BRR : 12354955
Tender Brief : Urea Synthesis Reactor Urea Synthesis Reactor - Spa/2023/195/2 , Urea Synthesis Reactor , A). Designing, Engineering, Manufacturing, Supply Of Urea Synthesis Reactor Including High Efficiency Trays And Bought Out Components Along With Commissioning, Bolt Tensioning Device, Special Tools /Tackles, Delivery / Unloading At Nfl Nangal Site As Per Followings: A)-Technical Specification Of Reactor Is As Per Annexure I B)-Scope Of Supply Of Complete Reactor Is As Per Annexure Ii C)-Inspection/Testing During Construction, Fabrication Erection Plan And Tpia And Process Licenser Scope Is As Per Annexur... Read More
Tender Value
₹
Ref. Document
Submission Date
15-05-2026
Participated Bidder List
2 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics |
Work Detail
urea synthesis reactor urea synthesis reactor - spa/2023/195/2 , urea synthesis reactor , a). designing, engineering, manufacturing, supply of urea synthesis reactor including high efficiency trays and bought out components along with commissioning, bolt tensioning device, special tools /tackles, delivery / unloading at nfl nangal site as per followings: a)-technical specification of reactor is as per annexure i b)-scope of supply of complete reactor is as per annexure ii c)-inspection/testing during construction, fabrication erection plan and tpia and process licenser scope is as per annexure iii d)-drawing and documentation of complete supply shall be as per annexure iv. e)-general information (general technical requirement, commissioning spares, g/w, process performance guarantee, packing etc.) as per annexure v. f)-technical data of existing urea reactor shall be as per annexure vi g)-design basis shall be as per annexure vii h)-process performance guarantee shall be as per annexure viii i)-evaluation and comparison of bids & price reduction clause shall be as per annexure ix , supervision charges for erection, commissioning and start-up , two years mandatory spares as per annexure v (4.2 spares)
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid
Similar Tenders Results