BRR : 3139205
Tender Brief : Annual Civil Maintenance Addition And Alteration Work In Factory And Township At Bel Kotdwara . Annual Civil Maintenance , Addition And Alteration Work In Factory And Township At Bel Kotdwara . , Earth Work In Excavation In All Kind Of Soil In Foundation And Trench Including Disposal Of Excavated Earth Lead Upto 50 M And Lift Upto 1 . 5 M , As Directed By Engineer-In-Charge . , Surface Dressing Of The Ground Including Removing Vegetation And In-Equalities Not Exceeding 15 Cm Deep And Disposal Of Rubbish , Lead Up To 50 M And Lift Up To 1 . 5 M . All Kinds Of Soil , Cutting Ro... Read More
Tender Value
₹
60,44,494
Contract Value
₹ 49,17,366.65
Saving / Difference
₹ 11,27,127
▲
Submission Date
23-02-2021
Contract Date
29-05-2021
Completion Date
730 days
Participated Bidder List
7 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 56,81,825.02 | L4 | |||
| 2 | cnet-technologies | Bid Analytics | 50,77,375.55 | L3 | |||
| 3 | cnet-technologies | Bid Analytics | |||||
| 4 | cnet-technologies | Bid Analytics | |||||
| 5 | cnet-technologies | Bid Analytics | 49,17,366.65 | L1 | |||
| 6 | cnet-technologies | Bid Analytics | 49,37,375.55 | L2 | |||
| 7 | cnet-technologies | Bid Analytics |
Work Detail
annual civil maintenance addition and alteration work in factory and township at bel kotdwara . annual civil maintenance , addition and alteration work in factory and township at bel kotdwara . , earth work in excavation in all kind of soil in foundation and trench including disposal of excavated earth lead upto 50 m and lift upto 1 . 5 m , as directed by engineer-in-charge . , surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish , lead up to 50 m and lift up to 1 . 5 m . all kinds of soil , cutting road and making good the same including supply of extra quantities ofmaterials i . e . aggregate , moorum screening , red bajri and labour required . , filling available excavated earth ( excluding rock ) in trenches , plinth , sides of foundations etc . in layers not exceeding 20cm in depth , consolidating each deposited layer by ramming and watering , lead up to 50 m and lift upto 1 . 5 m . , diluting and injecting chemical emulsion for post constructional; antitermite treatment excluding the cost of chemical emulsion . , along external wall with apron using ch . emulsion @ 2 . 255 liter/ linear meter including drilling and plugging holes , etc . , treatment of soil under existing floor using ch . emulsion @ 1 liter . per hole 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1:2 to the full depth of the hole and match the existing floor . , treatment at points of contact of wood work by chemical emulsion chlorpyriphos/ lindane ( in oil or kerosene based solution ) @ 0 . 5 litres per hole by drilling 6 mm dia holes at downward angle of 45 degree at 150 mm centre to centre and sealing the same . treatment of existing masonry using ch . emulsion , mixing and laying of cable including filling with sand 100mm all around and laying of brick widthwise . , mixing and laying lean cement concrete of required ratio as per the direction of engineer-in-charge , including cost of vibrator etc . complete , but excluding the cost of shuttering . , all work upto plinth level , cc work above plinth level up to floor v level , mixing and laying cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size ) in pavements , laid to required slope and camber in panels as required including consolidation finishing and tamping complete , mixing and laying in position required grade of reinforced cement concrete , including cost of vibrator , carriage of material , scaffolding but excluding the cost of centering , shuttering , finishing and reinforcement - all work up to plinth level , mixing and laying rcc work of required ratio as per the direction of engineer-in-charge in super structure up to floor iv shelves , lintel , beams , slabs , etc . including the cost of vibrator but excluding shuttering , mixing and laying reinforced cement concrete in walls ( any thickness ) , including plinth and string courses , fillets , columns , pillars , pierse of required ratio as per the direction of engineer-in-charge but excluding the cost of shuttering . ( item includes cost of , scaffolding , lifting of material , vibrator ) , shuttering work excluding cost of shuttering , props , balli , etc . but including the cost of nails , etc . , in foundation , footings , bases of columns , etc . for mass concrete up to plinth , . , suspended floors , roofs , landings , balconies and access platform etc . , shuttering work columns , pillars , piers , abutments , posts and struts , etc . , placing of steel reinforcement for rcc work including cutting , bending , cost of binding wire , cover block . , constructing brick work in cement mortar ( of any ratio as per the direction of eic ) in foundation up to plinth . ( excluding the cost of brick , cement , sand ) , constructing brick work in cement mortar ( of any ratio as per the direction of eic ) above plinth up to floor iv level including scaffolding etc . ( excluding the cost of brick , cement , sand ) , construction of half brick work in cement mortar ( of any ratio as per the direction of eic ) in foundation up to plinth . ( excluding the cost of brick , cement , sand ) , construction of half brick work in cement mortar ( of any ratio as per the direction of eic ) in super structure above plinth including scaffolding etc . ( excluding the cost of brick , cement , sand ) , dry brick on edge flooring in required pattern with bricks including laying of bed of 12 mm mud mortar and sand filling . , fixing wooden door shutters including the cost of necessary screws . , fixing pvc door shutters including the cost of necessary screws . , fixing pvc door frame including the cost of necessary screws . , extra for providing vision panel not exceeding 0 . 1 sqm in all type of flush doors ( cost of glass excluded ) ( overall area of door shutter to be measured ) , fixing door fittings including the cost of necessary screws , carriage of material etc complete . , door handle/stopper etc . , fixing tower bolt , fixing sliding bolt/ pull bolt , refixing door/windows hinges/ brackets by welding at locations including the cost of welding rods etc , fixing/ repairing of mortise lock , cupboard , ward rob lock , fixing hydraulic door closer in new location including drilling ms chaukhat , cost of necessary screws etc , fixing/ repairing hydraulic door closer in old location including thecost of necessary screws etc complete , fixing section window handle/ peg stay including cost of all types of necessary screws . , repairing of al . door in its location including cost of all type of necessary screws , fixing board in wall lining or partitions including the cost of nails , necessary screws , etc . , fixing wooden moulded beading up to 50x12 mm including nails , necessary screws etc . , fixing of pelmet including repairing , including the cost of necessary screws and rawal plugs . , fixing of pelmet in its location , refixing/ fixing pelmet rods , fixing of boards including imbedding bolt in wall , fabrication work for door chaukhat , frame including primer coat , including cost of welding rods , etc . , fabrication structural steel work in single section including primer coat , including cost of welding rod , refixing wire mesh including cost of nails , necessary screws , fixing door/windows chaukhat with hold fast , extra for fixing/ grouting angle/ tee/ pipe , etc . on wall/ floor/ ground . , fixing gi chain link fencing including strengthening with 2mm dia wire or nuts bolts and washer as required complete , including the cost of wire or nuts bolts . , fabrication and fixing al . partition , frame , door & window shutters , etc . including the cost of nut , bolt , washers , neccesary screws etc . , cutting and fixing nova pan board pre-laminated in the al . partition , door shutter etc . including the cost of necessary screws , fixing glass pane in the al . partition , door shutter etc . including the cost of rubber gasket . , renewal of rubber gasket in the al . partition , door including the cost of rubber gasket . , refixing double action hydraulic floor door closer including cost of cutting hole as per size and finishing good the floor , fixing double action hydraulic floor door closer including cost of cutting hole as per size and finishing good the floor , fixing false ceiling frame structured for false ceiling tile size 600x600 mm and placing the tile including the cost of necessary screws , etc . , repair of false ceiling frame structured of tile size 600x600 mm and placing the tile including the cost of wire , necessary screws , etc . , repairing of rolling shutter , changing of hinges including cost of hinges . , change of spring including cost of 27 . 5cm long wire spring including the cost of necessary bolts etc complete
View Original Notice/Document
Result Documents
Tender Documents
| Download | File Name | File Description |
|---|---|---|
| Download | 1fd52b9a-8665-4023-aa81-827827175b58 |
| Download | File Name | File Description |
|---|---|---|
| Download | BOQ_94214 | Tender Documents - Price Bid |
| Download | RAcompliform | Tender Documents - Reverse Auction Compliance form |
| Download | Declarationform | Tender Documents - Declaration Certificate |
| Download | GCC | Tender Documents - GCC |
| Download | Tendernotice_1 | Tender Documents - NIT |
| Download | prequalicriteria | Tender Documents - Pre Qualification criteria |
| Download | 535A9084-BFCF-40B4-9785-0F2316013316 | Tender Documents - Tender Notice |
| Download | Tenderacceptanceletter | Tender Documents - Tender Acceptance letter |
| Download | SCC | Tender Documents - SCC |
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results