BRR : 2739096
Tender Brief : Logistic Arrangement For Park Street Christmas Festival–2022 Temporary Illumination, Sound System, Stage, Decoration Etc. Logistic Arrangement For Kolkata Christmas Festival 2022 Temporary Illumination, Sound System, Stage, Decoration Etc. , Stage, Structure And Other Accessories ( To Be Made Ready By 12:00 Noon Of 22.12.2022 ) Inside Allen Park , Wooden Platform On The Ground For Stagefrom 22.12.2022 To 30.12.2022Size: 32 X 20 + 8 X 4 + 8 X 4 ( Height - 4 ) = 704 Sqft , Backdrop Fitted With Batam Frame On The Platformsize : 32 X 15 = 480 Sqft. ( As Per Approve... Read More
Tender Value
₹
3,34,40,404
Contract Value
₹ 3,32,29,614
Saving / Difference
₹ 2,10,790
▲
Submission Date
30-11-2022
Contract Date
04-01-2023
Completion Date
4 days
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 2,82,76,323 | L2 | |||
| 2 | cnet-technologies | Bid Analytics | 2,83,32,919 | L3 | |||
| 3 | cnet-technologies | Bid Analytics | 3,32,29,614 | L1 |
Work Detail
logistic arrangement for park street christmas festival–2022 temporary illumination, sound system, stage, decoration etc. logistic arrangement for kolkata christmas festival 2022 temporary illumination, sound system, stage, decoration etc. , stage, structure and other accessories ( to be made ready by 12:00 noon of 22.12.2022 ) inside allen park , wooden platform on the ground for stagefrom 22.12.2022 to 30.12.2022size: 32 x 20 + 8 x 4 + 8 x 4 ( height - 4 ) = 704 sqft , backdrop fitted with batam frame on the platformsize : 32 x 15 = 480 sqft. ( as per approved design of tourism deptt. ) , 3 nos green room made with cloth ceiling and side covered by plain coloured cloth. size : 12 x 10 x 3 nos. = 360 sqft ( from 22.12.2022 to 30.12.2022 ) , podium on 22.12.2022 , centre table with coveron 22.12.2022 , 50 nos. of banquet chairon 22.12.2022 and 12 nos. of sofa for vipfrom 22.12.2022 to 30.12.2022 , plastic chair with white coverfrom 22.12.2022 to 30.12.2022 , plastic chairs for one day onlyon 22.12.2022 , pradip with stand, oil & lighting arrangementon 22.12.2022 , grey coloured synthetic carpet on stage , media platform with synthetic carpet , installation of m.s. truss based structure for gate decoration on road.size : 57 + 22 + 22 ( 20 ground clearance is required ) , floral decoration on stage and backdropon 22.12.2022 , cloth barricading based with bamboo structure on the groundsize : 75 + 52 + 70 + 126 = 323 rft , wooden platform on the ground for media with synthetic carpet and outside near gate of same size size : 24 x 8 x 3 h + 24 x 8 x 2 h = 384sqft , wooden platform laid on the ground with green synthetic carpet for passagesize : 145 x 8 = 1160 sqft , green synthetic carpet on passage 95ft x 6ft = 570sft for one dayon 22.12.2022 , walling by plain cloth for backside of the park size : 182 x 9 = 1638 sqft , view cutter on park street flyover ( eastern flank ) with durable material fitted on ms framesize : 85 x 12 = 1020 sqft , gisheet rooms with bamboo structure on road for cesc connection console points , octonum stall including table, chair, platform, carpet & spot light for tourism, health office & othersinside allen park ( from 22.12.2022 to 30.12.2022 ) size : 6 mt. x 2 mt. + 2 mt. x 2 mt. ( 4 nos. ) , 4 ( four ) nos bio-chemical toilets ( 2 gents & 2 ladies ) complete with water, towel, & soap with cleaning for 2 times a day at 03:00 pm and at 06:00 pm at allen parkfrom 22.12.2022 to 30.12.2022 , photography mask walling of plywood at allen park ( selfie zone ) near the stage , high speed internet ( wi-fi ) inside allen parkfrom 22.12.2022 to 30.12.2022 , electrical installationfrom 22.12.2022 to 08.01.2023 for park street, st. pauls cathedral church & its surrounding areas. , led flood light ( white & coloured ) 200 watt along footpath of park street from park hotel to u.n.brahmachari road crossing, camac street and surrounding areas. , dropping shower light. / decorative light , colour l.e.d ( set of1000 pcs. ) rice light , both side over head illuminated gate ofm.s. structure used for gates at different places -13 x 2 = 26 sides ( strictly as per approved colour & design of tourism deptt. ) , kolkata christmas festival logo ( strictly as per approved colour & design of tourism deptt. ) , gate of allen park illumination ( strictly as per approved colour & design of tourism deptt. ) , motif for allen park, along park street, at st.pauls cathedral church and its surrounding areaand along park street from loudon street to mullick bazar crossing ( strictly as per approved colour & design of tourism deptt. ) , decoration of passage at allen park , both side illuminated overhead gate with bamboo structure ( one at st.pauls cathedral church and two at cathedral road - near birla planetarium and near rabindra sadan ) , special big illuminated motif ( 24 high ) at park street and 2 nos. at st.pauls cathedral church , l type road lighting ( strictly as per approved colour and design of tourism department ) on 3 permanent gate structures at park street , l type road lighting ( 24 on park street, & 6 at st. pauls cathedral church area ) strictly as per approved colour and design of tourism deptt with erection of bamboo structure , led rope lighting to pillars in front of park hotel, pillars and trees along both sides of park street, allen park, & st.pauls cathedral church and their surrounding areas ( 7500 mtr ) , led par light ( colour changing ) , surfy pointee at park street , surfy , mirror ball around allen park , t truss at allen park and surrounding areas , electrical installatonfrom 22.12.2022 to 31.12.2022 for allen park , alpha beam moving head , led par , par - 64 , follow spot. , smoke machines , lasers , digital control boards. , digital power packs , necessary cable and wires , 260 running feet iron truss , 450 nos. dropping shower light / decorative light at park street, allen park and loudon street to mullick bazar crossing and cathedral road , 110 led par light at allen parkon 22.12.2022 , audio visual system for one dayon 22.12.2022 only at allen park. , 8 x 6 led walls , switcher , video mixing console , video camera , necessary cable and wires , sound systemfrom 22.12.2022 to 31.12.2022 at allen park ( quality of sound must be of very good ) , line array speakers , double 18-inch sub woofers , stage monitors , cordless microphones , roland stage gears , akg drum kit microphones set , corded microphone , 32 channel & helth audio mixing console , amplifier , cross - over unit , reverb and delay machine , necessary cable, wires, junction box and mcbs , pa system for traffic police kiosk adjacent to allen park , cd player with 145 horn units and cd player with 28 speaker box at park street from chowringee to aj bose road from 22.12.2022 to 31.12.2022. , sound engineer for 10 days , electrical arrangements at camac street upto bardhan marketfrom 22.12.2022 to 08.01.2023 , 492 nos. of coloured metal ( 400 watt ) , 116 nos. of led par , 2 nos. of mirror ball , 12 nos. of t - truss ( 16 x 6 ) , 40 nos. of surphy , 20 set led rice ( 1set = 1000 pcs ) , 1000 mtr rope light , dj console for 2 days as may be directed , 2 nos. 62 kva & 1no. 125 kva gen set with fuelon 22.12.2022 at allen park , 325nos 200w led flood light for temporary illumination of territorial army ground, rangers club ground, outram road, mayo road, cathedral road, queensway with 5 nos. 65 kva dg set with fuel and nearby areas with generator on 25 / 12 / 2022 , feed to 40 media channelson 22 / 12 / 2022 , dedicated labour staffon 22.12.2022 near the main stage at allen park from 4.00 pm to 11.00pm for shifting of stage furniture, musical instruments etc. ( to report to mr. s. calvert, mla, or his representative at 3 pm positively ) , 100 pairs of hand gloves , 100 caps with kcf logo , 15 nos. of police assistance booth complete structure with pa system and roof top cover at - ( a ) xing of j.l.nehru rd. & park street xing below park street flyover ( b ) park street and middleton row xing opposite flurys ( c ) park street and russel street xing ( d ) park street and free school street xing ( e ) park and camac street xing ( f ) xing od park street & rafi ahmed kidwai road, ( g ) xing of park street and loudon street, ( h ) xing of park street and rowdon street ( i ) xing of free school street and kyd street ( j ) xing of park street and a.j.c. bose road, ( k ) xing of free school street and ripon street ( l ) xing of free school street and royd street ( m ) xing of middleton street and russel street ( n ) xing of free school street and marquis street ( o ) southern footpath of park street beside allen park between wood street and camac street , 4 nos. cctv cameras with all accessoriesfrom 21.12.2022 to 31.12.2022 and 8 nos. of cctv cameras with all accessorieson 22.12.2022 inside allen park.
View Original Notice/Document
Result Documents
Tender Documents
| Download | File Name | File Description |
|---|---|---|
| Download | 3c03e29f-41ba-4905-9da4-a147e2ed4f3b |
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results