Tender Brief : Renewal Of Rampur Mathiya Jogipur Link Road - Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam G-3 specification including spreading in uniform thickness, hand packing, rolling with threewheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.for filling of pot holes and depression 2 Providing and applying tack coat with Bitumen VG-10 using... Read More
Tender Value
19,73,000
Contract Value
₹ 14,20,091.99
Saving / Difference
₹ 5,52,908 ▲
Submission Date
06-12-2024
Contract Date
23-12-2024
Completion Date
90 days
Participated Bidder List
4 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 14,69,194 L2
2 cnet-technologies Bid Analytics 14,20,091.99 L1
3 cnet-technologies Bid Analytics 15,99,681.63 L4
4 cnet-technologies Bid Analytics 15,57,345.64 L3
Work Detail
renewal of rampur mathiya jogipur link road - providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam g-3 specification including spreading in uniform thickness, hand packing, rolling with threewheel 80-100 kn static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause 405.for filling of pot holes and depression 2 providing and applying tack coat with bitumen vg-10 using emulsion distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503.(by manual means) 3 providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen (vg-10) to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kn static roller capacity, finished to required level and gradesas per technical specification clause 508..(by manual means) 4 providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using type c,as per technical specification clause 510..(by manual means) 5 the routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and endsafter five years.(including cost of material t&p labour but excluding gst) for 1st year maintenance cost @ 0.0% 6 the routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years.(including cost of material t&p labour but excluding gst) for 2nd year maintenance cost @1.5% 7 the routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and endsafter five years.(including cost of material t&p labour but excluding gst) for 3rd year maintenance cost @ 3.0% 8 the routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and endsafter five years.(including cost of material t&p labour but excluding gst) for 4th year maintenance cost @ 4.5% 9 the routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and endsafter five years.(including cost of material t&p labour but excluding gst) for 5th year maintenance cost @ 6.0%
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 8d897914-cb47-42ea-86a2-cec3635b463a
Download 28
Download boqcomparativechart
Download finance_1717898
Download finsummary_1717898
Download technical_1717898
Download techsummary_1717898
Download File Name File Description
Download 8cbd600d-22ff-4abc-8b8e-62300f91c93d Tender Documents
Download BOQ_1717898 Tender Documents
Download Tendernotice_1 Tender Documents
Download Tendernotice_2 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000
Similar Tenders Results
TenderDetail
Loading tenders