BRR : 11177216
Tender Brief : Tender For Special Repair For Roads In Rural Road Maintenance Scheme-2025 - 26Roads Work (4 Nos.) In Nilakottai Block Of Dindigul District.; 1. Special Repair ofAppinaickanpatty to Selvenagarroadin KodanginaiyakkanpattyPanchayatKm 0/000 - 2/200(R - 225) (PUR)Estimate amount : Rs. 7.00 Lakhs 2 A.Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on ... Read More
Tender Value
₹
18,80,000
Contract Value
₹ 18,53,777.84
Saving / Difference
₹ 26,222
▲
Submission Date
27-10-2025
Contract Date
26-05-2026
Completion Date
270 days
Participated Bidder List
2 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 18,53,777.84 | L2 | |||
| 2 | cnet-technologies | Bid Analytics | 18,53,777.84 | L1 |
Work Detail
tender for special repair for roads in rural road maintenance scheme-2025 - 26roads work (4 nos.) in nilakottai block of dindigul district.; 1. special repair ofappinaickanpatty to selvenagarroadin kodanginaiyakkanpattypanchayatkm 0/000 - 2/200(r - 225) (pur)estimate amount : rs. 7.00 lakhs 2 a.providing and laying spreading and compacting graded stone aggregate to wet mix macadam(wmm) 250 mm thick, including premixing the material with water at omc in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in subbase/base course on well prepared surface and compacting with vibratory soil compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of morth rev-5 3 km 0/0 -2/200 4 advance patch work for making up the undulation in the existing b.tsurface to an average thickness ofof 50mm using 45mm irc size hbg metal 5 km 0/0 -1/000 6 km 1/0 -2/000 7 km 2/0 -2/200 8 providing and laying of prime coat using emulsion at the rate of 7 kg per ten square meter over the wmm surface preparatory to another bituminous construction over it. 9 km 0/0 -2/200 10 providing and laying tack coat over wmm surface(treated with primer) using 2.5kg of bitumen emulsion rs-1for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., 11 km 0/0 -2/200 12 applying tack coat over bt surface (not treated with primer) using 3kg of bituminous emulsion per 10 sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. 13 km 0/0 -2/200 14 providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm irc size hbg machine crushed chips and 0.09 cum of 11.20mm irc hbg machine crushed chips with 14.60kg of bitumen for 10 sqm. of premix carpet including laying of seal coat a over the premix carpet using 0.09 cum of 6.70mm irc size hbg machine crushed chips with 9.80kg of bitumen per 10 sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rollingseparately as per most specification 509 and 513 (iii revision) including all labour charges hire and fuel charges formini hot mix plant, power roller 80-100kn capacity and all other tools and plants employed therefor etc.com. 15 km 0/0 -1/000 16 km 1/0 -2/000 17 km 2/0 -2/200 18 provision for information board 19 gst amount for providing service to government contract works for the above construction & maintenance works. { gst amount is the total gst amount for overall quoted amount (both construction and maintenance) above this row in column bb for all works in this package} 20 name of the work : 2. special repair ofthoppupatty - thottampatty road in kodanginaiyakkanpattypanchayatkm 0/000 - 1/300(r - 120) (vpr)estimate amount : rs. 4.70 lakhs 21 a.providing and laying spreading and compacting graded stone aggregate to wet mix macadam(wmm) 250 mm thick, including premixing the material with water at omc in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in subbase/base course on well prepared surface and compacting with vibratory soil compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of morth rev-5 22 km 0/0 -1/300 23 advance patch work for making up the undulation in the existing b.tsurface to an average thickness ofof 50mm using 45mm irc size hbg metal 24 km 0/0 -1/000 25 km 1/0 -1/300 26 providing and laying of prime coat using emulsion at the rate of 7 kg per ten square meter over the wmm surface preparatory to another bituminous construction over it. 27 km 0/0 -1/300 28 providing and laying tack coat over wmm surface(treated with primer) using 2.5kg of bitumen emulsion rs-1for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., 29 km 0/0 -1/300 30 applying tack coat over bt surface (not treated with primer) using 3kg of bituminous emulsion per 10 sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. 31 km 0/0 -1/300 32 providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm irc size hbg machine crushed chips and 0.09 cum of 11.20mm irc hbg machine crushed chips with 14.60kg of bitumen for 10 sqm. of premix carpet including laying of seal coat a over the premix carpet using 0.09 cum of 6.70mm irc size hbg machine crushed chips with 9.80kg of bitumen per 10 sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rollingseparately as per most specification 509 and 513 (iii revision) including all labour charges hire and fuel charges formini hot mix plant, power roller 80-100kn capacity and all other tools and plants employed therefor etc.com. 33 km 0/0 -1/000 34 km 1/0 -1/300 35 provision for information board 36 gst amount for providing service to government contract works for the above construction & maintenance works. { gst amount is the total gst amount for overall quoted amount (both construction and maintenance) above this row in column bb for all works in this package} 37 name of the work : 3. special repair ofkurumbapatty to kombukaranpatty road in koovanuthupanchayatkm 0/000 - 1/000(r -154 ) (pur)estimate amount : rs. 3.60 lakhs 38 a.providing and laying spreading and compacting graded stone aggregate to wet mix macadam(wmm) 250 mm thick, including premixing the material with water at omc in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in subbase/base course on well prepared surface and compacting with vibratory soil compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of morth rev-5 39 km 0/0 -1/000 40 advance patch work for making up the undulation in the existing b.tsurface to an average thickness ofof 50mm using 45mm irc size hbg metal 41 km 0/0 -1/000 42 providing and laying of prime coat using emulsion at the rate of 7 kg per ten square meter over the wmm surface preparatory to another bituminous construction over it. 43 km 0/0 -1/300 44 providing and laying tack coat over wmm surface(treated with primer) using 2.5kg of bitumen emulsion rs-1for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., 45 km 0/0 -1/000 46 applying tack coat over bt surface (not treated with primer) using 3kg of bituminous emulsion per 10 sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. 47 km 0/0 -1/000 48 providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm irc size hbg machine crushed chips and 0.09 cum of 11.20mm irc hbg machine crushed chips with 14.60kg of bitumen for 10 sqm. of premix carpet including laying of seal coat a over the premix carpet using 0.09 cum of 6.70mm irc size hbg machine crushed chips with 9.80kg of bitumen per 10 sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rollingseparately as per most specification 509 and 513 (iii revision) including all labour charges hire and fuel charges formini hot mix plant, power roller 80-100kn capacity and all other tools and plants employed therefor etc.com. 49 km 0/0 -1/000 50 provision for information board 51 gst amount for providing service to government contract works for the above construction & maintenance works. { gst amount is the total gst amount for overall quoted amount (both construction and maintenance) above this row in column bb for all works in this package} 52 name of the work : 4. special repair ofsankarapuram village roadin silukkuvarpattypanchayatkm 0/000 - 1/000(r - 37) (vpr)estimate amount : rs. 3.50 lakhs 53 a.providing and laying spreading and compacting graded stone aggregate to wet mix macadam(wmm) 250 mm thick, including premixing the material with water at omc in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in subbase/base course on well prepared surface and compacting with vibratory soil compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of morth rev-5 54 km 0/0 -1/000 55 advance patch work for making up the undulation in the existing b.tsurface to an average thickness ofof 50mm using 45mm irc size hbg metal 56 km 0/0 -1/000 57 providing and laying of prime coat using emulsion at the rate of 7 kg per ten square meter over the wmm surface preparatory to another bituminous construction over it. 58 km 0/0 -1/300 59 providing and laying tack coat over wmm surface(treated with primer) using 2.5kg of bitumen emulsion rs-1for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., 60 km 0/0 -1/000 61 applying tack coat over bt surface (not treated with primer) using 3kg of bituminous emulsion per 10 sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. 62 km 0/0 -1/000 63 providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm irc size hbg machine crushed chips and 0.09 cum of 11.20mm irc hbg machine crushed chips with 14.60kg of bitumen for 10 sqm. of premix carpet including laying of seal coat a over the premix carpet using 0.09 cum of 6.70mm irc size hbg machine crushed chips with 9.80kg of bitumen per 10 sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rollingseparately as per most specification 509 and 513 (iii revision) including all labour charges hire and fuel charges formini hot mix plant, power roller 80-100kn capacity and all other tools and plants employed therefor etc.com. 64 km 0/0 -1/000 65 provision for information board 66 gst amount for providing service to government contract works for the above construction & maintenance works. { gst amount is the total gst amount for overall quoted amount (both construction and maintenance) above this row in column bb for all works in this package}
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results