BRR : 1989258
Tender Brief : Outsourcing Of Manning And Operation Of Sewage Installation , Electric Supply Installation And Swimming Pool At Inf Line Jamnagar , Outsourcing Management For Running / Maintenance Sewage Installations I . E Otm Accn 2 . Firing Range . One Operator Per Shift Of 08 Hours In A Day ( Two Shift Per Day ) And ( Comprising The Components Detailed Below ) Including Operating Of Non Clog Type Sewage Pump Sets , , ( Including Sunday &Holiday ) All As Specified And Directed By Engr -In-Charge :- , Note :- Operator Will Responsible For The Day To Day Reading For Total Running Of ... Read More
Tender Value
₹
Ref. Document
Contract Value
₹ 41,35,860
Submission Date
05-01-2021
Contract Date
29-01-2021
Completion Date
333 days
Participated Bidder List
9 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 43,18,344 | L4 | |||
| 2 | cnet-technologies | Bid Analytics | 43,58,637 | L5 | |||
| 3 | cnet-technologies | Bid Analytics | 43,95,600 | L6 | |||
| 4 | cnet-technologies | Bid Analytics | 42,55,740 | L2 | |||
| 5 | cnet-technologies | Bid Analytics | |||||
| 6 | cnet-technologies | Bid Analytics | 43,15,680 | L3 | |||
| 7 | cnet-technologies | Bid Analytics | 41,35,860 | L1 | |||
| 8 | cnet-technologies | Bid Analytics | |||||
| 9 | cnet-technologies | Bid Analytics | 43,99,596 | L7 |
Work Detail
outsourcing of manning and operation of sewage installation , electric supply installation and swimming pool at inf line jamnagar , outsourcing management for running / maintenance sewage installations i . e otm accn 2 . firing range . one operator per shift of 08 hours in a day ( two shift per day ) and ( comprising the components detailed below ) including operating of non clog type sewage pump sets , , ( including sunday &holiday ) all as specified and directed by engr -in-charge :- , note :- operator will responsible for the day to day reading for total running of plants and its connected equipments will be maintained by the operator as per direction of engr -in-charge . record for the same will maintained in daily log sheet and submit to engr -in-charge when ever asked for inspection . ( a ) electric motor control panels cubical type - 01 nos at each installation . ( b ) non clog pump sets- 02 nos ( c ) cleaning of grass/tree branches etc in installation area will maintain by operator . . ( d ) contractor must provided broom , tree cutting tools , branch cutting tool and any other cleanning tools etc . these item cost included in operator quotated rate . ( ii ) operations/maintenance/cleaning of following equipments of sewage installation and its connected work carried out by the contractor ( e ) contractor should provide safety shoes , all necessary tools , torch , rain coat etc , outsourcing management for running / maintenance sewage installations i . e 1 new lines 2 . map lines 3 . dogra lines one operator per shift of 08 hours in a day ( two shift per day ) and ( comprising the components detailed below ) including operating of non clog type sewage pump sets , , ( including sunday &holiday ) all as specified and directed by engr -in-charge :- , note :- operator will responsible for the day to day reading for total running of plants and its connected equipments will be maintained by the operator as per direction of engr -in-charge . record for the same will maintained in daily log sheet and submit to engr -in-charge when ever asked for inspection . ( a ) electric motor control panels cubical type - 01 nos at each installation . ( b ) non clog pump sets- 03 nos ( c ) cleaning of grass/tree branches etc in installation area will maintain by operator . . ( d ) contractor must provided broom , tree cutting tools , branch cutting tool and any other cleanning tools etc . these item cost included in operator quotated rate . ( ii ) operations/maintenance/cleaning of following equipments of sewage installation and its connected work carried out by the contractor ( e ) contractor should provide safety shoes , all necessary tools , torch , rain coat etc , notes for item no 1 to2 ( i ) necessary weekly off will be given to manpower employed for this schedule as per existing rules and regulation of state /central govt . and necessary replacement will be provided by the contractor . rates quoted for this schedule shall deemed to be included this provision . ( ii ) in case absence of any operator/ workmen from any shift will be penalized with a penalty of double the rate quoted by the contractor in addition to the shift not taken in to consideration for payment . ( iii ) operator wanting leave will get it sanctioned before proceeding on leave along with the name of individual who will be performing his duty/shift in his absence . no replacement of operator/workmen without the knowledge of department will be allowed . ( iv ) the contractor shall not pay wages lower than minimum wages for labour as fixed by govt of india / state govt . / union territory ( whichever is higher ) under minimum wages act or contract labour ( abolition and regulation act ) . . ( v ) muster roll , duty roster and other requisite registers will be maintained by contractor and get it signed by concerned je on daily basis and same shall be submitted monthly to accepting officer for inspection . ( vi ) qualification , duty and shift timing of man power employed will be as per particular specifications to the tender documents . ( vii ) contractor special attention is invited that payment of operator / labour shall be made only through account payee cheque and same shall be deposited in adhar link account of operator / labour . documentary evidence for the same shall be submitted to engineer -in-charge before payment of rar / final bill . , outsourcing management for electrical maintenance of mrs sub station , one electrician per shift of 08 hrs in a day ( three shift per day ) ( including sunday &holiday ) all as specified and directed by engr -in-charge :- , note :- electrician will responsible for maint & operation of installed switchgear at electric supply installation . record for the same will be maintained in daily log sheet and submit to engr -in-charge when ever asked for inspection . ( a ) contractor must provided electric tool such as shockproof gloves , shoes , multimeter , crimpping tools , cutting plier etc for group of electrician . these item cost included in electrician quotated rate . , . outsourcing management for electrical maintenance of bg line sub station , one electrician per shift of 08 hrs in a day ( three shift per day ) ( including sunday &holiday ) all as specified and directed by engr -in-charge :- , note :- electrician will responsible for maint & operation of installed switchgear at electric supply installation . record for the same will maintained in daily log sheet and submit to engr -in-charge when ever asked for inspection . ( a ) contractor must provided electric tool such as shockproof gloves , shoes , multimeter , crimpping tools , cutting plier etc for group of electrician . these item cost included in electrician quotated rate . , notes for item no 3 to4 ( i ) necessary weekly off will be given to manpower employed for this schedule as per existing rules and regulation of state /central govt . and necessary replacement will be provided by the contractor . rates quoted for this schedule shall deemed to be included this provision . ( ii ) in case absence of any operator/ workmen from any shift wi
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results