BRR : 5720355
Click Here To View Tendering Authority. Aoc City/State :  PATAN, Gujarat
Tender Brief : Bids Are Invited For Mandap And Elecrical Items For Election Mandap ( With Swing ) Mandap ( Without Swing ) Mandap Waterproof ( Without Swing ) Mandap Side Wall Temporary Wooden Ramp At Polling Station ( 1:12 ) ( Width At Least 3 Feet ) Work Of Preparing 100 Meter Boundary With Lime At Polling Station ( 1220 Polling Stations ) . Stage And Steps ( Including Carpet ) ( For 1 Day ) Stage And Steps ( Including Carpet ) ( For 2 To 6 Days ) Back Stage Cloth Curtain ( Blue Color / White ) ( For 1 Day ) Red Carpet ( In Case Of Model Polling Stations Only ) ( For 1... Read More
Tender Value
Ref. Document
Contract Value
₹ 60,00,008.3
Submission Date
02-03-2024
Contract Date
Ref. Document
Completion Date
Ref. Document
Participated Bidder List
6 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics
2 cnet-technologies Bid Analytics
3 cnet-technologies Bid Analytics
4 cnet-technologies Bid Analytics 60,00,008.3 L1
5 cnet-technologies Bid Analytics 60,10,252 L2
6 cnet-technologies Bid Analytics 83,84,919 L3
Work Detail
bids are invited for mandap and elecrical items for election mandap ( with swing ) mandap ( without swing ) mandap waterproof ( without swing ) mandap side wall temporary wooden ramp at polling station ( 1:12 ) ( width at least 3 feet ) work of preparing 100 meter boundary with lime at polling station ( 1220 polling stations ) . stage and steps ( including carpet ) ( for 1 day ) stage and steps ( including carpet ) ( for 2 to 6 days ) back stage cloth curtain ( blue color / white ) ( for 1 day ) red carpet ( in case of model polling stations only ) ( for 1 day ) green flooring ( for 30 to 45 days ) quilt ( for 1 day ) sheets ( for 1 day ) blankets ( for 1 day ) shetaranji ( for 1 day ) mattresses ( for 1 day ) pillow ( for 1 day ) decorated entrance ( for model polling station only ) ( for 1 day ) decorative gate ( for model polling station only ) ( for 2 days ) decoration with artificial flowers ( for 1 day ) decoration with artificial flowers ( for r days ) wooden barricading ( 6 feet height ) ( counting centre ) ( for 1 day ) wooden barricading ( 6 feet height ) ( counting centre ) ( for r days ) wooden barricading ( 6 feet height ) ( counting center ) ( for 30 to 45 days ) iron pipe barricading ( 6 feet height ) ( for 1 day ) iron pipe barricading ( 6 feet height ) ( for r days ) iron pipe barricading ( 6 feet height ) ( for 30 to 45 days ) pvc ( plastic ) chair ( for 30 to 45 days ) cushioned chair ( model ps only ) ( iron / wooden / pvc ) ( for 1 day ) cushioned chair ( for training ) ( iron / wooden / pvc ) ( for r day ) cushioned chair ( for observer ) ( iron / wooden / pvc ) revolving chair ( for 3 to 6 days ) tipoi ( standard size ) ( for 1 day ) table 3 x 2 ( without table cloth ) ( for 1 day ) 4 x 2 feet table ( with table cloth ) ( for 3 to 45 days ) 1 seater sofa ( for 1 day ) 2 seater sofa ( for 1 day ) 3 seater sofa ( for 1 day ) wooden partition ( for 1 day ) wooden partition ( for 2 days ) wooden partition ( for 3 to 45 days ) partition of galvanized sheet ( with cloth ) ( for 1 day ) partition of galvanized sheet ( with cloth ) ( for 2 days ) partition of galvanized sheet ( with cloth ) ( for 3 to 45 days ) galvanized iron grating at counting center ( for 1 day ) led tubelight ( rar watt ) ( for 1 day ) led tubelight ( rar watt ) ( for r day ) led tubelight ( rar watt ) ( for 30 to 45 days ) led tubelight ( ror watt fitting with holder wire ) ( for 1 day ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) led tubelight ( ror watt fitting with holder wire ) ( for r day ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) led tubelight ( ror watt fitting with holder wire ) ( for 30 to 45 days ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) flood light 100 watt with fitting holder wire ( for 1 day ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) flood light 100 watt with fitting holder wire ( for r day ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) flood light 100 watt with fitting holder wire ( for 30 to 45 days ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) halogen fitting 500 watt ( for 1 day ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) halogen fitting 500 watt ( for 30 to 45 days ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) 1000 watt halogen fitting with holder wire ( outdoor type ) ( for 1 day ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) 1000 watt halogen fitting with holder wire ( outdoor type ) ( for r days ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) 1000 watt halogen fitting with holder wire ( outdoor type ) ( for 30 to 45 days ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) sound system ( for 1 day ) extra speaker-1000 watt ( for 2 to 45 days ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) extra amplifier 50 watts ( for 1 day ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) extra amplifier 50 watt ( for 2 to 45 days ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) extra cordless microphone ( for 1 day ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) extra collar / button mic ( for 1 day ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) microphone ( for 1 day ) pedal stand fan ceiling fan heavy duty air circulator ( for 2 to 6 days ) ( jumbo cooler ) ( 60 ltr ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) temporary plug point ( 15 amp ) ( for 1 day ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) temporary plug point ( 15 amp ) ( for 2 to 45 days ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) distribution board ( three phase 440 watt ) 4-6 way ( for 1 day ) distribution board ( three phase 440 watt ) 8-12 way ( for 2 to 45 days ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) generator set ( 125 kva ) ( for 1 day ) ( with fuel, fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) generator set ( 125 kva ) ( for r day ) ( with fuel, fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) generator set ( 125 kva ) ( for 3 to 45 days ) ( with fuel, fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) generator set ( 250 kva ) ( for 1 day ) poles for lights ( 1 to 15 feet high ) ( for 1 day ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) poles for lights ( 1 to 15 feet high ) ( for 2 to 45 days ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) dp switch 16 / 32 amp ( for 1 day ) ( mcb / icdp as per site requirement ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) dp switch 16 / 32 amp ( for 2 to 45 days ) ( mcb / icdp as per site requirement ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) tp switch 16 / 3r amp ( for 1 day ) ( mcb / ictp as per site requirement ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) tp switch 16 / 32 amp ( for 2 to 45 days ) 63 to 100 amp busbar up to 1 meter ( for 2 to 45 days ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) 200 amp busbar up to 1 meter ( for 1 day ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) 200 amp busbar up to 1 meter ( for 2 to 45 days ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) change over switch 4 pole 63 amp ( for 1 day ) ( with fitting, holder, wiring and cabling and other necessary item ) ( from source point to distribution point ) change over switch 4 pole 63 amp ( for 2 to 45 days ) change over switch 4 pole 200-300 ampere ( for 2 to 45 days ) section peeler 75 x 60 x 45 ( for 1 day ) elcb switch three phase 100 amp 4 pole ( for 2 to 45 days ) 3.5 kv ups with 4 hours backup ( for 2 to 45 days ) split ac 1.5 ton ( for 1 day ) tower ac. 4 tonnes ( for 1 day ) ductoable ac unit ( 5 to 6 ton ) total quantity : 417191
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download ec9ffdfd-875a-49ac-9560-cc0c82aa5f27
Download File Name File Description
Download 6146807_Boq_3 Tender Documents
Download 6d785737-58a5-4a1b-97fb-5a35642287e5 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000
Similar Tenders Results
TenderDetail
Loading tenders