BRR : 4184670
Tender Brief : Bids Are Invited For Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Removal of back pull out assembly and installation of spare Back Pull out assembly of Pump for details refer BOQ item No 1 in SOW and 01 quantity is equ.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Decoupling Alignment and coupling of pump and motor having motor rating up to 60 KWe for details refer BOQ item No 2 in SOW and 01 quantity is equal to .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (... Read More
Tender Value
₹
54,62,451
Contract Value
₹ 46,38,000
Saving / Difference
₹ 8,24,451
▲
Submission Date
31-07-2024
Contract Date
Ref. Document
Completion Date
Ref. Document
Participated Bidder List
7 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | |||||
| 3 | cnet-technologies | Bid Analytics | |||||
| 4 | cnet-technologies | Bid Analytics | |||||
| 5 | cnet-technologies | Bid Analytics | |||||
| 6 | cnet-technologies | Bid Analytics | 46,38,000 | L1 | |||
| 7 | cnet-technologies | Bid Analytics | 54,57,000 | L2 |
Work Detail
bids are invited for repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; removal of back pull out assembly and installation of spare back pull out assembly of pump for details refer boq item no 1 in sow and 01 quantity is equ.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; decoupling alignment and coupling of pump and motor having motor rating up to 60 kwe for details refer boq item no 2 in sow and 01 quantity is equal to .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; overhauling of motor of rating from 30 kwe to 60 kwe for details refer boq item no 3 in sow and 01 quantity is equal to 1 nos; as per sow and atc , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; overhauling of manual operated valve .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; maintenance of actuator of control valve having diaphragm for details refer boq item no 5 in sow and 01 quantity is equal to 4 nos; as per sow and atc , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; primary circulating pump dismantling maintenance assembly test run for details refer boq item no 6 in sow and 01 quantity is equal to 1 nos; as per sow.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; opening and box up of shutdown cooling heat exchanger moderator heat exchanger for details refer boq item no 7 in sow and 01 quantity is equal to 2 nos.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; opening and box up of both primary sides of one steam generator for isi for details refer boq item no 8 in sow and 01 quantity is equal to 1 nos; as per.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; removal and installation of secondary side handhole covers of steam generator for isi water jet cleaning for details refer boq item no 9 in sow and 01 .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; primary circulating pump thrust bearing overhauling for details refer boq item no 10 in sow and 01 quantity is equal to 1 nos; as per sow and atc , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; preventive maintenance checks of primary circulating pump pcp and its motorfor details refer boq item no 11 in sow and 01 quantity is equal to 2 nos; as.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; overhauling of electrical actuator operated piston type air actuator operated valve for details refer boq item no12 in sow and 01 quantity is equal to 8.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; guide nut inspection of emergency core cooling system shut down cooling size 8 inch to 12 inchfor details refer boq item no 13 in sow and 01 quantity i.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; preventive maintenance checks of emergency core cooling system shut down cooling for details refer boq item no 14 in sow and 01 quantity is equal to 16.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; overhauling of control valve with valve size up to 6 inches for details refer boq item no 15 in sow and 01 quantity is equal to 4 nos; as per sow and at.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; overhauling of motor with electrical rating from 65 kwe to 400 kwe for details refer boq item no 16 in sow and 01 quantity is equal to 1 nos; as per sow.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; preventive maintenance checks of primary pressurizing pumpfor details refer boq item no 17 in sow and 01 quantity is equal to 1 nos; as per sow and atc , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; replacement of door seals of reactor building main air lock equipment doorfor details refer boq item no 18 in sow and 01 quantity is equal to 3 nos; as .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; moderator pump replacement for details refer boq item no 19 in sow and 01 quantity is equal to 1 nos; as per sow and atc , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; preventive maintenance checks of manual bellow sealed valvefor details refer boq item no 20 in sow and 01 quantity is equal to 50 nos; as per sow and at.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; diaphragm replacement of diaphragm valve for details refer boq item no 21 in sow and 01 quantity is equal to 80 nos; as per sow and atc , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; replacement or cleaning of strainer filter for details refer boq item no 22 in sow and 01 quantity is equal to 25 inch dia; as per sow and atc , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; replacement of relief valve for details refer boq item no 23 in sow and 01 quantity is equal to 8 nos; as per sow and atc , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; flange gasket replacement and tightening for details refer boq item no 24 in sow and 01 quantity is equal to 80 inch dia; as per sow and atc , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; flange threaded joint tightening for details refer boq item no 25 in sow and 01 quantity is equal to 40 inch dia; as per sow and atc , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; removal of snubber for testing and installation after testing for details refer boq item no 26 in sow and 01 quantity is equal to 14 nos; as per sow and.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; replacement maintenance of primary circulating pumps motor having rating 2800 kwfor details refer boq item no 27 in sow and 01 quantity is equal to 1 n.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; overhauling of spare back pull out assembly of oil supply unit for details refer boq item no 28 in sow and 01 quantity is equal to 3 nos; as per sow and.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; replacement of lobe type blower for details refer boq item no 29 in sow and 01 quantity is equal to 2 nos; as per sow and atc , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; feeder gap measurementfor details refer boq item no 30 in sow and 01 quantity is equal to 25 nos; as per sow and atc , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; manual axial creep measurement adjustment for details refer boq item no 31 in sow and 01 quantity is equal to 50 nos; as per sow and atc , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; removal and installation of zig saw panel for details refer boq item no 32 in sow and 01 quantity is equal to 250 nos; as per sow and atc , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; removal and installation of step panel insulation panel for details refer boq item no 33 in sow and 01 quantity is equal to 6 nos; as per sow and atc , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; coolant channel repositioningfor details refer boq item no 34 in sow and 01 quantity is equal to 2 nos; as per sow and atc , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; pss drive lower chamber o ring replacement for details refer boq item no 35 in sow and 01 quantity is equal to 16 nos; as per sow and atc , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; pss drive upper chamber replacement for details refer boq item no 36 in sow and 01 quantity is equal to 4 nos; as per sow and atc , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; mock up and preparatory activities for cobalt element replacement job for details refer boq item no 37 in sow and 01 quantity is equal to 1 nos; as per .. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; adjuster rod element replacement in reactivity mechanism drivesfor details refer boq item no 38 in sow and 01 quantity is equal to 6 nos; as per sow and.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; replacement of malealvacuum pump or vacuum mopping pump for details refer boq item no 39 in sow and 01 quantity is equal to 2 nos; as per sow and atc , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; eccs plate type heat exchanger maintenance for details refer boq item no 40 in sow and 01 quantity is equal to 1 nos; as per sow and atc total quantity :
View Original Notice/Document
Result Documents
Tender Documents
| Download | File Name | File Description |
|---|---|---|
| Download | 571f9fc6-9183-4adc-a8a9-38d0eda570f5 |
| Download | File Name | File Description |
|---|---|---|
| Download | 18af1d8b-deb5-4673-b16e-7cda1f59899b | Tender Documents |
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000