BRR : 2635603
Tender Brief : Supply Of Pillarpillar,Pillar, As Per Drawing: 2 10113.1.20.112.121, Packing Instruction: No Special Packing Required. The Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To Be Protected With Suitable Covering To Prevent It From Damage. However Transit Damage If Any Shall Be At The Cost Of Supplier., Proction Procedure: Na, Quality Plan: Na [ Warranty Period: 30 Months After The Date Of Delivery ] , Pillar, As Per Drawing: 2 10113.1.20.112.120, Packing Instruction: No Special Packing Required. The Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To Be ... Read More
Tender Value
₹
Ref. Document
Contract Value
₹ 22,80,831.44
Submission Date
05-01-2024
Contract Date
23-02-2024
Completion Date
Ref. Document
Participated Bidder List
1 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 22,80,831.44 | L1 |
Work Detail
supply of pillarpillar,pillar, as per drawing: 2 10113.1.20.112.121, packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any shall be at the cost of supplier., proction procedure: na, quality plan: na [ warranty period: 30 months after the date of delivery ] , pillar, as per drawing: 2 10113.1.20.112.120, packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any shall be at the cost of supplier., proction procedure: na, quality plan: na [ warranty period: 30 months after the date of delivery ] , pillar, as per drawing: 2 10113.0.20.112.100 b, packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any shall be at the cost of supplier., proction procedure: na, quality plan: na [ warranty period: 30 months after the date of delivery ] , pillar, as per drawing: lw14110 alt. e, packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any shall be at the cost of supplier., proction procedure: na, quality plan: na [ warranty period: 30 months after the date of delivery ] , pillar, as per drawing: lw14111 alt. e, packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any shall be at the cost of supplier., proction procedure: na, quality plan: na [ warranty period: 30 months after the dat
View Original Notice/Document
Result Documents
Tender Documents
| Download | File Name | File Description |
|---|---|---|
| Download | c61a0ae7-1b51-40b3-b705-9818f5b9cc21 |
| Download | File Name | File Description |
|---|---|---|
| Download | 1d1fe394-4ecb-4e84-9277-e70b15a113a1 | Tender Documents |
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results