BRR : 11350032
Tender Brief : Tender for Supply Installation Testing and Commissioning of Data Center Infrastructure At Cial. , Precision Air Conditioning System (13 Tr) At Data Centre 2 (Terminal 3) , Supply Of Pac( 13 Tr) As Per Tender Spec , Itc Of Pac( 13 Tr) As Per Tender Spec , Supply Of Lowside Works For Pac( 13 Tr) , Itc Of Lowside Works For Pac( 13 Tr) , Dismantling Of Existing Pacs, Including Outdoor Units , Precision Air Conditioning System (6 Tr) At Dr (Atc Building) , Supply Of Pac( 6 Tr) As Per Tender Spec , Itc Of Pac( 6 Tr) As Per Tender Spec , Supply Of Lowside Works For Pac( 6 Tr) , Itc Of Lowside Works ... Read More
Tender Value
₹
3,75,00,000
Submission Date
01-06-2026
Participated Bidder List
2 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics |
Work Detail
tender for supply installation testing and commissioning of data center infrastructure at cial. , precision air conditioning system (13 tr) at data centre 2 (terminal 3) , supply of pac( 13 tr) as per tender spec , itc of pac( 13 tr) as per tender spec , supply of lowside works for pac( 13 tr) , itc of lowside works for pac( 13 tr) , dismantling of existing pacs, including outdoor units , precision air conditioning system (6 tr) at dr (atc building) , supply of pac( 6 tr) as per tender spec , itc of pac( 6 tr) as per tender spec , supply of lowside works for pac( 6 tr) , itc of lowside works for pac( 6 tr) , dismantling of existing pacs, including outdoor units , intelligent power distribution unit(ipdu) , supply of ipdu as per tender spec , itc of ipdu as per tender spec , equipment rack and tap-off boxes , supply installation testing and commissioning of equipment rack (42 u) , supply installation testing and commissioning of tap-off boxes , very early smoke detection apparatus(vesda) system in a data centres , supply of vesda system for dc 1 & dc 2 , itc of vesda system for dc 1 & dc 2 , supply of vesda system for dr , itc of vesda system for dr , water leak detection system in a data centres , supply of water leak detection system for dc 1 & dc 2 , itc of water leak detection systemfor dc 1 & dc 2 , supply of water leak detection system for dr , itc of water leak detection system for dr , air purification system in a data centres , supply of air purification system for dc 1, dc 2 & dr , itc of air purification system , data centre infrastructure management (dcim) system , supply of dcim hardware , itc of dcim hardware , supply of dcim software , itc of dcim software , supply installation testing and commissioning of monitoring nodes with license , fire alarm & suppression systems for dc 1 & dc 2 , supply installation testing and commissioning of gas release panel , supply installation testing and commissioning of cylinder(80 litre) , supply installation testing and commissioning of clean agent , supply installation testing and commissioning of master multi cylinder kit , supply installation testing and commissioning of slave cylinder kit , supply installation testing and commissioning of manifold assembly , supply installation testing and commissioning of non-return valves (nrvs) , supply installation testing and commissioning of pressure switch , supply installation testing and commissioning of abort switch , supply installation testing and commissioning of manual release switch , supply installation testing and commissioning of conventional multi detector , supply installation testing and commissioning of response indicator , supply installation testing and commissioning of hooter cum strobe , supply installation testing and commissioning of copper armoured cable , supply installation testing and commissioning of cylinder strap , miscellaneous items(like sign stickers, packing charges & modification of existing of ms seamless pipe) , fire alarm & suppression systems for dr , supply installation testing and commissioning of gas release panel , supply installation testing and commissioning of cylinder(80 litre) , supply installation testing and commissioning of clean agent , supply installation testing and commissioning of master multi cylinder kit , supply installation testing and commissioning of slave cylinder kit , supply installation testing and commissioning of manifold assembly , supply installation testing and commissioning of non-return valves (nrvs) , supply installation testing and commissioning of pressure switch , supply installation testing and commissioning of abort switch , supply installation testing and commissioning of manual release switch , supply installation testing and commissioning of conventional multi detector , supply installation testing and commissioning of response indicator , supply installation testing and commissioning of hooter cum strobe , supply installation testing and commissioning of copper armoured cable , supply installation testing and commissioning of cylinder strap , miscellaneous items(like sign stickers, packing charges & modification of existing of ms seamless pipe) , buy back of existing pacs and fire suppression system at dc 2 and dr. , comprehensive annual maintenance contract for 2 years, inclusive of spares and accessories. annual maintenance contract starts after the warranty period of 5 year. all amounts in rs are inclusive of all taxes, levies, transportation, etc. , 1st year manpower charges , 2nd year manpower charges , 3rd year manpower charges , 4th year manpower charges , 5th year manpower charges , 6th year manpower charges , 7th year manpower charges , 1st year maintenance charges , 2nd year maintenance charges , 3rd year maintenance charges , 4th year maintenance charges , 5th year maintenance charges , 6th year camc , 7th year camc
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid
Similar Tenders Results