BRR : 11752816
Click Here To View Tendering Authority. Aoc City/State :  Obra, Uttar Pradesh
Tender Brief : Bids Are invited for Motor Shifting And Sg Overhauling Of Chp Btps Obra Motor Shifting Up To 30 Kw , Motor Shifting V.F. Motor , Motor Shifting 31Kw To 70Kw , Motor Shifting 71Kw To 199Kw , Motor Shifting 200Kw 6.6 Kv , Motor Shifting 525Kw 6.6 Kv , Motor Shifting 1250Kw, 6.6Kv Stator And Rotor , Overhauling Of Motor Up To 30Kw Motor , Overhauling Of Motor V.F. Motor , Overhauling Of Motor 31Kw To 70Kw , Overhauling Of Motor 71Kw To 199Kw , Overhauling Of Motor 200Kw 6.6 Kv , Overhauling Of Motor 525Kw 6.6 Kv , Shifting Of Boxed Motor Up To 30Kw Motor , Shifting Of Boxed Motor 31Kw To 70Kw , ... Read More
Tender Value
23,10,743
Contract Value
₹ 28,58,731.72
Saving / Difference
₹ -5,47,989 ▼
Submission Date
11-06-2026
Contract Date
Ref. Document
Completion Date
Ref. Document
Participated Bidder List
3 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 28,58,731.72 L1
2 cnet-technologies Bid Analytics 30,17,562.08 L3
3 cnet-technologies Bid Analytics 29,64,610.76 L2
Work Detail
bids are invited for motor shifting and sg overhauling of chp btps obra motor shifting up to 30 kw , motor shifting v.f. motor , motor shifting 31kw to 70kw , motor shifting 71kw to 199kw , motor shifting 200kw 6.6 kv , motor shifting 525kw 6.6 kv , motor shifting 1250kw, 6.6kv stator and rotor , overhauling of motor up to 30kw motor , overhauling of motor v.f. motor , overhauling of motor 31kw to 70kw , overhauling of motor 71kw to 199kw , overhauling of motor 200kw 6.6 kv , overhauling of motor 525kw 6.6 kv , shifting of boxed motor up to 30kw motor , shifting of boxed motor 31kw to 70kw , shifting of boxed motor 71kw to 199kw , shifting of boxed motor 200kw 6.6 kv , shifting of boxed motor 525kw 6.6 kv , removal of sheared bolt from motor 31kw to 70kw , removal of sheared bolt from motor 71kw to 199kw , weight adjustment of v.f. motor , cleaning of crusher motor 525kw, 6.6kv , cleaning of crusher motor 1250kw 6.6kv , checking of crusher motor air gap of 1250kw 6.6kv , shifting of cooler of 525kw, 6.6kv motor , replacement of bearing of 71kw to 199kw 0.4kv motor drive end , replacement of bearing of 71kw to 199kw 0.4kv motor non drive end , replacement of bearing of 200kw 6.6kv motor drive end , replacement of bearing of 200kw 6.6kv motor non drive end , replacement of bearing of 525kw 6.6kv motor drive end , replacement of bearing of 525kw 6.6kv motor non drive end , shifting of suspension magnet as per scope 8.5 kw, 18kw weight 5 ton approx. , minor repairing work of chp - minor repairing of motor cover and foundation, lighting control panel, metal detector, panel cover, otls, screw pad, structure stairs, pull chord and box cover pusher arms etc. by way of cutting welding of chp a b tps, obra , overhauling,servicing of coal handling control room switch gear section a main bus chp a , overhauling,servicing of coal handling control room switch gear section a breaker ic, og, a chp , overhauling,servicing of coal handling control room switch gear section apanels chp a , overhauling,servicing of coal handling control room switch gear section a russian control modules chp a , overhauling, servicing of coal handling control room switch gear section b main bus chp a , overhauling,servicing of coal handling control room switch gear section b breaker ic, og, chp a , overhauling,servicing of coal handling control room switch gear section b panels chp a , overhauling,servicing of coal handling control room switch gear section b russian control modules chp a , overhauling,servicing of coal handling main building transfer point switch gear main bus transfer point section a, chp a , overhauling,servicing of coal handling main building transfer point of panels, chp a , overhauling,servicing of coal handling main building transfer point of russian control modules, chp a , overhauling,servicing of coal handling main building transfer point of switch gear main bus transfer point section. b, chp a , overhauling, servicing of coal handling main building transfer point of panels, chp a. , overhauling,servicing of coal handling main building transfer point of russian control modules, chp a , overhauling,servicing of wagon tippler, switch gear electrical wagon pusher sg room of russian breaker. , overhauling,servicing of wagon tippler, switch gear electrical wagon pusher sg room of russian resistance boxes a chp. , overhauling,servicing of wt sg sg room of wagon tippler resistance boxes, a chp. - overhauling,servicing of wagon tippler, switch gear electrical wagon pusher sg room of wagon tippler resistance boxes, a chp. , overhauling,servicing of 0.4 kv swg sectiona, b, c, fhd swg section a, b and old and new stacker, reclaimer switch gear of chp a - overhauling,servicing of 0.4 kv switching bus duct section of coal handling control room swg sectiona, section b, section c, fuel handling control room swg section a, section b and old and new stacker, reclaimer switch gear of chp a , overhauling, servicing of l.t. modules,panel of breaker ,ic coupler of chp, control room of bchp , overhauling,servicing of lt modules panel of breaker ,og feeder of chp, control room of bchp , overhauling,servicing of lt modules,panel of breaker , ic coupler of fuel handling control room of bchp , overhauling,servicing of lt modules,panel of breaker ,og feeder of fuel, control room of bchp , overhauling,servicing of old stacker re claimer panel , overhauling,servicing of old stacker reclaimer resistance box of bchp , overhauling,servicing of old stacker reclaimer control panel of bchp , overhauling,servicing of new stacker reclaimer panel , overhauling,servicing of newstacker reclaimer resistance box of bchp , overhauling,servicing of newstacker reclaimer control panel of bchp , servicing,overhauling and breakdown maintenances of mimic plant of chp. , overhauling ,servicing of tippler switch gear of b chp. , overhauling,servicing of wagon tippler room operator panel on off of bchp , overhauling,servicing of wagon tippler room incoming power panel of bchp , overhauling,servicing of wagon tippler room control modules of bchp , overhauling or servicing of wagon tippler room resistance box of bchp , overhauling or servicing of wagon tippler screw pad overhauling of bchp. , overhauling or servicing of wagon tippler over travel limit switch otls overhauling of bchp. , overhauling or servicing of wagon tippler mcc panel of tipper 11a, 11b, 12a, 12b of bchp. total quantity : 1982
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 5421ca8e-4ef5-4cec-93f8-4f3e48b17925 result notice
Download File Name File Description
Download 3b8554b9-14c8-4005-9316-329284457895 Tender Documents
Download 9371251_Boq_1 Tender Documents
Download tsd_2026-05-23-12-50-16_807a8322d14101163545dbbba2b2df25 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000
Similar Tenders Results
TenderDetail
Loading tenders