Tender Result - Tender For Boiler Ibr Jobs Work=- 2 Supply, Dismantling, Fabrication And Erection Of Front Header Tube Of Boiler No. 1 & 2 With Seam Less Stubs 4.5 Mm Thickness Suitable For 32 Ton Capacity, Working Pressure 35 Kg/Cm2, Superheated Temperature 400° C As Per Ibr Norm.A. Supply: Boiler Tubes (58 Nos. In Both Boilers). Approx. Length Of 1 Tube = 15 Mtr. Tube Size: 63.5Mm (Od), 3.66Mm Thickness.B. Material Specification And Fabrication: Tubes Should Be Confirming To Bs 3059 Part 1 Er W 320 (1978), Min Uts 3262 Kgf/Cm2, Fabricated As Per Drawing/Sample And Ibr Norms.C. Dismantling & Erection Of Front Header Tubes = 58 Nos. 3 Supply, Dismantling, Fabrication And Erection Of Side Header Tube Of Boiler No. 1 & 2 With Seam Less Stubs 4.5 Mm Thickness Suitable For 32 Ton Capacity, Working Pressure 35 Kg/Cm2, Superheated Temperature 400° C As Per Ibr Norm.A. Supply: Boiler Tubes (136 Nos. In Both Boilers). Approx. Length Of 1 Tube = 14 Mtr. Tube Size: 63.5Mm (Od), 3.66Mm Thickness.B. Material Specification And Fabrication: Tubes Should Be Confirming To Bs 3059 Part 1 Er W 320 (1978), Min Uts 3262 Kgf/Cm2, Fabricated As Per Drawing/Sample And Ibr Norms.C. Dismantling & Erection Of Front Header Tubes = 136 Nos 4 Dismantling Of Old Economizer Coils Of Boiler No. 1 & 2, Supply, Bending And Refitting As Per Drawing And Site Requirement.A. Supply: Coils (56 Nos. In Both Boilers). Approx. Length Of 1 Coil = 120 Mtr. Coil: 38.1Mm (Od), 4.5Mm Thickness.B. Material Specification And Fabrication: Coils Should Be Confirming To Bs 3059 Part 1 Erw 320 (1978), Min Uts 3262 Kgf/Cm2, Fabricated As Per Drawing/Sample And Ibr Norms. C. Dismantling & Erection Of Economizer Coils = 56 Nos 5 Dismantling Of Old Super Heater Coils Of Boiler No. 1 & 2, Supply, Bending And Refitting As Per Drawing And Site Requirement.A. Supply: Coils (60 Nos. In Both Boilers). Approx. Length Of 1 Coil = 34 Mtr. Coil Size: 45 Mm(Od), 4.5Mm Thicknessb. Material Specification And Fabrication: Coils Material Should Be Sa213 T22, Fabricated As Per Drawing/Sample And Ibr Norms.C. Dismantling & Erection Of Super Heater Coils = 60 Nos. 6 Dismantling, Supply, Bending And Erection Of Riser Tubes Of Boiler No. 1 & 2.A. Supply: Tubes (40 Nos. In Both Boilers). Size: 76.2 Mm (Od), 3.66 Mm Thickness.B. Material Specification And Fabrication: Tubes Should Be Confirming To Bs 3059 Part 1 Erw 320 (1978), Min Uts 3262 Kgf/Cm2, Fabricated As Per Drawing/Sample And Ibr Norms.C. Dismantling & Erection Of Riser Tubes = 40 Nos. 7 Supply, Dismantling, Fabrication And Erection Of Bank Tubes (Row 1-12) Of Boiler No. 1 & 2 Suitable For 32 Ton Capacity, Working Pressure 35 Kg/Cm 2 , And Superheated Temperature 400° C As Per Ibr Norm.A. Supply: Boiler Tubes (720 Nos. In Both Boilers). Approx. Length Of 1 Tube = 12 Mtr. Tube Size: 63.5Mm(Od), 3.66Mm Thickness.B. Material Specification And Fabrication: Tubes Should Be Confirming To Bs 3059 Part 1 Erw 320 (1978), Min Uts 3262 Kgf/Cm 2, Fabricated As Per Drawing/Sample And Ibr Norms.C. Dismantling & Erection Of Front Header Tubes = 720 Nos.

Tender Detail

10902148
Meham Cooperative Sugar Mills Limited
Tender For Boiler Ibr Jobs Work=- 2 Supply, Dismantling, Fabrication And Erection Of Front Header Tube Of Boiler No. 1 & 2 With Seam Less Stubs 4.5 Mm Thickness Suitable For 32 Ton Capacity, Working Pressure 35 Kg/Cm2, Superheated Temperature 400° C As Per Ibr Norm.A. Supply: Boiler Tubes (58 Nos. In Both Boilers). Approx. Length Of 1 Tube = 15 Mtr. Tube Size: 63.5Mm (Od), 3.66Mm Thickness.B. Material Specification And Fabrication: Tubes Should Be Confirming To Bs 3059 Part 1 Er W 320 (1978), Min Uts 3262 Kgf/Cm2, Fabricated As Per Drawing/Sample And Ibr Norms.C. Dismantling & Erection Of Front Header Tubes = 58 Nos. 3 Supply, Dismantling, Fabrication And Erection Of Side Header Tube Of Boiler No. 1 & 2 With Seam Less Stubs 4.5 Mm Thickness Suitable For 32 Ton Capacity, Working Pressure 35 Kg/Cm2, Superheated Temperature 400° C As Per Ibr Norm.A. Supply: Boiler Tubes (136 Nos. In Both Boilers). Approx. Length Of 1 Tube = 14 Mtr. Tube Size: 63.5Mm (Od), 3.66Mm Thickness.B. Material Specification And Fabrication: Tubes Should Be Confirming To Bs 3059 Part 1 Er W 320 (1978), Min Uts 3262 Kgf/Cm2, Fabricated As Per Drawing/Sample And Ibr Norms.C. Dismantling & Erection Of Front Header Tubes = 136 Nos 4 Dismantling Of Old Economizer Coils Of Boiler No. 1 & 2, Supply, Bending And Refitting As Per Drawing And Site Requirement.A. Supply: Coils (56 Nos. In Both Boilers). Approx. Length Of 1 Coil = 120 Mtr. Coil: 38.1Mm (Od), 4.5Mm Thickness.B. Material Specification And Fabrication: Coils Should Be Confirming To Bs 3059 Part 1 Erw 320 (1978), Min Uts 3262 Kgf/Cm2, Fabricated As Per Drawing/Sample And Ibr Norms. C. Dismantling & Erection Of Economizer Coils = 56 Nos 5 Dismantling Of Old Super Heater Coils Of Boiler No. 1 & 2, Supply, Bending And Refitting As Per Drawing And Site Requirement.A. Supply: Coils (60 Nos. In Both Boilers). Approx. Length Of 1 Coil = 34 Mtr. Coil Size: 45 Mm(Od), 4.5Mm Thicknessb. Material Specification And Fabrication: Coils Material Should Be Sa213 T22, Fabricated As Per Drawing/Sample And Ibr Norms.C. Dismantling & Erection Of Super Heater Coils = 60 Nos. 6 Dismantling, Supply, Bending And Erection Of Riser Tubes Of Boiler No. 1 & 2.A. Supply: Tubes (40 Nos. In Both Boilers). Size: 76.2 Mm (Od), 3.66 Mm Thickness.B. Material Specification And Fabrication: Tubes Should Be Confirming To Bs 3059 Part 1 Erw 320 (1978), Min Uts 3262 Kgf/Cm2, Fabricated As Per Drawing/Sample And Ibr Norms.C. Dismantling & Erection Of Riser Tubes = 40 Nos. 7 Supply, Dismantling, Fabrication And Erection Of Bank Tubes (Row 1-12) Of Boiler No. 1 & 2 Suitable For 32 Ton Capacity, Working Pressure 35 Kg/Cm 2 , And Superheated Temperature 400° C As Per Ibr Norm.A. Supply: Boiler Tubes (720 Nos. In Both Boilers). Approx. Length Of 1 Tube = 12 Mtr. Tube Size: 63.5Mm(Od), 3.66Mm Thickness.B. Material Specification And Fabrication: Tubes Should Be Confirming To Bs 3059 Part 1 Erw 320 (1978), Min Uts 3262 Kgf/Cm 2, Fabricated As Per Drawing/Sample And Ibr Norms.C. Dismantling & Erection Of Front Header Tubes = 720 Nos.
Rohtak
Haryana
Refer document
20-04-2026

Contract Award Details

Bidder List
Bids List
S.No Bid Number Bidder Name Submitted Date Status Remarks Status Updated On
1 111111 Dummy Name 13-Sep-2020 11:40 AM Dummy-Finance Dummy 17-Sep-2020 12:30 PM
2 111111 Dummy Name 14-Sep-2020 01:07 PM Dummy Dummy 31-May-2022 12:40 PM
Contract Date
01-01-0001
}
Contract Value
0.00
Awarded List
Awarded Bids List
S.No Bid Number Bidder Name Awarded Currency Awarded Value
1 11111 Dummy Dummy 0
}
Additional Details Available on Click
✓ Bidder List
✓ Contract Value
✓Awarded List

Tender Results Documents

Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.

Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail

WhatsApp