BRR : 11241684
Tender Brief : Tender for Dismantling Existing Plaster Including Disposal Of Refuse As Directed By Engineer -In-Charge Within A Distance Of 50 Meters. , Dismcntling Brick Work Or Stone Work In Lime Or Cement Mortar And Including Stacking Of Materials As Directed By Engineer -In-Charge Within A Distance Of 50 Meters (200 Feet) , Class M -150 (Non Modular ) Boundary Wall In 1:4 Cement And Fine Sand Motar In Super Structure Above Plinth Level Upto Floor Five Level Including Supply Of All Materials , Labour And T & P Etc. Required For Propper Completion Of The Work. , 12 Ram Cement Plaster With Cement Motar In ... Read More
Tender Value
₹
Ref. Document
Submission Date
22-04-2026
Participated Bidder List
12 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | |||||
| 3 | cnet-technologies | Bid Analytics | |||||
| 4 | cnet-technologies | Bid Analytics | |||||
| 5 | cnet-technologies | Bid Analytics | |||||
| 6 | cnet-technologies | Bid Analytics | |||||
| 7 | cnet-technologies | Bid Analytics | |||||
| 8 | cnet-technologies | Bid Analytics | |||||
| 9 | cnet-technologies | Bid Analytics | |||||
| 10 | cnet-technologies | Bid Analytics | |||||
| 11 | cnet-technologies | Bid Analytics | |||||
| 12 | cnet-technologies | Bid Analytics |
Work Detail
tender for dismantling existing plaster including disposal of refuse as directed by engineer -in-charge within a distance of 50 meters. , dismcntling brick work or stone work in lime or cement mortar and including stacking of materials as directed by engineer -in-charge within a distance of 50 meters (200 feet) , class m -150 (non modular ) boundary wall in 1:4 cement and fine sand motar in super structure above plinth level upto floor five level including supply of all materials , labour and t & p etc. required for propper completion of the work. , 12 ram cement plaster with cement motar in proportion of 1:4 cement & fine sand (not less than in 1.25 fm) of single coat for interior plastering up to floor to level including internal rounded angles chamfers , and rounded angles not exceeding 80 mm. in girth and finished even and smooth , scrapping colour washing or white washing including all complete of work. , painting with single colour paint including all complete of work. , painting with synthetic enamel paint of approved brand and manufacture to give an even shade two or more coats on new work 7 including cost of all materials , supply of all material. labour, , finishing walls with putty approved quality etc all complete work , finishing wall with primer etc all complete work. , artistic painting on walls with multicolour 1 paint etc all comjete work , finishing walls with (apex) paint etc all complete work , dismantling existing plaster including disposal of refuse as directed by engineer -in-charge within a distance of 50 meters. , dismcntling brick work or stone work in lime or cement mortar and including stacking of materials as directed by engineer -in-charge within a distance of 50 meters (200 feet) , class m -150 (non modular ) boundary wall in 1:4 cement and fine sand motar in super structure above plinth level upto floor five level including supply of all materials , labour and t & p etc. required for propper completion of the work. , 12 ram cement plaster with cement motar in proportion of 1:4 cement & fine sand (not less than in 1.25 fm) of single coat for interior plastering up to floor to level including internal rounded angles chamfers , and rounded angles not exceeding 80 mm. in girth and finished even and smooth , scrapping colour washing or white washing including all complete of work. , painting with single colour paint including all complete of work. , painting with synthetic enamel paint of approved brand and manufacture to give an even shade two or more coats on new work 7 including cost of all materials , supply of all material. labour, , finishing walls with putty approved quality etc all complete work , finishing wall with primer etc all complete work. , artistic painting on walls with multicolour 1 paint etc all comjete work , finishing walls with (apex) paint etc all complete work
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid
Similar Tenders Results