BRR : 12159050
Click Here To View Tendering Authority. Aoc City/State :  Dibrugarh, Assam
Tender Brief : Bids Are invited for Custom Bid For Services - Hiring Of Contract Service For Short Shutdown Related Mechanical Activities Towards Opening Of Reactor And Hydrotesting Of Critical Exchange Of Lldpe/Hdpe Unit At Bcpl, Lepetkata - Short Text : Blinding & Deblinding: Hydrogen 1 #600 Long Text : Blinding & Deblinding Activity Of Hydrocarbon Feed Line For Hydrogen Service, Size 1#600 Of Reactor, Rb-400: Loosening Of Stud Bolts, Opening Of Flanges, Insertion/Removal Of Tail Blind Or Repositioning Of Spectacle Blind, Replacement Of Flange Gaskets, Box Up And Tightnening Of Stud Bolts Etc. , Short Tex... Read More
Tender Value
₹ Ref. Document
Contract Value
₹ 58,93,250.4
Submission Date
29-06-2026
Contract Date
Ref. Document
Completion Date
Ref. Document
Participated Bidder List
5 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics
2 cnet-technologies Bid Analytics
3 cnet-technologies Bid Analytics
4 cnet-technologies Bid Analytics 58,93,250.4 L1
5 cnet-technologies Bid Analytics 67,82,286 L2
Work Detail
bids are invited for custom bid for services - hiring of contract service for short shutdown related mechanical activities towards opening of reactor and hydrotesting of critical exchange of lldpe/hdpe unit at bcpl, lepetkata - short text : blinding & deblinding: hydrogen 1 #600 long text : blinding & deblinding activity of hydrocarbon feed line for hydrogen service, size 1#600 of reactor, rb-400: loosening of stud bolts, opening of flanges, insertion/removal of tail blind or repositioning of spectacle blind, replacement of flange gaskets, box up and tightnening of stud bolts etc. , short text : blinding & deblinding: pentane 2 #300 long text : blinding & deblinding activity of hydrocarbon feed line, pentane, size 2 #300, of reactor,rb-400: loosening of stud bolts, opening of flanges<(>,<)> insertion/removal of tail blind or repositioning of spectacle blind<(>,<)> replacement of flange gaskets, box up and tightening of stud bolts etc. , short text : blinding & deblinding: butene 4 #300 long text : blinding & deblinding activity of hydrocarbon feed line, butane, size 4 #300, of reactor<(>,<)> rb-400: loosening of stud bolts, opening of flanges<(>,<)> insertion/removal of tail blind or repositioning of spectacle blind<(>,<)> replacement of flange gaskets, box up and tightening of stud bolts etc.# # , short text : blinding & deblinding: ethylene 8 #600 long text : blinding & deblinding activity of hydrocarbon feed line, ethylene<(>,<)> size 8 #600; of reactor, rb-400: loosening of stud bolts<(>,<)> opening of flanges,insertion/removal of tail blind or repositioning of spectacle blind,replacement of flange gaskets, box up and tightening of stud bolts etc.# # , short text : blinding & deblinding:nitrogen 3#300 long text : blinding & deblinding activity of hydrocarbon feed lines, nitrogen,size 3 #300; of reactor, rb-400:loosening of stud bolts<(>,<)> opening of flanges,insertion/removal of tail blind or repositioning of spectacle blind<(>,<)> replacement of flange gaskets, box up and tightening of stud bolts etc.# # , short text : blinding & deblinding: silencer 6#300 long text : blinding & deblinding activity of reactor silencer pipeline<(>,<)> flange size 6 #300 of reactor, rb-400:loosening of stud bolts<(>,<)> opening of flanges<(>,<)> insertion/removal of tail blind or repositioning of spectacle blind,replacement of flange gaskets, box up and tightening of stud bolts etc.# # , short text : blinding & deblinding:36#300 i/l & o/l long text : blinding & deblinding activity of hydrocarbon inlet & outlet lines of reactor, rb-400, size 36#300: loosening of stud bolts, opening of flanges,insertion/removal of tail blind or repositioning of spectacle blind<(>,<)> replacement of flange gaskets, box up and tightening of stud bolts etc.# # , short text : manhole opening/boxup: flng size24 #300 long text : reactor manhole opening/box up, size24#300: loosening <(>&<)> removal of stud bolts,opening of manhole (with dead weight) flange ,replacement of flange gaskets, box up and tightening of stud bolts etc. (provision of davit arm available)# max. weight 256kg# # , short text : manhole opening/boxup: flng size48#300 long text : reactor manhole opening/box up, size 48#300 class: loosening <(>&<)> removal of stud bolts,opening of manhole (with dead weight) flange ,replacement of flange gaskets, box up and tightening of stud bolts etc. (provision of davit arm available) max. weight 127kg## # , short text : dropping/boxup,liquid injection nozzle long text : reactor liquid injection nozzle dropping/box up<(>,<)> size 4 #300: & 6#300 loosening & removal of stud bolts<(>,<)> dropping of component<(> ,<)> replacement of flange gaskets, lifting and positioning of the components after cleaning, box up <(>&<)> tightening of stud bolts etc. equipment weight 430kg# # , short text : dropping/boxup,catalyst injection nozzle long text : reactor catalyst injection nozzle dropping/box up, 4 #300: loosening <(>&<)> removal of stud bolts<(>,<)> dropping of component<(>,<)> replacement of flange gaskets, lifting and positioning of the components after cleaning, box up <(>&<)> tightening of stud bolts etc. equipment weight 53kg # # , short text : dropping/boxup,teal lg injection nozzle long text : reactor loop gas plus teal injection nozzle dropping/box up, 10 #300: loosening <(>&<)> removal of stud bolts,dropping of component<(> ,<)> replacement of flange gaskets, lifting and positioning of the components after cleaning, box up <(>&<)> tightening of stud bolts etc.# # , short text : dropping/boxup,dmw injection nozzle long text : reactor dm water injection nozzle dropping/box up, 0.5 #300: loosening <(>&<)> removal of stud bolts<(>,<)> dropping of component<(>,<)> replacement of flange gaskets, lifting and positioning of the components after cleaning, box up <(>&<)> tightening of stud bolts etc.# # , short text : dismantling/boxup of reactor gas cyclone long text : reactor gas cyclone<(>,<)> 117-gj-400a/b opening/boxup flange id 850mm equipment weight 3.6 ton loosening <(>&<)> removal of stud bolts ,dismantling of cone portion from hinged joint, replacement of flange gaskets, lifting and positioning of the components after cleaning, box up <(>&<)> tightening of stud bolts etc.# # , short text : dropping/boxup,reactor fines ejectors long text : reactor fines ejector,117-ja-400a/b dropping/box up equipment weight 776 kg.nozzle list: a. size: 6300#, tightening torque 160 n.m b. 4 1500#,tightening torque 500n.m c. 6 1500#<(>,<)> tightening torque 770n.m loosening & removal of stud bolts, dropping ofcomponent, replacementof flange gaskets,lifting and positioning of the components after cleaning, box up <(>&<)> tightening of stud bolts etc.# # , short text : hydrotest of exchanger, 117-ee-400 long text : hydrotest of exchanger<(>,<)> 117-ee-400, dome dropping, size/weight: inlet dome 2052mm/1572kg, outlet dome 2052mm/1728kg<(>,<)> blinding of shell side dm water inlet/outlet line 24#300, tube sheet drying, hydro testing, deblinding of shell side dm water inlet/outlet lines 24 #300, cleaning of rust/debris from the flange face, and final box up of main loop condenser (117-ee-400)# , short text : hydrotest of exchanger, 117-ee-403 long text : hydrotest of exchanger,117-ee-403 long description: dome dropping, size: inlet dome 459mm, outlet dome 459mm, blinding of shell side cooling water inlet/outlet line 4#300, tube sheet drying, hydro testing,deblinding of shell side cooling water inlet/outlet lines 4#300, cleaning of rust/debris from the flange face, and final box up of ka-401 discharge cooler(117-ee-403)# # , short text : hydrotest of exchanger, 117-ee-409 long text : dome dropping, blinding of channel side inlet/outler lines 8#600 and shell side cooling water inlet/outlet line 10#300, tube sheet drying, hydro testing, deblinding of shell side cooling water inlet/outlet lines 8 #300 and final box up of pa-409 discharge cooler (117-ee-409) , short text : hydrotest of exchanger, 117-ee-470 long text : dome dropping, blinding of shell side cooling water inlet/outlet line 3#150, tube sheet drying, hydro testing, deblinding of shell side cooling water inlet/outlet lines 3 #150 and final box up. , short text : hydrotest of exchanger, 117-ee-480 long text : dome dropping, blinding of shell side cooling water inlet/outlet line 3#150, tube sheet drying, hydro testing, deblinding of shell side cooling water inlet/outlet lines 3 #150 and final box up. , short text : hydrotest of exchanger, 117-ee-472 long text : channel inlet/outlet cooling water line opening (6 # 150), dome dropping, blinding of shell side process gas (hydrocarbon) inlet/outlet line 8#150, tube sheet drying, hydro testing of channel side after dome boxup with new gasket & blinding of cooling water inlet/outlet line (6#150) or pneumatic test of shell side after installation of test flange, deblinding of shell side process gas (hydrocarbon) inlet/outlet line 8#150 and final box up of ka-470 1st stage cooler (117-ee-472) with new set of gaskets. , short text : hydrotest of exchanger, 117-ee-473 long text : channel inlet/outlet cooling water line opening (6 # 300), dome dropping, blinding of shell side process gas (hydrocarbon) inlet/outlet line 6#300 & 4#300, tube sheet drying, hydro testing of channel side after dome boxup with new gasket & blinding of cooling water inlet/outlet line (6#300) or pneumatic test of shell side after installation of test flange, deblinding of shell side process gas (hydrocarbon) inlet/outlet line 6#300 & 4#300 and final box up of ka-470 discharge cooler (117-ee-473) with new set of gaskets , short text : hydrotest of exchanger, 117-ee-482 long text : channel inlet/outlet cooling water line opening (4 # 150), dome dropping, blinding of shell side process gas (hydrocarbon) inlet/outlet line 6#150, tube sheet drying, hydro testing of channel side after dome boxup with new gasket & blinding of cooling water inlet/outlet line (4#150) or pneumatic test of shell side after installation of test flange, deblinding of shell side process gas (hydrocarbon) inlet/outlet line 6#150 and final box up of ka-480 1st stage cooler (117-ee-482) with new set of gaskets , short text : hydrotest of exchanger, 117-ee-483 long text : channel inlet/outlet cooling water line opening (4 # 150), dome dropping, blinding of shell side process gas (hydrocarbon) inlet/outlet line 6#150, tube sheet drying, hydro testing of channel side after dome boxup with new gasket & blinding of cooling water inlet/outlet line (4#150) or pneumatic test of shell side after installation of test flange, deblinding of shell side process gas (hydrocarbon) inlet/outlet line 6#150 and final box up of ka-480 discharge cooler (117-ee-483) with new set of gaskets
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download c7ec4192-4ff6-42e1-af80-027894b92c11 result notice
Download File Name File Description
Download e6a9b35b-43dc-49da-b1da-eb0a6fb4f995 Tender Documents
Download 1780651033 Tender Documents
Download 1780651213 Tender Documents
Download 1780651448 Tender Documents
Download 1780901657 Tender Documents
Download 1780902076 Tender Documents
Download 1780902122 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000