BRR : 11870728
Click Here To View Tendering Authority. Price Bid City/State :  Dhule, Maharashtra
Tender Brief : Repairing the citys streetlights and high mast EESL company under the Varwade Nagar Parishad Electricity Department of Dondai and also carrying out labor-related electrical works in the Electricity Department (excluding decorative lights).; 1 Laying and Jointing PVC Pipe. Heading 2 Removing light faults (removing line charge, putting spacers on wires, connecting burnt jumpers, installing shackles, connecting incoming and outgoing connections.) 3 Turning on and off decorative lights in the city and the entire city including the house in the Don.V.N.P. area. 4 Working by climbing on poles. (If ... Read More
Tender Value
Ref. Document
Submission Date
07-08-2025
Participated Bidder List
3 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 15,075 L3
2 cnet-technologies Bid Analytics 10,240 L1
3 cnet-technologies Bid Analytics 12,230 L2
Work Detail
repairing the citys streetlights and high mast eesl company under the varwade nagar parishad electricity department of dondai and also carrying out labor-related electrical works in the electricity department (excluding decorative lights).; 1 laying and jointing pvc pipe. heading 2 removing light faults (removing line charge, putting spacers on wires, connecting burnt jumpers, installing shackles, connecting incoming and outgoing connections.) 3 turning on and off decorative lights in the city and the entire city including the house in the don.v.n.p. area. 4 working by climbing on poles. (if the lights are off, removing carbon, replacing the off lights, making connections.) 5 installing lights on poles with calm brackets. 6 installing cables on poles. (wage per min.) 7 installing conductors (wires) on poles. (wage per meter) 8 installing mcb. 9 installing main switch with connection. 10 installing lugs in main switch. 11 installing phase in main switch. 12 installing light on divider pole. 13 fitting light on divider pole. 14 connecting f.r.p. box on divider pole. 15 removing carbon from light on 12.5 m high mast. labor per light 16 installing light on 12.5 m high mast. labor per light 17 removing carbon from light on 9 m high mast. labor per light 18 installing light on 9 m high mast. labor per light 19 installing fan. 20 fitting full pipe 21 fitting half pipe 22 fitting power pipe 23 earth pipe 24 installing electric board. 25 installing tube light. 26 removing new electrical connection.
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 03ae8bd9-3106-4c7f-8e2f-1a4de391cede financialevaluation notice
Download boqcomparativechart document
Download finance_2085119 document
Download boqcomparativechart document
Download finance_2085119 document
Download finsummary_2085119 document
Download technical_2085119 document
Download techsummary_2085119 document
Download File Name File Description
Download 8e1785b2-ab61-4efe-80e7-fc9f5eb8b333 Tender Documents
Download BOQ_2085119 Tender Documents
Download Tendernotice_1 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

Financial Evaluation In Progress

Financial bids are currently under review. Awarded bidder information will be published after final evaluation.

PriceBid
Similar Tenders Results
TenderDetail
Loading tenders