesel alternator-04 ( in merj 1.19 decoupling of engine & alternator 1.20 disconnecting / degutting all the da engines system pipelines and control cables from the prime movers. 121 disconnecting control power cables from alternator 122 disconnection of all system pipelines from two prime movers. 1.23 degutting of diesel engine. 1.24 removal of disturbing pipelines for degutting of main engine, up to any dia 1.25 in side of engine room track manufacturing for shifting from diesel engine. 1.26 removal & refitment of sv mount from engine foundation 1.27 positive blanking of all openings on two movers 140 diesel alternator-fwd da 1.41 degutting and shifting out of exhaust system 1.42 disconnecting all the system pipelines and controls cables from the prime movers 143 disconnection of all sytem pipelines from two prime movers 1.44 positive blanking of all openings on two movers 1.45 blanking of ship side on removal exhaust pipe 1.46 manufacturing suitable stands for placement of prime movers and alternators ( two each ) ( material will be supplied by yard ) 1.47 removing prime movers and alternators from foundation and shifting to near the soft patch 1.48 shipping out of prime movers and alternators from ship to jetty and placement on stands ( crane assistance will be provided by yard ) 149 loading and unloading assistance to be provided for ship for trans-shipment of these equipmnets to nsd ( pbr ) for survey ( crane and tractor-trolley will be provided by yard. however suitable slings are to be arranged by the contractor ) 1.50 degutting of control cables in engine room to the mcr along with pressure and temperature transducers, gauges and indication lamps disconnection and degutting of local control panels from the engine room handing over to ss on etty 1.51 1.52 misc degutting not mentioned above, which comes in way to undertake above works. 1.53 degutting and regutting of funnel and engine room soft patch to facilitate shifting out of engines 1.54 post removal of fitment of soft patch and securing the deck
View Original Notice/Document
Result Documents
Tender Documents
| Download | File Name | File Description |
|---|---|---|
| Download | 1323c311-c713-48ca-87a8-af2b23829c24 |
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results