BRR : 2215938
Tender Brief : Repair And Maintenance Of Intake Pump House And Corridor Road For The Year 2020-22 , Earthwork In Excavation Of Foundation Trenches Drains Including Dressing Of Sides & Ramming Of Bottoms , Lift Upto 1 . 5M Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil , As Directed , In All Types Of Soil Including Hard Soil . , Earthwork In Excavation Over Areas , Including Disposal Of Excavated Earth , Lead Upto 100 M And Lift Upto 1 . 5M Disposed Earth To Be Levelled And Neatly Dressed , In All Types Of Soil Including Hard Soil . , Making ... Read More
Tender Value
₹
Ref. Document
Contract Value
₹ 31,45,831.8
Submission Date
26-08-2020
Contract Date
16-02-2021
Completion Date
730 days
Participated Bidder List
16 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 34,50,571.77 | L8 | |||
| 2 | cnet-technologies | Bid Analytics | 34,58,199.35 | L9 | |||
| 3 | cnet-technologies | Bid Analytics | 33,23,082.22 | L6 | |||
| 4 | cnet-technologies | Bid Analytics | 37,77,468.04 | L12 | |||
| 5 | cnet-technologies | Bid Analytics | 38,13,426.63 | L13 | |||
| 6 | cnet-technologies | Bid Analytics | 33,05,284.54 | L5 | |||
| 7 | cnet-technologies | Bid Analytics | 35,59,537.19 | L10 | |||
| 8 | cnet-technologies | Bid Analytics | 37,40,783.02 | L11 | |||
| 9 | cnet-technologies | Bid Analytics | 39,67,794.32 | L14 | |||
| 10 | cnet-technologies | Bid Analytics | 32,22,107.6 | L3 | |||
| 11 | cnet-technologies | Bid Analytics | 32,50,801.82 | L4 | |||
| 12 | cnet-technologies | Bid Analytics | 33,77,928.15 | L7 | |||
| 13 | cnet-technologies | Bid Analytics | 31,92,686.93 | L2 | |||
| 14 | cnet-technologies | Bid Analytics | 35,59,537.19 | L10 | |||
| 15 | cnet-technologies | Bid Analytics | 31,45,831.8 | L1 | |||
| 16 | cnet-technologies | Bid Analytics | 34,50,571.77 | L8 |
Work Detail
repair and maintenance of intake pump house and corridor road for the year 2020-22 , earthwork in excavation of foundation trenches drains including dressing of sides & ramming of bottoms , lift upto 1 . 5m including getting out the excavated soil and disposal of surplus excavated soil , as directed , in all types of soil including hard soil . , earthwork in excavation over areas , including disposal of excavated earth , lead upto 100 m and lift upto 1 . 5m disposed earth to be levelled and neatly dressed , in all types of soil including hard soil . , making channel in sand/ sandy soil in riverbed in dry or wet condition or within the water flow including removing the sand for directing the flow , as desired . , supplying & filling in plinth & wherever required with locally available sand , watering , ramming complete as per instruction of manager-in-charge . , filling available excavated earth ( excluding rock ) in trenches , plinth sides of foundation etc . in layers not exceeding 20cm in depdth consolidating each deposited layer by ramming and watering lead upto 50m . & lift upto 1 . 50m . , surface dressing of the ground including removing , vegetation & inequalities not exceeding 15cm deep & disposal of rubbish lead upto 50m & lift upto 1 . 5m in all types soil etc . , cleaning grass & removal of the rubbish upto 100m outside the periphery of the area cleaned or firing the rubbish as required by cisf personnel . , cleaning of jungle including uprooting of rank vegetation , grass , brush wood , trees & sappling etc . and removal of rubbish upto a distance of 50m outside of the periphery of the area cleaned , including cutting of trees etc . in road side berms . , uprooting of small trees & roots from the existing bldg . / structures/ walls/ drain/ floor etc . including partial dismantling and mending good the damages with refilling cement concrete 1:3:6 with 10mm & down size chips , plastering 1:4 & finished smooth . ( measurement shall be taken up for concrete & plaster separately for payment ) . , collecting sand from river bed & filling into empty cement bags & duly tied up . ( capacity of the bag should not be less than 1 cft . ) for dumping in river bed for diverting the flow , excluding the cost of empty cement bags . payment shall be made as no of bag basis ) , cleaning of intake chamber in intake pump house which is 16 . 5mtr . below ground level and removal of slush/silt/sand/ other deposition etc . & taking out the same and disposal of the same within a lead of 50mtr . etc . including dewatering the sumps with supply of pump sets & other tools & plants , safety equipment etc . required for the work . , cleaning of open masonry drains & culvert etc . including removal of vegetation , slush soil , garbages , loose stones & earth deposited & disposal of the same within 50 mtr . , cleaning of hume pipe culvert & in the river nandira including removal of chockages ( partly or fully ) complete , as and when required . , removal of slush/ deposits of ash & depositing the same at a distance of 50mt . properly stacked . ( measurement will be taken as per stack measurement ) , cleaning & sweeping of floor including necessary removal of the garbage to the area within a lead of 50mtrs . as per instruction of mic . , cutting of felling trees/ branching of trees & removal of debries to the area within a lead of 50m as per instruction of mic . , providing & laying of pcc 1:2:4 using 20mm & down aggregates at any level , in proportion , cement coarse sand: stone aggregates as mentioned below excluding centring & shuttering , cement etc . , providing & laying of pcc 1:3:6 using 20mm & down aggregates at any level , in proportion , cement coarse sand: stone aggregates as mentioned below excluding centring & shuttering , cement etc . , providing & laying of reinforced cement concrete work 1:1 . 5:3 ( 1 cement : 1 . 5 coarse sand :3 stone aggregate 20mm nominal size ) in raft , footing , base of columns , chajja , roof slab etc . excluding the cost of centering & shuttering , cement & reinforcement steel etc . , transporting from nalcos store & fixing in position iron/ wooden door , windows ventilators , gates etc . complete . ( concrete & plastering shall be paid separately ) , providing and placing in position tor steel reinforcement for rcc work including straightening , cutting , bending to required shape , binding with contractors own binding wires with proper cover blocks , supports , chairs , spacers etc . at all depth and heights including transportation , loading and unloading etc . all complete as per specification and direction of mic . , brickwork using fly ash brick in foundation and plinth for making chambers etc on any floor in cm 1:6 ( 1 cement :6 coarse sand ) complete including curing etc as directed by m-i-c ( cement and fly ash brick will be provided by nalco free of cost at its main store and brick manufacturing unit ) , brickwork using fly ash brick in superstructure in cm 1:6 ( 1 cement :6 coarse sand ) complete including curing etc as directed by m-i-c ( cement and fly ash brick will be provided by nalco free of cost at its main store and brick manufacturing unit ) , providing cement plaster 1:6 ( 12mm thick ) in coarse sand with cement mortar at all elevation including supply of all labour scafolding materials etc . for repair & new works excluding cost of cement complete . , providing cement plaster 1:6 ( 15mm thick ) in coarse sand with cement mortar at all elevation including supply of all labour scafolding materials etc . for repair & new works excluding cost of cement complete . , providing neat cement punning etc . complete for all heights . , providing cement concrete flooring 1:2:4 finished with a floating coat of neat cement punning , rounding of edges & strips , glass strips etc . excluding cost of cement complete for 40 mm thick with 20mm nominal size chips . , providing rr stone masonry in cm 1:6 using hard stone boulder in foundation & plinth superstructures whereever required including scafolding etc . complete excluding cost of cement , including levelling course in c . c 1:6:12 . , flush pointing with 1:3 cement mortar over stone pitching/ brick work , providing coping on top of compound wall with c . c 1:2:4 with 10mm nominal size granite chips , thickness 50mm , with inserting of broken glass pieces etc . complete , excluding cost of cement as per instruction of mic . , 52 mm thick concrete flooring with concrete hardner topping under layer 40mm thick concrete 1:2:4 ( 1 cement :2 coarse sand :4 graded stone 20mm nominal size ) and top layer 12mm thick cement hardner compound consisting of mix 1:2 ( 1 cement hardner mix :2 stone aggregate 6mm nominal size ) by volume hardening compound mixed at 2 lt per 50 kg of cement or as per manufacturer instruction ) by volume including cement slurry rounding of edges & strips etc . , dismantling and disposal of brickwork within 100m lead including stacking and cleaning the area all complete . , dismantling and disposal of plain cement concrete within 100m lead including stacking and cleaning the area all complete . , dismantling and disposal of reinforced cement concrete within 100m lead including stacking and cleaning the area all complete . , extra for cutting of reinforcement bars in rcc works ( payment shall be made on the cross sectional area of rcc wall ) as directed by m-i-c , dismatling of plaster including raking out joints , removing of old
View Original Notice/Document
Result Documents
Tender Documents
| Download | File Name | File Description |
|---|---|---|
| Download | 97482e0c-b30f-4f02-80fa-28aece9708ef |
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results