BRR : 11902692
Click Here To View Tendering Authority. Technical Bid City/State :  Barmer, Rajasthan
Tender Brief : Tender For Annual Rate Contract For Repairing Of Various Sizes And Make Pipe Line Leakages Under Sub Dn Siwana- 1 (Rate Are Exclusitve Of Gst In All Item) Repairing Of Leakage In Existing Distribution/Rising Main/Transmission Main Ac/Pvc/Hdpe Pipe Line Up To 1.5 Mtr Depth Of Sizes As Given Below By Digging Out Suitable Size Of Pit At Site Of Work Including Taking Out The Burst Pipe From Trench, Dewatering And Providing Adequate Safety Arrangement At Site. This Will Also Include Cutting Of Pipe Ends, Fixing Of Pipe Piece With Jointing Material, Tightening Of Cid Joints To Make Repair Leak Proo... Read More
Tender Value
20,00,000
Submission Date
17-08-2026
Participated Bidder List
3 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics
2 cnet-technologies Bid Analytics
3 cnet-technologies Bid Analytics
Work Detail
tender for annual rate contract for repairing of various sizes and make pipe line leakages under sub dn siwana- 1 (rate are exclusitve of gst in all item) repairing of leakage in existing distribution/rising main/transmission main ac/pvc/hdpe pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. this will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of cid joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own t&p & labour and will arrange transportation of material required from jen store. (required material such as pipe piece, cid joints shall be provided by department free of cost) in all type soil ac/pvc/hdpe pipe 50/63/75mm 2 80/90mm 3 100/110mm 4 125/140mm 5 150/160/180mm 6 200/225mm 7 250/280mm 8 300/315mm 9 350mm 10 400mm 11 add on above item no. 1.1.1 for b.t. road 12 add on above item no. 1.1.1 for c.c. road. pit in cc road shall be cut in optimum size through cc cutter machine only. 13 add on above no. 1.1.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 14 add on above no. 1.1.1 item if depth of pipeline is above 3.0 mtr. 15 repairing of leakage in existing distribution/rising main/transmission main ci/ms/di pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. this will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of cid joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own t&p & labour and will arrange transportation of material required from jen store. (required material such as pipe piece, cid joints shall be provided by department free of cost) in all type soil - 80 mm 16 100mm 17 125mm 18 150mm 19 200mm 20 250mm 21 300mm 22 350mm 23 400mm 24 add on above item no. 1.2.1 for b.t. road 25 add on above item no. 1.2.1 for c.c. road. pit in cc road shall be cut in optimum size through cc cutter machine only. 26 add on above no. 1.2.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 27 add on above no. 1.2.1 item if depth of pipeline is above 3.0 mtr. 28 minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing distribution/rising main/transmission main ac/pvc/hdpe/ci/ms/di pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own t&p & labour and will arrange transportation of required material from store. (required material such as lead wool, white hump, plugs, clamps etc. shall be provided by department free of cost) in all type soil 50/63/75mm 29 80/90mm 30 100/110mm 31 125/140mm 32 150/160/180mm 33 200/225mm 34 250/280mm 35 300/315mm 36 350mm 37 400mm 38 add on above item no. 1.3.1 for b.t. road 39 add on above item no. 1.3.1 for c.c. road.pit in cc road shall be cut in optimum size through cc cutter machine only. 40 add on above no. 1.3.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 41 add on above no. 1.3.1 item if depth of pipeline is above 3.0 mtr. 42 replacement of ci/ di double flange sluice valves,non return valves,butter fly valves etc. in existing distribution/rising main/transmission main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing ms nut and bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own t&p & labour and will arrange transportation of required material from store. (required material such as valve, tail piece, cid joints etc. shall be provided by department free of cost) in all type soil - 80 mm 43 100 mm 44 125 mm 45 150 mm 46 200 mm 47 250 mm 48 300 mm 49 350 mm 50 400 mm 51 add on above item no. 1.4.1 for b.t. road 52 add on above item no. 1.4.1 for cc road.pit in cc road shall be cut in optimum size through cc cutter machine only. 53 add on above item no. 1.4.1 if depth of pipe line is above 1.5 mtr to 3.0 mtr 54 deduct on above item no. 1.4.1 if valve is fixed at plinth level / platform i.e. no excavation is required 55 removal of choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing distribution/rising main/transmission main ac/pvc/hdpe/upvc pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. this will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own t&p & labour and will arrange transportation of required material from store. (required material such as pipe piece cid joints shall be provided by department free of cost)as per satisfaction of eic. rates for per pit. in all type soil 75 mm 56 90/80 mm 57 110/100 mm 58 140/125 mm 59 180/160/150 mm 60 225/200 mm 61 250 mm 62 300 mm 63 add on above item no. 1.5.1 for b.t. road 64 add on above item no. 1.5.1 for cc road. pit in cc road shall be cut in optimum size through cc cutter machine only. 65 add on above item no. 1.5.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 66 add on above item no. 1.5.1 if depth of pipe line is above 3.0 mtr. 67 removal of choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing distribution/rising main/transmission main ci/ms/di pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. this will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own t&p & labour and will arrange transportation of required material from store. (required material such as pipe piece cid joints shall be provided by department free of cost)as per satisfaction of eic. rates for per pit.in all type soil 80 mm 68 100 mm 69 125 mm 70 150 mm 71 225/200 mm 72 250 mm 73 300 mm 74 add on above item no. 1.6.1 for b.t. road 75 add on above item no. 1.6.1 for cc road. pit in cc road shall be cut in optimum size through cc cutter machine only. 76 add on above item no. 1.6.1 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. 77 add on above item no. 1.6.1 if depth of pipe line is above 3.0 mtr 78 disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own t&p & labour. 79 add on above item no. 1.7 for b.t. road 80 add on above item no. 1.7 for cc road. pit in cc road shall be cut in optimum size through cc cutter machine only. 81 add on above item no. 1.7 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 82 removal of sluice valve in existing pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. this will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own t&p & labour and will arrange transportation of required material from store. (required material such as pipe piece cid joints shall be provided by department free of cost) in all type soil 80 mm dia pipe to 100mm 83 125 mm dia pipe to 150mm 84 200 mm dia pipe to 250mm 85 300 mm dia pipe to 350mm 86 add on above item no. 1.8.1 for b.t. road 87 add on above item no. 1.8.1 for cc road pit in cc road shall be cut in optimum size through cc cutter machine only. 88 add on above item no. 1.8.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 89 work of inter connection in ac/pvc/hdpe pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of tee (complete) and other specials to make inter connection repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own t&p & labour and will arrange transportation of material required from store. (material such as tee/ tee clamp/rubber sheet/ cid joints required for inter connection shall be provided by the department free of cost). in all type soil 80 mm to 110 mm 90 125 mm to 165 mm 91 200 mm to 300 mm 92 add on above item no. 1.9.1 for b.t. road 93 add on above item no. 1.9.1 for cc road.pit in cc road shall be cut in optimum size through cc cutter machine only. 94 add on above item no.1.9.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 95 work of inter connection in ci/di/ms pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of tee (complete) and other specials to make inter connection repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own t&p & labour and will arrange transportation of material required from store. (material such as tee/ tee clamp/rubber sheet/ cid joints required for inter connection shall be provided by the department free of cost). in all type soil 80 mm to 100 mm 96 125 mm to 150 mm 97 200 mm to 300 mm 98 350 mm to 450 mm 99 add on above item no.1.10.1 for b.t. road 100 add on above item no.1.10.1 for cc road. pit in cc road shall be cut in optimum size through cc cutter machine only. 101 add on above item no.1.10.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 102 labour charges for removal of complaint of polluted water supply to the consumers - survey of the locality of polluted water supply for preliminary assessment of source of pollution during supply hours 103 labour charges for digging of pit of suitable size for removal of water pollution on existing distribution ac/pvc/upvc/hdpe pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. the rate includes all labour charges to complete the work for pipe size in all type soil 50 to 75 mm 104 80-110 mm 105 125 to 165 mm 106 200 to 300 mm 107 350 to 400 mm 108 add on above item no.1.12.1 for b.t. road 109 add on above item no.1.12.1 for cc road.pit in cc road shall be cut in optimum size through cc cutter machine only. 110 add on above item no. 1.12.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 111 labour charges for digging of pit of suitable size for removal of water pollution on existing distribution ci/di/ms pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. the rate includes all labour charges to complete the work for pipe size in all type soil 80-100 mm 112 125 to 150 mm 113 200 to 300 mm 114 350 to 450 mm 115 add on above item 1.13.1 for b.t. road 116 add on above item no. 1.13.1 for cc road.pit in cc road shall be cut in optimum size through cc cutter machine only. 117 add on above item no.1.13.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 118 restoration of bitumen road by patch work of wbm using crushed / broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material , cleaning of surface of wbm and providing of seal & tack coat as per site condition by using ready cold mix up to the satisfaction of engineer in charge. the rate includes the making of pit in regular shape, all labour, material and t&p charge complete job.
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download cf75c31b-e5fb-434a-899c-7e59f44f86dd technicalevaluation notice
Download techsummary_1038889 document
Download File Name File Description
Download 47f0ed8f-1831-4e3a-9854-b580625d4749 Tender Documents
Download BOQ_1038889 Tender Documents
Download Tendernotice_1 (33) Tender Documents
Download 001 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

Technical Evaluation In Progress

Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.

TechnicalBid
Similar Tenders Results
TenderDetail
Loading tenders