BRR : 34616
Tender Brief : Supply Of Material Pot Holes And Patch Repair ( Sh / Mdr / Odr Roads ) Year 2022-23 In Block-Kunda.-2 Collection Of Granular Sub Base ( Shankargarh ) Including Cost Of Material, Cartage, Loading, Unloading, Stacking Charges, All Taxes And Royalty. All Labour And T&P Required For Proper Completion Of Work As Per Direction Of E / I. 3 Collection Of 22.4-53 Mm Gauge S.S.B. Duly Stacked At Road Sit Including Cost Of Material, Cartage, Loading, Unloading, Stacking Charges, All Taxes And Royalty. All Labour And T&P Required For Proper Completion Of Work As Per Direction Of E ... Read More
Tender Value
₹
20,00,000
Contract Value
₹ 19,79,866
Saving / Difference
₹ 20,134
▲
Submission Date
27-04-2022
Contract Date
30-05-2022
Completion Date
30 days
Participated Bidder List
2 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 19,90,015 | L2 | |||
| 2 | cnet-technologies | Bid Analytics | 19,79,866 | L1 |
Work Detail
supply of material pot holes and patch repair ( sh / mdr / odr roads ) year 2022-23 in block-kunda.-2 collection of granular sub base ( shankargarh ) including cost of material, cartage, loading, unloading, stacking charges, all taxes and royalty. all labour and t&p required for proper completion of work as per direction of e / i. 3 collection of 22.4-53 mm gauge s.s.b. duly stacked at road sit including cost of material, cartage, loading, unloading, stacking charges, all taxes and royalty. all labour and t&p required for proper completion of work as per direction of e / i. 4 consolidation of g.s.b. and 22.4-53 mm gauge s.s.b. duly stacked at road sit including cost of material, cartage, loading, unloading, stacking charges, all taxes and royalty. ( labour & machinery rate only ) excluding cost of material, cost of bitumen & roller charges only ) required for proper completion of work as per direction of e / i. 5 collection ofstone dust screaningduly stacked at road sit including cost of material, cartage, loading, unloading, stacking charges, all taxes and royalty. all labour and t&p required for proper completion of work as per direction of e / i. 6 collection of 13.2 mm gauge kabrai grit duly stacked at road sit including cost of material, cartage, loading, unloading, stacking charges, all taxes and royalty. all labour and t&p required for proper completion of work as per direction of e / i. 7 collection of 11.20 mm gauge kabrai grit duly stacked at road sit including cost of material, cartage, loading, unloading, stacking charges, all taxes and royalty. all labour and t&p required for proper completion of work as per direction of e / i. 8 collection of 6.70 mm gauge kabrai grit duly stacked at road site including cost of material, cartage, loading, unloading, stacking charges, all taxes and royalty. all labour and t&p required for proper completion of work as per direction of e / i. 9 collection of 2.36 mm gauge kabrai grit duly stacked at road site including cost of material, cartage, loading, unloading, stacking charges, all taxes and royalty. all labour and t&p required for proper completion of work as per direction of e / i. 10 collection and consolidation of local sand uly stacked at road site including cost of material, cartage, loading, unloading, stacking charges and hoyallyas per direction of e / i. 11 earth in excavation in ordinery soil for foundation and trenches lead upto 30 mtr. and lift upto 1.50 mtr. as per direction of e / i 12 concredte with 40 cm. gauge stone ballast, fine sand of 1.25 f.m. and cement in proportion of 8:4:1 in foundation and uder floors, including supply of all materials, labour and t&p etc. required for proper completion of the work. si no. 5.13 ( 281 ) as per direction of e / i 13 supply, laying and fixing of 600 mm dia h.p. np3 including cartage uto site laying with collor joint filling in cement mortor with jute, labour t&p etc. as per directio of e / i 14 supply, laying and fixing of 350 mm dia h.p. np3 including cartage uto site laying with collor joint filling in cement mortor with jute, labour t&p etc. as per directio of e / i 15 first class brick work in 1:3 cement and coarse sand of 2.5 f.m. mortar in foundation and plincth including supply of all materials labour and t&p etc. required for proper completion of the work si. no. 307 as per direction of e / i. 16 repair of pots holes and remove of loose material, trimming of side clearing of surface, providing tack coat, 20 mm thick primix carpet and seal coat type-c ( labour & machinery rate only ) excluding cost of material, cost of bitumen & roller charges only ) as per technical specification clause 1904.2, 503 and 508.1 as per dirction of e / i. 17 earth work for filling of heavy rain cuts in embankment ordinary soil , excavation to be in the form of regular pits not exceeding 0.50 mtr. in depth and earth work in embankment to be in 20 cm layers including ramming and dressing the surface to required levels and slops and also including 1.5 mtr. lift and 30 mtr. lead the earth from cutting to be used in making embankment or to be deposited as spoil bank within 30 mtr. distance as directed by e / i, with 1 km. cartage 18 providing and fixing balli barricading in two row including cost of material etc. complete 19 balli barricading in three row including cost of material etc. complete 20 white washing one coatincluding supply of all material, labour nad t&p etc. required for proper completion of the work as per si no. 671 21 colour washing one coat using approved colouring materials of buff, blue, gray of brown shade, including supply of all material, labour nad t&p etc. required for proper completion of the work as per si no. 674 22 destemplering ( first coat ) with oil bound distemper of approved brand and manufacture & of required shade on undecorated wall surfaces to give an ebven shade over and including a priming coat with cement primer of approved brand and manufacture such as berger, j and n shalimar, asinan paintes including preparing the surface even with plaster of paris or approved cynthetic material and sand papered smooth including cost of all materials. labour, t&p etc. as per si no. 649 23 finishing wall with water proof cement paint of approved make and quality on new work with twp coats to give an even shade including supply of all material, labour, tools and plants etc. required for proper completion of the work. as per si no. 660 24 wall painting ( one coat ) with plastic emulsion paint of approved brand & manufacture on decorative wall surface to give an even shade including thoroughly brushing, clean all dirt, grease, loose pieces and preared smooth. as per si no. 15.15
View Original Notice/Document
Result Documents
Tender Documents
| Download | File Name | File Description |
|---|---|---|
| Download | b5f1b08c-a6bb-4371-9344-af29330c5e60 |
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results