BRR : 250459
Tender Brief : Improvement Works Of Rectification Of Spalled And Distressed Rcc Pole Structures In 110 And 22 Kv Yard Kv Yards Area At 110 Kv Sipcot Ss , Providing Two Legged Scaffolding For Works Upto 3M . Height And Above 3M . Heights Using 10 To 13 Cm . Dia . Best Quality Casuarina Props , The Distance Between The Two Rows Being 1 . 25M . And The Spacing Of Posts Being 2M . In Both The Rows With Two Horizontal Posts With 0 . 5M . Overlap On Either Side And Braces At 2M . C/C Including Longitudinal & Transverse Middle Braces To Stepup And Providing A Platform With Country Wood Planks Of 40 Mm ... Read More
Tender Value
₹
1,89,799
Contract Value
₹ 1,89,791
Saving / Difference
₹ 8
▲
Submission Date
19-07-2021
Contract Date
16-04-2022
Completion Date
180 days
Participated Bidder List
1 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 1,89,791 | L1 |
Work Detail
improvement works of rectification of spalled and distressed rcc pole structures in 110 and 22 kv yard kv yards area at 110 kv sipcot ss , providing two legged scaffolding for works upto 3m . height and above 3m . heights using 10 to 13 cm . dia . best quality casuarina props , the distance between the two rows being 1 . 25m . and the spacing of posts being 2m . in both the rows with two horizontal posts with 0 . 5m . overlap on either side and braces at 2m . c/c including longitudinal & transverse middle braces to stepup and providing a platform with country wood planks of 40 mm . thick & 1m . width etc . including cost of all materials , labours , lead , lift , safety measures , etc . , complete heiht upto 3mt . , from gl . , providing two legged scaffolding for works upto 3m . height and above 3m . heights using 10 to 13 cm . dia . best quality casuarina props , the distance between the two rows being 1 . 25m . and the spacing of posts being 2m . in both the rows with two horizontal posts with 0 . 5m . overlap on either side and braces at 2m . c/c including longitudinal & transverse middle braces to stepup and providing a platform with country wood planks of 40 mm . thick & 1m . width etc . including cost of all materials , labours , lead , lift , safety measures , etc . , complete height upto 4 m from 3mt . ( pole height 4 . 00 m from gl ) , providing two legged scaffolding for works upto 3m . height and above 3m . heights using 10 to 13 cm . dia . best quality casuarina props , the distance between the two rows being 1 . 25m . and the spacing of posts being 2m . in both the rows with two horizontal posts with 0 . 5m . overlap on either side and braces at 2m . c/c including longitudinal & transverse middle braces to stepup and providing a platform with country wood planks of 40 mm . thick & 1m . width etc . including cost of all materials , labours , lead , lift , safety measures , etc . , complete height above 7 . 50 mt . , from 3 mt ( pole height 7 . 66 m from gl ) , removing the spalled / distressed rcc from the existing concrete to an average thickness of 32 mm and retrieving from steels & clearing away the debrises from the site as directed by the engineer at site including cost of all labours , lead , lift , tools & plants , etc . complete . , applying one coat of nito zinc primer after thorough cleaning of rust in the reinforcement including cost of all materials , labours , lead , lift , etc . complete . , supplying & providing tmt rod including cutting , bending , tying & fixing in position as per specification including binding wires , cost of all other materials , labours , lead , lift , etc . complete . , plastering in poles with c . m . 1:3 ( in 4 parts , 1 part baby jelly 6 mm may be used in deep peeled off portions ) , 20 mm thick with nitobond ar mixed in cement mortar at 250ml / bag of cement including cost of all materials , labours , lead , lift , curing , etc . complete . , plastering in poles with c . m 1:3 , 12 mm thick with nitobond ar mixed in cement mortar at 250 ml . / bag of cement including cost of all materials , labours , lead , lift , curing , etc . complete . , providing two coats of ready mixed plastic emulsion painting of approved colour & quality on new outer surfaces over one coat of white cement primer , including cost of all materials , scaffolding charges , labours , lead , lift , curing , etc . complete .
View Original Notice/Document
Result Documents
Tender Documents
| Download | File Name | File Description |
|---|---|---|
| Download | b4890694-cac5-4c87-bef0-5677ebae99b0 |
| Download | File Name | File Description |
|---|---|---|
| Download | Tendernotice_1 | Tender Documents - Improvement works of Rectification of spalled and distressed RCC Pole structures in 110 and 22 KV Yard KV yards area at 110 KV Sipcot SS |
| Download | BOQ_243304 | Tender Documents - Improvement works of Rectification of spalled and distressed RCC Pole structures in 110 and 22 KV Yard KV yards area at 110 KV Sipcot SS. |
| Download | 6B20D3DD-E5CD-4BDE-898C-B473F20271AE | Tender Documents - Tender Notice |
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results