BRR : 11177171
Click Here To View Tendering Authority. Aoc City/State :  Tiruvannamalai, Tamil Nadu
Tender Brief : Tender for Construction Of School Toilet In Pue School At Kuppam Panchayat In Thimiri Panchayat Union , Earth Work Excavation And Depositing On Bank With Initial Lead And Lift In Hard Gravelly Soil, Hard Stiff Clay, Black Cotton Soil, Hard Red Earth,Shales, Murram, And Earth Muds With 50% Fair Sized Boulders As Per Ss 20B For Narrow Foundation. , Cement Concrete 1:4:8 Mix Using 40Mm Metal Including Cost And Conveyanceof All Materials To Work Site And All Labour Charges Etc. , repair renovation Masonry In C.M 1:5 Mix Using Country Bricks Incuding Cost And Conveyance And All Labour Charges Etc.... Read More
Tender Value
Ref. Document
Contract Value
₹ 4,94,234.74
Submission Date
12-03-2026
Contract Date
26-05-2026
Completion Date
180 days
Participated Bidder List
2 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 4,95,810.04 L2
2 cnet-technologies Bid Analytics 4,94,234.74 L1
Work Detail
tender for construction of school toilet in pue school at kuppam panchayat in thimiri panchayat union , earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per ss 20b for narrow foundation. , cement concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. , repair renovation masonry in c.m 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. , brick work in c.m 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. , reinforced cement concrete 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. , supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. , column above grade beam , supply and fabrication of steel including cost and conveyance and alla labour charges etc. complete. , plastering with cement mortar 1:5, 12mm thick including cost and conveyance and all labour charges etc. , floor finishing with ceromic tiles of size 305 x 305 x 6 mm including cost including cost and conveyane , dadooing the wall tile in cm 1:2 including cost and conveyance of an labour charges etc., complete. , distembering two coats with best approved colour with priming coat over the new plastered surface including cost and conveyance of all materials to site and , painting two coats of newly plastered wall surface withready mixed palstic emulsion paint of first class quality including all charges , painting two coats of over new iron work such as steel doors including all charges , water closet indian types , european type wc , supply and fixing of wash basin , supply and fixing of urinal , supply and fixing of 500 lit hdpe tank , electrical arrangements , towards internal water supply arrangements , provision for pvc cowl , construction of compound wall , earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per ss 20b for narrow foundation. , cement concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. , brick work in cm 1:5 mix using country bricks including cost and conveyanceof all materials to work site and all labour charges etc. , reinforced cement concrete 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. , supply and fabrication of steel including cost and conveyance and alla labour charges etc. complete. , supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. , above basement , plastering with cement mortar 1:5, 12mm thick including cost and conveyance and all labour charges etc. , painting two coats of newly plastered wall surface withready mixed palstic emulsion paint of first class quality including all charges , provision for name board , provision for photo charges , gst amount for providing service to government contract works for the above construction & maintenance works. { gst amount is the total gst amount for overall quoted amount (both construction and maintenance) above this row in column bb for all works in this package} (refer clause 13.2 & 13.3 of section 2 of instruction to bidders (itb) of sbd)
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 07b7e53b-6ca8-49d0-9fe2-3bdee976e502 result notice
Download boqcomparativechart document
Download finance_808466 document
Download finsummary_808466 document
Download spr document
Download techsummary_808466 document
Download File Name File Description
Download BOQ_808466 Tender Documents
Download c3927933-d44f-4cfd-a24f-fd972a06d588 Tender Documents
Download Tendernotice_1 (1) Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000