BRR : 12031809
Tender Brief : Tender for Supply Of Slt Shackle Insulator Only , Supply Of Lt Shackle Insulator , 0.6Kva Ups , Lt Shackle Insulator Only (Quote Price For Single Unit Only) , Stay Clamp Suitable For 9.00Mtr Psc Pole , Pole Pit For 9.0M And 9.14 M Psc/Rcc / All Metal Poles (Each Pit) 1.25 X 0.6 X 1.83 Mtr , Loading/ Unloading Of Ht Polymer Insulators , Loading/ Unloading Of Lt Hardwares( Metal Parts) , Loading/ Unloading Of Ht Hardwares , Stay Pit , Loading/ Unloading Of Single Phase Meters , Loading/ Unloading Of Three Phase Meters , Loading/ Unloading Of 16 Kva Transformers , Erection Of Poles & Stays (Incl... Read More
Tender Value
₹
Ref. Document
Contract Value
₹ 3,56,360
Submission Date
25-08-2026
Contract Date
06-10-2026
Completion Date
30 days
Participated Bidder List
2 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 16.34 | L2 | |||
| 2 | cnet-technologies | Bid Analytics | 3,56,360 | L1 |
Work Detail
tender for supply of slt shackle insulator only , supply of lt shackle insulator , 0.6kva ups , lt shackle insulator only (quote price for single unit only) , stay clamp suitable for 9.00mtr psc pole , pole pit for 9.0m and 9.14 m psc/rcc / all metal poles (each pit) 1.25 x 0.6 x 1.83 mtr , loading/ unloading of ht polymer insulators , loading/ unloading of lt hardwares( metal parts) , loading/ unloading of ht hardwares , stay pit , loading/ unloading of single phase meters , loading/ unloading of three phase meters , loading/ unloading of 16 kva transformers , erection of poles & stays (including refilling of excavated earth) , loading/ unloading of 25 kva transformers , loading/ unloading of 63 kva transformers , stay set , loading/ unloading of 100 kva transformers , loading/ unloading of 200/250 kva transformers , loading/ unloading of 500 kva transformers , uncoiling of conductor drum , erection of line materials , loading/ unloading of oil drums with oil , loading/ unloading of oil drums without oil , loading/ unloading of 11kv vacuum circuit breaker , loading/ unloading of 33kv vacuum circuit breaker , loading/ unloading of 110kv vacuum circuit breaker , loading/ unloading of 11kv ab switch , loading/ unloading of 22kv ab switch , loading/ unloading of double break ab switch , loading/ unloading of 11/22kv ct / pt , loading/ unloading of 11/22kv metering set , loading/ unloading of 33kv metering set , fixing of ht pin insulator / strain disc , loading/ unloading of hvds structure materials , loading/ unloading of 11/22kv las , 22 kv pin insulator with pin , 22 kv strain disc / polymer disc with hardware , 33 kv pin insulator with pin , 33 kv pin strain disc/polymer disc with hardware , fixing of lt pin insulator with pin , lt shakle with hardware , fixing of aluminium knob , paving stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from road side to work spot] per run , upto 7/2.59 mm acsr, 7/2.50 aaac including pvc cable upto 25 sqmm , acsr 7/3.35mm & 7/ 3.15 aaac including pvc cable above 25 sqmm , acsr 7/4.09 mm , above 7/4.09 mm acsr & dog conductor , earthing wiring and connection including transporting of earth pipe and excavation of pit] , transformer structure earthing 10ft depth - 3 nos of pipe through tubes , dp earthing including all works [double side earthing] , erection of 4th earth pipe including earthing , earthing of poles , earth pit masonary work 3 nos earth pits or using 3 nos concrete tub. , replacement of detoriated earth pipe per location , concreting with mixture 1:3:6 [including all materials]. , mass concreting for centre support for 2 feet including all materials , mass concreting for pole0.6x0.6x1.25m.with coping , sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping , sleeve concreting for stay set 0.3 m & 0.75 long , erection of distribution transformer structure complete , excavation of structure pole pits 0.9 x 0.9 x 1.83 mtr , transporting of pole to pit location 2 nos. , erection of poles 2 nos , excavation of stay pit 4 nos , erection of stay set (4 sets) , mass concreting (cement:sand:jelly supplied by the contractor) 2 nos. , erection of 22 kv ab switch , ttransformer structure earthing 10ft depth - 3 nos of pipe through earth tubes , erection of top channel , bed channel [2 nos channel] erection , cross with stud for bed channel erection , erection of belting angle / hg fuse angle , erection of hg fuse set , erection of ht las with jumpering and earthing , erection of lt las with jumbering and earthing , erection of jumpering [ht side] , transformer wiring in lt side including jumpering bus bar etc. , erection lt open type fuse unit arrangement single , erection lt open type fuse unit arrangement double , painting of stru. complete excluding dt [two coat of red oxide] all metal parts(excluding cost of paint). , painting of stru. complete excluding dt [one coat alu paint, excluding cost of paint) , colour washing of 2 numbers structure pole [excluding cost of distember / snowsem] , painting name of ss at seating channel including paint. , painting of dt alone [excluding painting] with red oxide and double coating of aluminium paint. , dt metering arrangement (without materials) , erection of distribution transformer /dismantling of dt , upto 100 kva , above 100 kva and upto 250 kva , 500 kva , colour washing of reinforced cement concrete / psc poles , numbering of poles including cost of paint / loc [black background and yellow letters] , painting of sc details in the meter board / agl boxes / hut scs including paint. , service connection , transporting of required materials from road side to work spot and erection of street light fixture including wiring clamping of pipe aerial board assembling , transporting of required materials from road side to work spot and erection of 250 w s.v. lamp / mercury lamp/led yard light fitting including wiring, clamping of pipe, serial board assembling etc. , fixing of street light fitting with 2 cfl/ 4 cfl , provision of st. lt. switching arrangements including fixing meters, wiring, service board etc. , erection of hut service connection complete with / without meter including transport of 5materials from section store to work spot , erection/dismantling of metering set 11 kv / 22 kv/33 kv , fabrication works. , labour charges for alteration of back clamp / stay clamp to suitable for works. , providing of holes. , all size angles / channel upto 5/8 , all size angles / channel above 5/8 , slot holes in flat / angles / channel upto 3/4 , slot holes in flat / angles / channel above 3/4 , fabrication of centre support only for dt structure , cutting of rs joist / angles / ms channels , welding of rs joist / angles / ms channels , general , set right the leaning pole in both ht & lt [ pin point ] location , set right the leaning pole in both ht & lt [ cut point ] location , resagging of lines for all sizes cut point location , converting pin point into cut point ht lines , converting pin point into cut point lt lines , clearing tree branches of coconut tree , clearing tree branches of neem, tamarind, country tree etc., , releasing and erection 1 ph sc wire [during conductor or support change] , releasing and erection 3 ph sc wire [during conductor or support change] , destruction of pole concerting at site. , retrieving grill from detoriated pole [grill separate from damaged pole] , re earthing of structure completely including earthpipe changing if any 3nos earth pipe , re examination of dt earthing ( digging , inspection and making connection in between extg. 3nos earth pipe ) , guarding arrangement :- , cradle guarding including earthing and earth pit excavation [railway & p&t crossing ] , flat guarding with 4 wire , split netural guarding , loading and unloading : , loading of 7.5 mtr / 8.0 mtr reinforced cement concrete / psc/ metal pole [per pole ] , loading of [ 9.14 mtr ] 9.0 mtr poles reinforced cement concrete /psc pole / metal pole [ per pole ] , unloading of psc / reinforced cement concrete / metal poles , transporting from road side to workspot , transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles upto 1.0 km , transport 7.5 mtrs / 8.00 mtrs of poles including r.s.joist and rail poles above additional 1.0 km or part thereof [ certified by aee ] , transport of 9.0 mtr and above poles including r.s. joist and rail poles upto 1.0 km , transport of 9.0 mtr and above poles including r.s. joist and rail poles upto above additional 1.0 km or part thereof , transport of line materials , transport of line materials [ minimum 1 mt ] from sub stores to section pocket store or near to work spot at road side by using private vehicle or vice versa excluding loading and unloading upto 8 kms , transport of line materials [ minimum 1 mt ] from sub stores to section pocket store or near to work spot at road side by using private vehicle or vice versa excluding loading and unloading above 8 kms and for every addl. 1 km , transport of equipements , transporting of distribution transformer/metering set by using private vehicle load of one no.minimum up to 30 km , .transporting of distribution transformer/metering set by using private vehicle load of one no.minimum above 30 km for every addl .1 km , dismantling works , dismantling of 7.5m / 8.0m poles [rcc / psc] , dismantling of 9.00m / 9.14m reinforced cement concrete / psc/rail pole, tubular pole and all metal poles , dismantling stay set complete , dismantling of lt 1 ph x arm / lt/ht ti fitting , dismantling of lt/ht ti fitting , dismantling of lt 3 ph x arm , dismantling of 3[1/2] v x arm , dismantling of tapping channel and guarding x arm , dismantling of 11 kv strain disc/polymer disc with hardware , dismantling of 22 kv pin insulator with pin , dismantling of 22 kv strain disc with hardware , dismantling of 33 kv pin insulator with pin , dismantling of 33 kv strain disc with hardware , dismantling of lt pin insulator with pin , dismantling of lt shackle with hardware , dismantling of aluminium knob , dismantling of conductor 7/2.59 mm acsr, 7/2.50 aaac including pvc cable upto 25 sqmm , dismantling of conductor acsr 7/3.35mm & 7/ 3.15 aaac including pvc cable above 25 sqmm , dismantling of conductor acsr 7/4.09 mm , single phase meter &3 phase meter , fixing of single phase meter , fixing of 3 phase meter , dismantling of single phase meter , dismantling of 3 phase meter
View Original Notice/Document
Result Documents
Tender Documents
| Download | File Name | File Description |
|---|---|---|
| Download | 9e52126c-a869-4fb4-b93e-2d22dd53ab0a | technicalevaluation notice |
| Download | techsummary_836417 | document |
| Download | bf1d6876-8a5a-4e5b-b1ba-877e56e2ff67 | result notice |
| Download | boqcomparativechart | document |
| Download | boqcomparativechart | document |
| Download | RC | document |
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results