BRR : 1863142
Tender Brief : Tender For Supply Of Equipment / Material, Design, Erection, Testing, Commissioning, For Restoration / Re-Alignment Of Various H.T / L.T. Lines Damaged Due To Heavy Rain Fall During Monsoon 2023 In Lieu Of Safety Concerns Under Electrical Sub-Division, Hpsebl Nagrota Bagwan. ( Seop-23 / 2023-24 ) .-Restoration / Re-Alignment Of Various H.T / L.T. Lines Damaged 2 Prov. Conductor Aaac 7 / 3.15 ( 55Mm2 ) 3 Prov. Steel Tubular Pole 9 Mtr. Long 4 Prov. Steel Tubular Pole 8 Mtr. Long 5 Prov. Rcc Muff With Concrete Fiiling 6 Prov.X-Arm: [ Ch... Read More
Tender Value
₹
7,36,665
Contract Value
₹ 7,66,479
Saving / Difference
₹ -29,814
▼
Submission Date
16-08-2023
Contract Date
26-08-2023
Completion Date
90 days
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 7,66,479 | L1 | |||
| 2 | cnet-technologies | Bid Analytics | 8,47,238.42 | L3 | |||
| 3 | cnet-technologies | Bid Analytics | 8,47,164.75 | L2 |
Work Detail
tender for supply of equipment / material, design, erection, testing, commissioning, for restoration / re-alignment of various h.t / l.t. lines damaged due to heavy rain fall during monsoon 2023 in lieu of safety concerns under electrical sub-division, hpsebl nagrota bagwan. ( seop-23 / 2023-24 ) .-restoration / re-alignment of various h.t / l.t. lines damaged 2 prov. conductor aaac 7 / 3.15 ( 55mm2 ) 3 prov. steel tubular pole 9 mtr. long 4 prov. steel tubular pole 8 mtr. long 5 prov. rcc muff with concrete fiiling 6 prov.x-arm: [ channel iron ( 100x50x6 mm ) , length : 2800 mm x 12 nos ] for incomer line 7 angle iron ( 75x75x6 ) [ length- 1.50 mtr + 0.02 mtr ] 8 shackle insulator ( 16 kn ) 9 d-iron ( u- clamps ) provided by hpsebl 10 prov. lt ab cable size 3 x 95+16+70 mm² 11 prov. suspension assembly 12 prov. façade hook 13 prov. anchoring assembly 14 earth knob 15 ht stay set provided by hpsebl 16 lt stay setprovided by hpsebl 17 stay wire ( 7 / 3.15 mm ) ( 6.0 kg per stay set ) provided by hpsebl 18 prov. go ab switch unit 19 prov. cable termination kit 20 full clamps [ 2 no for a.i + 1 no for stay set ] 21 lt earthing set complete 22 ht earthing set complete 23 nuts and bolts of various sizes ( galvanised / coated ) [ preferably 16 mm f or more ( with flat and spring washers ) ] 24 aluminium paint 25 transportation charges 26 erection chargesfor cond. 50mm2 27 erection chargesfor st pole 28 erection charges for ht stay set 29 erection chargeslt stay set 30 erection chargesfor earthing of poles 31 re-sagging of ht ab cable complete in all respect 32 erection charges for go switches 33 dismentalment . charges 34 quantities are mentioned above are tentative and actual quantity shall be worked out after check survey to be carried out by the successful tender and detailed engineering and finalization of tower location chart.payment shall be made as per approved bill of material / actual quantities measured at site.
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000