BRR : 21327
Tender Brief : Work Of Against Sanction Package No . D-37 / 2019-20 , D-23 / 2019-20 , D-22 / 2019-20 , D-31 / 2019-20 , D-41 / 2019-20 And D-57 / 2019-20 Construction Of Line-2 Loading, Unloading And Carriage Of Following Material From Store Centre, Maharajganj To Work Site:- Pcc Pole 8.5 Mtr. Long- 02 Nos., Acsr Weasel Conductor- 0.100 Km., 11 Kv Disc Insulator With Fitting- 06 Nos., Earthing Rod Complete- 08 Nos., Stay Rod 16X1800 Complete- 02 Nos., 11 Kv Xlpe Cable 3X120mm²- 50 Mtr., 11 Kv Jointing Kit 3X120 Mm² Outdoor- 07 Nos., 11 Kv Jointing Kit 3X120 Mm² Ind... Read More
Tender Value
₹
Ref. Document
Contract Value
₹ 2,34,646
Submission Date
31-03-2021
Contract Date
05-07-2021
Completion Date
60 days
Participated Bidder List
2 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 2,34,646 | L1 | |||
| 2 | cnet-technologies | Bid Analytics | 2,37,323.09 | L2 |
Work Detail
work of against sanction package no . d-37 / 2019-20 , d-23 / 2019-20 , d-22 / 2019-20 , d-31 / 2019-20 , d-41 / 2019-20 and d-57 / 2019-20 construction of line-2 loading, unloading and carriage of following material from store centre, maharajganj to work site:- pcc pole 8.5 mtr. long- 02 nos., acsr weasel conductor- 0.100 km., 11 kv disc insulator with fitting- 06 nos., earthing rod complete- 08 nos., stay rod 16x1800 complete- 02 nos., 11 kv xlpe cable 3x120mm²- 50 mtr., 11 kv jointing kit 3x120 mm² outdoor- 07 nos., 11 kv jointing kit 3x120 mm² indoor- 02 nos., 3 phase 4 wire11 kv tvm ele. meter- 02 nos., 11 kv ppmc 15 / 5 amp.- 01 no., 11 kv ct / pt unit 15 / 5 amp.- 01 no., dropper channel / angle 100x50- 02 nos., t-off channel 100x50 mm- 01 no., top channel 100x50 mm- 01 no., g.i. pipe 6 dia- 08 mtr., nut & bolt- 03 kg., transformer base- 02 nos., clamp / dropper / t-off channel- 07 nos. 3 erection of double pcc pole with all fitting 4 grouting & making plinth of 8.5 mtr. long pcc pole 5 earthing of pole 6 stringging and sagging of acsr weasel conductor 3 phase 3 wire 7 erection of stay 8 erection of cable jointing kit 9 erection of ct / pt combind unit 10 erection of xlpe cable 11 erection of g.i. pipe 12 erection of ppmc 13 fo|qr forj.k [ k.m&izfke ] egjktxat ds vurxzr tek ;kstuk 2019&20 esa lohd`r isdst la [ ;k mh&23@2019&20 ¼esllz egknso ekmuz jkbzl fey ] izkizk0 jh fou; dqekj ivsy ] xzke o iks0 iusok&iusbz ] tuin egjktxat dks 250 dsoh, 0 , p0oh0&2 fo / kk esa fo|qr la;kstu nsus dk dk;z½ ds dk;ksz dks djk;s tkus gsrq dk;z dk fooj.k%& 14 loading, unloading and carriage of following material from store centre, maharajganj to work site:- pcc pole 8.5 mtr. long- 02 nos., acsr weasel conductor- 0.120 km., 11 kv disc insulator with fitting- 06 nos., earthing rod complete- 03 nos., 11 kv xlpe cable 3x120 mm²- 50 mtrs., cable jointing kit 3x120 mm² indoor- 02 nos., cable jointing kit 3x120 mm² outdoor- 02 nos., 3 phase 4 wire 11 kv tvm ele. meter- 02 nos., 11 kv ppmc 15 / 5 amp.- 01 no., 11 kv ct / pt unit 15 / 5 amp.- 01 no., t-off channel 100x50 mm- 01 no., top channel 100x50 mm- 01 no., g.i. pipe 6 dia- 08 mtrs., nut & bolt- 04 kg., transformer base- 02 nos., clamp / dropper / t-off channel- 03 nos. 15 erection of double pcc pole with all fitting 16 grouting & making plinth of 8.5 mtr. long pcc pole 17 earthing of pole 18 stringging and sagging of acsr weasel conductor 3 phase 3 wire 19 erection of stay 20 erection of cable jointing kit 21 erection of ct / pt combind unit 22 erection of xlpe cable 23 erection of g.i. pipe 24 erection of ppmc 25 fo|qr forj.k [ k.m&izfke ] egjktxat ds vurxzr tek ;kstuk 2019&20 esa lohd`r isdst la [ ;k mh&22@2019&20 ¼esllz jh fkoe xzsul b.mlvªht izksizk0 jktsunz dqekj ivsy xzke o iks0 iusok&iusbz ] tuin egjktxat dks 225 dsoh, 0 , p0oh0&2 fo / kk esa fo|qr la;kstu nsus dk dk;z½ ds dk;ksz dks djk;s tkus gsrq dk;z dk fooj.k%& 26 loading, unloading and carriage of following material from store centre, maharajganj to work site:- pcc pole 8.5 mtr. long- 02 nos., acsr weasel conductor- 0.020 km., earthing rod complete- 03 nos., 11 kv xlpe cable 3x120 mm²- 47.706 mtrs., cable jointing kit 3x120 mm² indoor- 02 nos., cable jointing kit 3x120 mm² outdoor- 04 nos., 3 phase 4 wire 11 kv tvm ele. meter- 02 nos., 11 kv ppmc 15 / 5 amp.- 01 no., 11 kv ct / pt unit 15 / 5 amp.- 01 no., top channel 100x50 mm- 01 no., g.i. pipe 6 dia- 18 mtrs., nut & bolt- 03 kg., transformer base- 02 nos., clamp / dropper / t-off channel- 02 nos. 27 erection of double pcc pole with all fitting 28 grouting & making plinth of 8.5 mtr. long pcc pole 29 earthing of pole 30 erection of cable jointing kit 31 erection of ct / pt combind unit 32 erection of xlpe cable 33 erection of g.i. pipe 34 erection of ppmc 35 fo|qr forj.k [ k.m&izfke ] egjktxat ds vurxzr tek ;kstuk 2019&20 esa lohd`r isdst la [ ;k mh&31@2019&20 ¼vf / kkklh vfhk;urk ] izkurh; [ k.m ] yksd fuekz.k fohkkx ] lnj ] egjktxat esa tek ;kstuk vurxzr 63 dsoh, 0 ifjorzd yxkus dk dk;zz½ ds dk;ksz dks djk;s tkus gsrq dk;z dk fooj.k%& 36 loading, unloading and carriage of following material from store centre, maharajganj to work site:- st pole 11 mtr. long- 02 nos., acsr dog conductor- 0.110 km., 11 kv disc insulator with fitting- 06 nos., 11 kv pin insulator with pin- 03 nos., earthing rod complete- 02 nos., stay complete 16x1800- 02 nos., transformer 63 kva- 01 no., lt pvc cable 3.5x70 mm²- 15 mtr., guarding angle- 03 nos., guarding angle clamp- 03 nos., eye bolt- 04 nos., danger board- 01 no., dropper channel / angle 100x50- 01 no., t-off channel 100x50 mm- 01 no., top channel 100x50 mm- 01 no., g.i. wire 6 swg- 11 kg., g.i. wire 8 swg- 11 kg., nut & bolt- 03 kg., transformer base- 02 nos., clamp / dropper / t-off channel- 05 nos., barved wire- 02 kg. 37 erection of double st pole with all fitting 38 grouting & making plinth of 11 mtr. long st pole 39 earthing of pole 40 stringging and sagging of acsr dog conductor 3 phase 3 wire 41 erection of stay 42 mounting of 63 kva transformer on double pole and its connection 43 guarding of 11 kv line 44 erection of lt ab conductor 45 tree cutting 46 fo|qr forj.k [ k.m&izfke ] egjktxat ds vurxzr tek ;kstuk 2019&20 esa lohd`r isdst la [ ;k mh&41@2019&20 ¼is;ty ;kstuk esa xzke&ujk;uiqj ] fodkl [ k.m&?kq?kyh ] egjktxat dks 08 , p0ih0 ykbzu fuekz.k dj fo|qr la;kstu nsus dk dk;z½ ds dk;ksz dks djk;s tkus gsrq dk;z dk fooj.k%& 47 loading, unloading and carriage of following material from store centre, maharajganj to work site:- pcc pole 8.5 mtr. long- 15 nos., acsr weasel conductor- 2.535 km., 11 kv disc insulator with fitting- 18 nos., 11 kv pin insulator with pin- 42 nos., 11 kv x-arm v type- 11 nos., earthing rod complete- 14 nos., stay rod 16x1800 complete- 08 nos., transformer 25 kva- 01 no., lt cable 4x25 mm²- 40 mtr., x-arm holding clamp- 11 nos., f- bracket with nut & bolt- 11 nos., dropper channel / angle 100x50- 02 nos., t-off channel 100x50 mm- 05 no., top channel 100x50 mm- 01 no., nut & bolt- 12 kg., transformer base- 02 nos., clamp / dropper / t-off channel- 11 nos. 48 erection of single pcc pole with all fitting 49 erection of double pcc pole with all fitting 50 grouting & making plinth of 8.5 mtr. long pcc pole 51 earthing of pole 52 stringging and sagging of acsr weasel conductor 3 phase 3 wire 53 erection of stay 54 mounting of 25 kva transformer on double pole and its connection 55 erection of lt ab conductor 56 tree cutting 57 fo|qr forj.k [ k.m&izfke ] egjktxat ds vurxzr tek ;kstuk 2019&20 esa lohd`r isdst la [ ;k mh&57@2019&20 ¼is;ty ;kstuk xzke vkscjh ] fodkl [ k.m febksjk ] egjktxat ijrkoy esa 11 dsoh0 ykbzu fuekz.k dj 10-5 , p0ih0 fo|qr la;kstu nsus dk dk;z½ ds dk;ksz dks djk;s tkus gsrq dk;z dk fooj.k%& 58 loading, unloading and carriage of following material from store centre, maharajganj to work site:- pcc pole 8.5 mtr. long- 09 nos., st pole 11 mtr long- 04 nos., acsr weasel conductor- 1.554 km., 11 kv disc insulator with fitting- 24 nos., 11 kv pin insulator with pin- 22 nos., 11 kv x-arm v type- 06 nos, earthing rod complete- 09 nos., stay rod 16x1800 complete- 07 nos., transformer 25 kva- 01 no., lt cable 3.5x70 mm²- 30 mtr., x-arm holding clamp- 06 nos., f- bracket with nut & bolt- 06 nos., dropper channel / angle 100x50- 02 nos., t-off channel 100x50 mm- 07 no., top channel 100x50 mm- 01 no., nut & bolt- 07 kg., transformer base- 02 nos., clamp / dropper / t-off channel- 13 nos. 59 erection of single pcc pole with all fitting 60 erection of double pcc pole with all fitting 61 erection of single st pole with all fitting 62 grouting & making plinth of st / pcc pole 63 earthing of pole 64 stringging and sagging of acsr weasel conductor 3 phase 3 wire 65 erection of stay 66 mounting of 25 kva transformer on double pole and its connection 67 erection of lt ab conductor
View Original Notice/Document
Result Documents
Tender Documents
| Download | File Name | File Description |
|---|---|---|
| Download | 214529ac-8e36-4bae-97f0-f95789c9c255 |
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000