BRR : 4741386
Click Here To View Tendering Authority. Aoc City/State :  Meerut, Uttar Pradesh
Tender Brief : Supply, Soil Investigation, Design, Supply Of All Materials, Labour, T&P Etc. Required For Construction, Erection, Completion, Testing And Commissioning Of Water Supply Works Such As Rcc Oht, Rising Main, Distribution System, Tube Wells, Pump House, Staff Quarter, Boundry Wall And Site Development Works Etc. And Other Appurtenant Works Including Scada And Automation As Per Specifications In Tender Document For Harra Water Supply Re-Organization Scheme. The Scope Of Work Also Includes Trial Run Of 03 Months And Defect Liability Period Of 12 Months For Civil Works And 24 Months For... Read More
Tender Value
12,44,07,000
Contract Value
₹ 8,88,26,634.35
Saving / Difference
₹ 3,55,80,366 ▲
Submission Date
28-08-2023
Contract Date
23-02-2024
Completion Date
540 days
Participated Bidder List
7 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 9,75,84,890.73 L2
2 cnet-technologies Bid Analytics
3 cnet-technologies Bid Analytics
4 cnet-technologies Bid Analytics 8,88,26,634.35 L1
5 cnet-technologies Bid Analytics 9,79,70,552.59 L3
6 cnet-technologies Bid Analytics 10,25,98,494.88 L4
7 cnet-technologies Bid Analytics 10,80,72,405.12 L5
Work Detail
supply, soil investigation, design, supply of all materials, labour, t&p etc. required for construction, erection, completion, testing and commissioning of water supply works such as rcc oht, rising main, distribution system, tube wells, pump house, staff quarter, boundry wall and site development works etc. and other appurtenant works including scada and automation as per specifications in tender document for harra water supply re-organization scheme. the scope of work also includes trial run of 03 months and defect liability period of 12 months for civil works and 24 months for e / m works after completion of successful trial run. all completed and commissioned work under harra water supply re-organization scheme shall be handed over to harra nagar panchayat after 03 months successful trial run period
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download dc029f6e-4cba-4a89-9a03-acf0429ea26f
Download boqcomparativechart
Download finance_1378108
Download finsummary_1378108
Download ha
Download technical_1378108
Download techsummary_1378108
Download File Name File Description
Download a720c0f5-5650-43b8-ac61-6232b2f0620e Tender Documents
Download BOQ_1378108 Tender Documents
Download harraPDF Tender Documents
Download Tendernotice_1 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000
Similar Tenders Results
TenderDetail
Loading tenders