BRR : 5531000
Click Here To View Tendering Authority. Aoc City/State :  Meerut, Uttar Pradesh
Tender Brief : Reconstruction of VRB at KM. - 23.665 of Pooth Dy.(Lot-2) - Dismantling R.B. or R.C.C. work including stacking of material within 60 Meters. 2 Dismantling bricks or stone masonry in lime or cement including stacking of material within 60 Meters. 3 Earth work in foundation in dry ordinary soil (loam clay or sand) including lift upto 1.50M and lead upto 30M and including filling, watering and ramming excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Eng... Read More
Tender Value
₹ 20,50,000
Contract Value
₹ 16,28,743.5
Saving / Difference
₹ 4,21,257 ▲
Submission Date
19-11-2024
Contract Date
24-12-2024
Completion Date
90 days
Participated Bidder List
8 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics
2 cnet-technologies Bid Analytics 16,45,077.5 L4
3 cnet-technologies Bid Analytics 16,34,161.8 L2
4 cnet-technologies Bid Analytics 16,39,751.75 L3
5 cnet-technologies Bid Analytics
6 cnet-technologies Bid Analytics 16,28,743.5 L1
7 cnet-technologies Bid Analytics 17,83,426.55 L5
8 cnet-technologies Bid Analytics 19,15,429 L6
Work Detail
reconstruction of vrb at km. - 23.665 of pooth dy.(lot-2) - dismantling r.b. or r.c.c. work including stacking of material within 60 meters. 2 dismantling bricks or stone masonry in lime or cement including stacking of material within 60 meters. 3 earth work in foundation in dry ordinary soil (loam clay or sand) including lift upto 1.50m and lead upto 30m and including filling, watering and ramming excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the engineer-in-charge upto a distance of 30m from the foundation trenches. 4 centering and shuttering in straight portion of c.c.pier and abutment. 5 providing & laying c.c. 1:3:6 with cement, coarse sand & aggregate (22.50-45.00)mmi/c all cost of material, labour t&p etc. 6 providing & laying 1st class (m-150) brick work with 1:4 cement mortar using cement and coarse snad including cost of all material, t&p & labours 7 centering and shuttering in straight portion of r.c.c.slab and parapat. 8 supplying and laying one layer of tar felt i.s.i. marked over roof as per direction of the engineer-in-charge including necessary overlep giving a coat of approaved mastic paint on the bottom and top of tar felt spreading of necessary quality of approved coarse sand or small bajri and including supply of all materials, labour, tools and plants etc. required for proper completion of work. 9 providing and fixing p.v.c. pipe 75mm dia & 6kg./cm sq. i.s.i. mark including all cost of materials, t&p and labour etc. 10 providing & fixing steel reinforcement including cost of steel, binding wire, bending, binding welding, cutting, placing in proper position i/c all cost of material, labour, t&p 11 providing & laying r.c.c. 1:1.5:3 with cement, coarse sand & aggregate (25mm to 10mm) i/c all cost of material, labour t&p etc complete and also excluding centering and shuttering and reinforcement 12 providing & laying wearing coatc.c. 1:1:2 with cement, coarse sand & aggregate (25mm to 10mm) i/c all cost of material, labour t&p etc complete . 13 providing cement pointing (struck deep) on brick masonary in 1:2 cement mortar including cost of all material, t&p and labour . 14 earth work for making diversion & bundhby power transported earth with a lead beyond 200 mand upto 1.00 km . i/c excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty will be applicable from time to time on govt. orders. 15 rcc 1200 mm dia hume pipe np-3 (s&s) i.s.i. mark including loading, unloading, and shifting. 16 providing and laying over burnt brick on edge soiling (kharanja) including cost of all material, t&p and labour. 17 finishing wall with weatherpaint of approved make and quality on new work with two coat to give an even shade including supply of all materials, labour,t&p etc. complete. 18 painting letters including cost of material for writing chainage on v.r.b. including all cost of materials, t&p and labour etc. 19 earth work in removing diversion/bandha.
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 0d55c098-01cf-4d10-adee-25f77df1fe7b
Download 23.665Pooth
Download boqcomparativechart
Download finsummary_1704902
Download technical_1704902
Download techsummary_1704902
Download File Name File Description
Download Tendernotice_2 Tender Documents
Download Tendernotice_1 Tender Documents
Download BOQ_1704902 Tender Documents
Download 721a9fdf-7f7c-4fca-8489-1351a6d610ab Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000