BRR : 11031232
Tender Brief : Tender For In- Service Inspection Of Plant Equipments & Pipelines - Mobilization Of Skilled Manpower (Level- Ii & Iii) , Ndt Instruments, Required Consumables, Carrying Out Below Mentioned Ndt Activities And Submission Of Report Visual Examination - Thorough Examination Of The Entire Equipment/ Pipeline Loop Including Body, Nozzle, Studs, Washer & Supports As Instructed By The Engineer In-Charge For Any Dimensional Variation, Visual Crack, Surface Condition, Viz. Errosion , Corrosion Etc. Job Include Removal Of Insulation, Buffing & Grinding (If Any) For Inspection Hardness Measurement - Thor... Read More
Tender Value
₹
36,61,000
Submission Date
23-03-2026
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | |||||
| 3 | cnet-technologies | Bid Analytics |
Work Detail
tender for in- service inspection of plant equipments & pipelines - mobilization of skilled manpower (level- ii & iii) , ndt instruments, required consumables, carrying out below mentioned ndt activities and submission of report visual examination - thorough examination of the entire equipment/ pipeline loop including body, nozzle, studs, washer & supports as instructed by the engineer in-charge for any dimensional variation, visual crack, surface condition, viz. errosion , corrosion etc. job include removal of insulation, buffing & grinding (if any) for inspection hardness measurement - thorough grinding & cleaning of the surface, insulation removal (if any) prior to performing the test. non-denting equipment should be used and hardness should be taken at four diametrically opposite points in case of pipelines. one spot consist of three points, ultrasonic thickness measurement - thorough grinding & cleaning of the surface, insulation removal (if any) prior to performing the test. thickness should be taken at four diametrically opposite points in case of a pipeline using normal probe with a proper record of the results including percentage reduction in the thickness. job include removal of insulation for carrying out the test.
View Original Notice/Document
Result Documents
Tender Documents
| Download | File Name | File Description |
|---|---|---|
| Download | 41f20d0c-4ec4-48a1-908f-faac3224af10 | Tender Documents |
| Download | AERBSAFETYGUIDE | Tender Documents |
| Download | BOQ_948591 | Tender Documents |
| Download | Generalconditions | Tender Documents |
| Download | GENERALCONDITIONSOFCONTRACT | Tender Documents |
| Download | Tender | Tender Documents |
| Download | Tendernotice_1 (1) | Tender Documents |
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid
Similar Tenders Results