BRR : 12022092
Click Here To View Tendering Authority. Aoc City/State :  Rajkot, Gujarat
Tender Brief : Supply Of vestibule bellow complete , vestibule bellow complete (rh side) for gangway of lhb type coaches as per icf drg.no . lwsczac2-5-004, alt-nil with set of bellow securing fasteners to item nos.8, 9 & 10 (qty-04 sets) con forming to assy. drg.no.lwsczac-2-5-002 alt.f. note: a) packing condition: covered in transparent pol ythene and packed in suitable length wooden case as shown in icf drg.no.icf/sk-2-5-090 to avoid def orming of rubber bellow ring. b) material conforming to rdso spec.no. rdso/2007/cg-05(rev.1). [ w arranty period: 60 months after the date of delivery ] ] , vestibule be... Read More
Tender Value
₹ Ref. Document
Contract Value
₹ 2,92,758
Submission Date
03-09-2026
Contract Date
04-09-2026
Completion Date
Ref. Document
Participated Bidder List
1 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 2,92,758 L1
Work Detail
supply of vestibule bellow complete , vestibule bellow complete (rh side) for gangway of lhb type coaches as per icf drg.no . lwsczac2-5-004, alt-nil with set of bellow securing fasteners to item nos.8, 9 & 10 (qty-04 sets) con forming to assy. drg.no.lwsczac-2-5-002 alt.f. note: a) packing condition: covered in transparent pol ythene and packed in suitable length wooden case as shown in icf drg.no.icf/sk-2-5-090 to avoid def orming of rubber bellow ring. b) material conforming to rdso spec.no. rdso/2007/cg-05(rev.1). [ w arranty period: 60 months after the date of delivery ] ] , vestibule bellow complete (lh side) for gangway of lhb type coaches as per icf drg.no . lwsczac2-5-003, alt-nil with set of bellow securing fasteners to item nos.8,9 &10 (qty-04 set) confo rming to assy. drg. no.lwsczac-2-5-002 alt.f. note:a) packing condition: covered in transparent polyt hene and packed in suitable length wooden case as shown in icf drg.no.icf/sk-2-5-090 to avoid defor ming of rubber bellow ring. b) material conforming to rdso spec.no. rdso/2007/cg- 05(rev.1). [ war ranty period: 60 months after the date of delivery ] ] , vestibule bellow top complete for gangway of lhb type coaches as per icf drg.no.lws czac-2- 5-005, alt-nil with set of bellow securing fasteners to item nos.8,9 &10 (qty-09 set) conformi ng to assy. drg.no.lwsczac-2-5-002 alt.f. note: a) packing condition: covered in transparent polythe ne and packed in suitable length wooden case as shown in icf drg.no.icf/sk-2-5-090. b) material conf orming to rdso specn.no.rdso/2007/cg05(rev.-1). [ warranty period: 60 months after the date of delivery ] ]
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download d33eeba3-2029-47e8-9840-b8d67fdb336d result notice
Download File Name File Description
Download 7eb46cc6-55af-49a5-a46d-045e4cf15006 Tender Documents
Download assamblydrg Tender Documents
Download LHdrg Tender Documents
Download packagingdrg Tender Documents
Download RHdrg Tender Documents
Download specifications Tender Documents
Download TOPdrg Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000
Similar Tenders Results